Toronto's Metrolinx has being buying up rail from CP& CN for the introduction of RER and now owns 80% of all GO commuter track up from 6% 16 years ago. Is this an option for the WCE corridor?
|
No.
GO benefits from a number of things that make what they do possible that don't really work in Vancouver
Firstly, in the 1960s the Federal Government built a new CN Mainline
around Toronto, away from the old Grand Trunk along the Lake shore and through Union Station, routing all through freight around Toronto and opening up a large swath of downtown land for development. This also reduced traffic on CN lines inside the new bypass line, which now only saw local freight. As carload freight has declined in importance and Toronto, this has made these lines more useful as passenger lines at the same time.
This cannot really be done in Vancouver, since the Vancouver waterfront originates significant amounts of containers and grain being loaded through the Port. While the CP Mainline isn't the only line serving the south shore of Burrard inlet, it is superior to the alternate CN/BNSF route from False Creek Flats, which is single tracked, has many grade crossings, a slow speed limit, and requires that all CP tracks be blocked by trains accessing the waterfront from False Creek.
Perhaps in the future technological or economic changes will render Vanterm and Centerm in Vancouver obsolete, and the line will be rendered available in a similar manner as the Caltrain line to San Francisco, but there's no evidence of that today.
Otherwise, GO and the Ontario Government have built their own tracks along side freight tracks in the right of way, some of which dates back to abortive preparations for GO-ALRT which were re-purposed for conventional GO Trains. Perhaps that could be done for WCE, but I don't know if it would be cost-effective to squeeze more tracks in.