  #1201  
Old Posted Dec 2, 2016, 9:57 AM
nname nname is offline
 
Join Date: Aug 2005
Posts: 5,107
Evergreen Line Extension should now move to the completed list, open today, December 2, 2016. There's still about 10hr till the first train though...
Reply With Quote
     
     
  #1202  
Old Posted Dec 3, 2016, 6:31 AM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,137
Reply With Quote
     
     
  #1203  
Old Posted Dec 3, 2016, 7:21 AM
ssiguy ssiguy is offline
 
Join Date: Mar 2006
Posts: 12,007
Why does every ribbon cutting ceremony now require the obligatory Native in their traditional garb?

Anyway, great day for transit in Vancouver. Someone from Vancouver should show Toronto how to build a transit line on-time and on-schedule. Actually someone from Toronto should go to Vancouver to see how SRT could operate if the TTC didn't run it into the ground.

How long are the trains in meters?
Reply With Quote
     
     
  #1204  
Old Posted Dec 3, 2016, 8:22 AM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,039
Half because it is the PC thing to do these days, but also half legitimately because much of the art at the stations was done by native artists, or, as I call them, Canadian artists
Reply With Quote
     
     
  #1205  
Old Posted Dec 3, 2016, 2:26 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
 
Join Date: Sep 2002
Posts: 22,898
Quote:
Originally Posted by ssiguy View Post
Why does every ribbon cutting ceremony now require the obligatory Native in their traditional garb?

Anyway, great day for transit in Vancouver. Someone from Vancouver should show Toronto how to build a transit line on-time and on-schedule. Actually someone from Toronto should go to Vancouver to see how SRT could operate if the TTC didn't run it into the ground.

How long are the trains in meters?
Jeebus

Vancouver is built in unceded First Nations territory. They belong at these events as much as the mayor. You live there. How can you not know this?

Why bring up Toronto and your unrelenting pursuit for it to copy upon Vancouver's success? Can't you just celebrate the opening of this extension.

Evergreen wasn't that late but, it still didn't come in on schedule.
Reply With Quote
     
     
  #1206  
Old Posted Dec 3, 2016, 3:17 PM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,039
5 months late I believe due to sinkholes during tunneling.

I have heard that in the end it was completed under budget by about 75 to 80 million dollars.

That is not bad when it comes to such major transportation projects.
Reply With Quote
     
     
  #1207  
Old Posted Dec 3, 2016, 4:19 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
 
Join Date: Sep 2002
Posts: 22,898
Not at all.

There are always unforeseen circumstances (like sinkholes) that can delay a project and its up to the ownership to decide whether to pay a lot more to meet the deadline or just accept that the date won't be met. A project that doesn't meet its target budget or target date is not necessarily a failure in project management. For a project to come in under budget may just mean someone overestimated the costs of it too.

It's the same thing with private public partnership. Yes, They get things done on time and budget but, let's not forget these capital provider are in it to make lots of money. You have to wonder if the short term gain is really worth it over the long haul for these publicly owned organizations.

Anywyas, Give it a rest ssiguy!
Reply With Quote
     
     
  #1208  
Old Posted Dec 3, 2016, 5:32 PM
milomilo milomilo is offline
 
Join Date: Dec 2013
Posts: 10,498
Quote:
Originally Posted by WhipperSnapper View Post
Not at all.

There are always unforeseen circumstances (like sinkholes) that can delay a project and its up to the ownership to decide whether to pay a lot more to meet the deadline or just accept that the date won't be met. A project that doesn't meet its target budget or target date is not necessarily a failure in project management. For a project to come in under budget may just mean someone overestimated the costs of it too.

It's the same thing with private public partnership. Yes, They get things done on time and budget but, let's not forget these capital provider are in it to make lots of money. You have to wonder if the short term gain is really worth it over the long haul for these publicly owned organizations.

Anywyas, Give it a rest ssiguy!
Are there contingencies built into the cost here? I know in the UK after massive cost overruns with big projects like the Channel Tunnel etc, there are now substantial (~60%) contingencies as they know there will be lots of unforeseen issues. This has resulted in most projects now being built on budget, when you remove cost rises due to scope creep.
Reply With Quote
     
     
  #1209  
Old Posted Dec 3, 2016, 6:37 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
 
Join Date: Jul 2013
Posts: 3,794
Updated. The next completed project should be ION.
Reply With Quote
     
