View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7381  
Old Posted Nov 28, 2016, 7:26 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,218
Quote:
Originally Posted by ronthecivil View Post
Well you can always value engineer the stations and end up over capacity on the mainline expo line tracks within a generation or within a year in the case of the Canada line.

Heck, even if you don't build the whole station, at least make the track grade flat enough for a reasonable amount in either direction so you can at least make the station longer in the future.

What does Vancouver do once the expo line is at capacity? It's almost there, and there's not much that can be done in terms of longer trains or faster frequency, both are already very close to maxed out.
The Canada Line can almost trip it's capacity with purchases of rolling stock and a 10m station extension. It will be fine for quite a while yet.

Regarding the Expo Line, it would be just about time for a parallel line to be built and for the existing Expo Line to be refurb'd anyways. We haven't got any 5 car Mk3 trains yet, and there's still plenty of opportunity for expansions left.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #7382  
Old Posted Nov 28, 2016, 7:41 PM
VarBreStr18 VarBreStr18 is offline
Registered User
 
Join Date: Nov 2014
Posts: 750
Quote:
Originally Posted by ronthecivil View Post
Well, with the amount of money budgeted for doing a bored tunnel, you can have much more elegant steel supports or what not. Prefab lots of stuff. A wise old traffic guy once preached to me about splitting it into two steel structures so they only hold one track each, and was pretty sure it would even look good.

Not saying it's an ideal situation. There's still disruption.

But the thought that there's no disruption from bored tunnel is just sad. And wrong.

Sure, you can offset the stations a little bit, but it's still going to encroach. And the more you offset it, the more difficult to access the stations it is after the fact.

I am on the same boat as everyone going for cut and cover under 10th. But why let planners and engineers decide these things? That's why we elect activists and lawyers... To make planning and engineering decisions!
Can someone pls do a poll similar to the header to this thread as to preference of route under 10th Ave vs Broadway?
     
     
  #7383  
Old Posted Nov 28, 2016, 10:22 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by ronthecivil View Post
What does Vancouver do once the expo line is at capacity? It's almost there, and there's not much that can be done in terms of longer trains or faster frequency, both are already very close to maxed out.
I hardly think it's maxed out, otherwise we would have 6-car Mark II/III trains with the lead/tail car sticking out past the station to take advantage of the articulated vehicle. (Which is basically the only cheap option and can only be done as long as there's no switch on both sides of the station.) Imagine "D" cars with no doors and additional standing room as the end cars.

There are benefits and downsides to nearly every option:

1: Status quo - Once we run out of train headway (I'm sure the software could be tuned or a train every 15 seconds if we wanted, there just wouldn't be enough space to allow it to operate at optimal speed and not bunch up outside stations) we do nothing.

2: Build a parallel line across the busiest section and connect it to the same tracks. The busiest section is Likely the Waterfront to Broadway segment, but that is a result of what is at Broadway, the 99 B-line, which is capacity constrained. The Expo line tends to be maxed out on the inbound track by the time it gets there. This results in maxed out trains at Main street as well in both directions. So this can't really be considered until VCC Clark to Arbutus is built, as UBC traffic will be redirected to the Millennium Line, and those who are on the line will transfer at Cambie if they want to go downtown instead of going to Commercial Drive and then backtracking. Likewise people going to the Ferry will take the Millennium Line and transfer at Cambie to leave at Bridgeport.

When a Parallel line is needed, it would be the Hastings Line, it would be built from the existing Waterfront station (eg the Expo line would just continue since it basically turns around at Waterfront) and continue eastward down Hastings. Or a new line entirely can go from Hastings to under Stanley Park and into North/West Vancouver.

3: Build larger wider cars. This idea has been floated here before, Bombardier makes a wider version. The problem? It would require replacing all the existing guideway. I'm sure replacing it one piece at a time is possible given the construction method, and then upgrade the stations once the guideway is widened, the problem is that it would require shutting down pieces of the track for years, and then the stations. 2.65m to 3.2m. That adds just 0.55m. (Canada Line trains are 3m.) This is essentially the same as rebuilding the entire system, and would cost about the same as a new system.

