Quote:
Originally Posted by roger1818
And let me guess, have the trillium line run down the tunnel as well. Might be good for the bridge, but it wouldn't be good for the tunnel. Off peak you would end up with one train every hour on the 4 different spurs to have service every 15 minutes downtown and east.
|
Why would a train every 15 minutes downtown be enough if you are serving the entire city? That is not even the case at midnight with the Transitway buses.
The limiting factor is during peak hours but with 4 branches, you could have a train every 8 minutes on each branch.
Regardless, if you send all those passengers to the train tunnel, you still have to handle the same number of passengers. The nice thing with branches is that you keep the number of transfers to a reasonable level.
I don't like the bus-train-train scenario. That just does not encourage people to make optional trips to downtown for shopping, festivals, concerts etc.
If we really want to enliven downtown, we need to make it easy to get there.