Quote:
Originally Posted by UofC.engineer
|
Nice thanks for posting. This is the most important Calgary Transit project right now outside of the Greenline.
I know the video is just a representation, but it appears that running in mixed-traffic will be the norm (i.e. therefore not true BRT). Limited stops and high-frequency headways will still be a big improvement though.
I did notice one person boarding through the back door. All-door boarding is such a small detail, but makes the system truly a game-changer and I hope they move to have this in place for the route from opening day.