4: Build taller cars. Hey if you can't wider, maybe go taller. Making room for all the above-grade stations would be possible, but not for the tunneled stations (Burrard, Granville) or the new evergreen line tunnel. There may also be weight restrictions for the existing guideway and bridge. A "double deck" set of cars would likely only run from Stadium to Surrey, and even then due to the location of switches, it would likely only go to the third platform at Stadium. Assuming this was possible, (I'd have to wonder if the trains wouldn't be knocked over during high winds) you would get a capacity increase similar to a double-deck bus from a regular 40' bus. This would also require reprogramming the computer systems to avoid sending taller cars into areas that they don't fit. From a safety point of view you wouldn't want to do this option.


5: Double-deck the guideway. Similar to the previous option, build another deck over the existing deck. The NIMBY's will howl over this, but it's the only option that doesn't require appropriating additional land. It would however require removing a floor from the Vancity building at Main street, and to expand the tunnel between Main street and Waterfront. This would require shutting down the entire segment while they blast/mine out the Dunsmuir tunnel, and that has it's own stability questions. They would then likely need to expand those stations so that boarding can be done from both sides. From an engineering point of view, this might be the better option since the original elevated stations would just get additional floors. This of course would be the same as building an entirely new line, so it likely would be seriously considered only after other parallel line options (eg Hastings, 41st or 49th) have been exhausted.


All of the above have been considering the east-west direction. If we consider the north-south direction instead:

- Build a perpendicular line at Willingdon in Burnaby, thus the commuters that are trying to get to Burnaby from terminus points at the Expo line don't have to switch at Commercial/Broadway. This connects Brentwood to Metrotown and a future Hastings Line. Thus people who need to get to to/from Burnaby have three options. This provides relief to the Expo line since commuters coming from north Burnaby, wouldn't try to get on the Expo line from the Millennium Line. But again, the requirements for this pretty much requires a second route into downtown Vancouver (eg Hastings), but could also terminate in North Vancouver (at Capilano University.)

- Build a perpendicular line at PNE, Rupert Station, Joyce Station, and then go West on 41st, connecting to Cambie and Arbutus through Kerrisdale and back up to UBC. This assumes something may eventually be built at Arbutus.

- Build a subway under Arbutus, under False Creek, under Stanley Park and into North/West Vancouver at around Marine Dr. The Lions gate area is less than 20 meters deep while most of port area has depths up to 40 meters. If this line existed, it would provide relief to the Expo Line by virtue of eliminating the Seabus. This would also be a dangerous excavation since the sea would want to push into the tunnels. Keep in mind that shipping concerns may way to dredge the Lions Gate bridge area.


So things to consider:
a) Where does the commuter traffic come from. The current numbers suggest that the Seabus (Expo Terminus), Main Street, and Broadway/Commerical Drive (due to the 99) are the choke points into Vancouver, but the traffic direction of the 99 is towards UBC

So extending the Millennium Line to UBC, makes the most sense at present. Once that is done, the commuter traffic should re-arrange itself so that students take the Canada Line to get to the Millenium Line instead of the Expo Line. This doesn't solve the Seabus problem.

b) The Seabus is a choke point, one that we can't fix by adding more ships, because marine traffic is not predictable. The existing terminals support two ships at each end, in theory they could make them support additional ones, but it's really a question of where to store the ones that aren't in service. One medical emergency or mechanical problem with the ship or the terminal and everything comes to a halt.

At some point there will be some serious thought into running a Subway under Stanley Park, somewhere between Brockton Point and the Lions Gate Bridge. This will run into opposition by those who wish to build a car tunnel or replacement of the Lions Gate bridge to North Vancouver instead. What makes the most long-term sense is a permanent tunnel, but it's not unreasonable to build a new bridge/third crossing and incorporate a rapid transit component into the bridge design.

c) A Hastings Line makes the most sense for a parallel line that goes into Downtown Vancouver and through Burnaby. If there is no Arbutus line to cross into North Vancouver at the first narrows, then the next possible option is with a Hastings Line at either the First Narrows (Lions Gate) or Second Narrows (Ironworkers Memorial Bridge) could be done. However a second narrows crossing makes more sense with North-South route (eg Willingdon)

d) A Willingdon Line would probably be the most logical route to connect to North Vancouver through the second Narrows, and go all the way to at least Metrotown (Connecting the PNE, Brentwood, BCIT, and Metrotown)

This is all trying to think 30 years into the future. For the most part, whatever benefits Downtown Vancouver tends to benefit the entire region, but this assumes that the majority of the traffic has it's destination as downtown. Both Burnaby and Surrey have commercial and Retail cores that are connected already to the Expo Line, and as such there should be a similar demand in traffic to reach these city cores. If people instead take a potential Arbutus or Hastings Line out of downtown, then people will not be heading to these destinations.