     
  #1210  
Old Posted Dec 3, 2016, 9:52 PM
nname nname is offline
 
Join Date: Aug 2005
Posts: 5,107
Quote:
Originally Posted by milomilo View Post
Are there contingencies built into the cost here? I know in the UK after massive cost overruns with big projects like the Channel Tunnel etc, there are now substantial (~60%) contingencies as they know there will be lots of unforeseen issues. This has resulted in most projects now being built on budget, when you remove cost rises due to scope creep.
The project management and contingencies is 20% for the Evergreen I believe.
Reply With Quote
     
     
  #1211  
Old Posted Dec 4, 2016, 12:17 AM
Horus's Avatar
Horus Horus is offline
 
Join Date: Jul 2013
Posts: 1,214
Quote:
Originally Posted by SkahHigh View Post
Updated. The next completed project should be ION.
Only if Bombardier can actually produce any trains....
Reply With Quote
     
     
  #1212  
Old Posted Dec 4, 2016, 4:45 AM
ssiguy ssiguy is offline
 
Join Date: Mar 2006
Posts: 12,007
Anyway, how large are the trains?
Reply With Quote
     
     
  #1213  
Old Posted Dec 4, 2016, 8:07 AM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,039
Evergreen trains are the same trains as existing Skytrain.
Reply With Quote
     
     
  #1214  
Old Posted Dec 4, 2016, 8:17 PM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,137
what is the ION?
Reply With Quote
     
     
  #1215  
Old Posted Dec 4, 2016, 10:30 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
 
Join Date: Jan 2010
Posts: 12,909
^Kitchener Waterloo LRT line
Reply With Quote
     
     
  #1216  
Old Posted Dec 4, 2016, 11:48 PM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,137
oh ok. cool.
Reply With Quote
     
     
  #1217  
Old Posted Dec 5, 2016, 12:15 AM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
 
Join Date: Sep 2002
Posts: 22,898
Quote:
Originally Posted by milomilo View Post
Are there contingencies built into the cost here? I know in the UK after massive cost overruns with big projects like the Channel Tunnel etc, there are now substantial (~60%) contingencies as they know there will be lots of unforeseen issues. This has resulted in most projects now being built on budget, when you remove cost rises due to scope creep.
There certainly are and I'm sure it's a substantial amount for these private public partnership. They always have to contend with penalties for delivering late. In the case of the Evergreen Line, it must of made more sense to pay the penalties than to pay the overtime to make up for lost time.
Reply With Quote
     
     
  #1218  
Old Posted Dec 5, 2016, 5:03 AM
osirisboy's Avatar
osirisboy osirisboy is online now
 
Join Date: Mar 2006
Posts: 6,432
Quote:
Originally Posted by WhipperSnapper View Post
Jeebus

Vancouver is built in unceded First Nations territory. They belong at these events as much as the mayor. You live there. How can you not know this?

Why bring up Toronto and your unrelenting pursuit for it to copy upon Vancouver's success? Can't you just celebrate the opening of this extension.

Evergreen wasn't that late but, it still didn't come in on schedule.
Ugh. He was wondering why they always are in traditional dress, not questioning them being there
Reply With Quote
     
     
  #1219  
Old Posted Dec 5, 2016, 5:34 AM
casper's Avatar
casper casper is online now
 
Join Date: Nov 2011
Posts: 13,046
Quote:
Originally Posted by Horus View Post
Only if Bombardier can actually produce any trains....
Expo, Millennium (including the new Evergreen extension) also run Bombardier cars. So they can product trains. The Mark 3 trains look quite nice.

The delay is minor (and in my books close enough to declare it on time). Good they came in under budget. There is always contingency on these types of projects and when you tender out the sub-projects there can be a big difference in the cost of trades based on market conditions.

Nice project, great addition to Vancouver. Surprised Ontario does not use more of the Skytrain technology. Bombardier keeps picking up the odd project based on the technology in Asia and it has a foothold in New York with the JFK Airtrain. The trains are manufactured in Ontario, since Bombardier shutdown the Vancouver plant.
Reply With Quote
     
     
  #1220  
Old Posted Dec 5, 2016, 5:39 AM
casper's Avatar
casper casper is online now
 
Join Date: Nov 2011
Posts: 13,046
Quote:
Originally Posted by osirisboy View Post
Ugh. He was wondering why they always are in traditional dress, not questioning them being there
Fewer and fewer people wear suits and ties as there regular day to day dress especially on the west coast. However for special occasions it is customary to put on traditional business attire (a suit and tie) for many with a western background as a show of respect.

For leaders in the first nation community they probably wear business casual in casual setting and put on traditional attire as a show of respect for a special event.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 4:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.