In the case of a Canada Line, it's the only line that is going to be going to the Airport. If an Arbutus line is built, it will not also terminate at the Airport, rather it would require a transfer to the Canada Line at some point, which means it needs to connect to connect to Bridgeport or Marine Dr., even though Templeton might be closer. So I believe what is going to happen whenever something is done with Arbutus, is that it will likely just end at 49th and something else run perpendicular with it. If it goes any further south, it would come with a requirement to redevelop all the single family homes into highrises.
     
     
  #7384  
Old Posted Nov 28, 2016, 11:12 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
Expo Line platforms were designed to be lengthened - maybe to 100m(?)
i.e. for each of the centre platform stations, the guideways diverge far enough away from the platform to add length to the platform.
     
     
  #7385  
Old Posted Nov 29, 2016, 4:57 PM
ronthecivil ronthecivil is offline
Registered User
 
Join Date: Nov 2016
Posts: 69
Quote:
Originally Posted by officedweller View Post
Expo Line platforms were designed to be lengthened - maybe to 100m(?)
i.e. for each of the centre platform stations, the guideways diverge far enough away from the platform to add length to the platform.
That's encouraging. Really all I really care about is pushing the leading flat grades out a bit and pushing the switches back far enough that you can do that.

But if you see the giant list of potential upgrades to the skytrain above, you can see why I lament the marginal savings of having extra long stations.....
     
     
  #7386  
Old Posted Nov 29, 2016, 5:55 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
With the City pushing through its 10th Avenue agenda to make it more difficult for those in need to access the area around VGH, you can likely connect the dots that, from the City's perspective, the Broadway extension will truly be under Broadway and not 10th Avenue.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #7387  
Old Posted Nov 29, 2016, 8:06 PM
Genauso's Avatar
Genauso Genauso is offline
A hole being Doug
 
Join Date: Dec 2013
Posts: 498
One thing about Broadway that some people might not be aware of, is that runs along a hill.

The effective walking distance multiplies when going up/down a hill, and walking distance itself is a multiple of what people might be imagining looking at a map where they are used to thinking in terms of driving time.

Either build it right, or not at all. There is no sense in spending money, only to regret the final product.
     
     
  #7388  
Old Posted Nov 29, 2016, 10:12 PM
ronthecivil ronthecivil is offline
Registered User
 
Join Date: Nov 2016
Posts: 69
Quote:
Originally Posted by Kisai View Post
I hardly think it's maxed out, otherwise we would have 6-car Mark II/III trains with the lead/tail car sticking out past the station to take advantage of the articulated vehicle. (Which is basically the only cheap option and can only be done as long as there's no switch on both sides of the station.) Imagine "D" cars with no doors and additional standing room as the end cars.

There are benefits and downsides to nearly every option:

1: Status quo - Once we run out of train headway (I'm sure the software could be tuned or a train every 15 seconds if we wanted, there just wouldn't be enough space to allow it to operate at optimal speed and not bunch up outside stations) we do nothing.

2: Build a parallel line across the busiest section and connect it to the same tracks. The busiest section is Likely the Waterfront to Broadway segment, but that is a result of what is at Broadway, the 99 B-line, which is capacity constrained. The Expo line tends to be maxed out on the inbound track by the time it gets there. This results in maxed out trains at Main street as well in both directions. So this can't really be considered until VCC Clark to Arbutus is built, as UBC traffic will be redirected to the Millennium Line, and those who are on the line will transfer at Cambie if they want to go downtown instead of going to Commercial Drive and then backtracking. Likewise people going to the Ferry will take the Millennium Line and transfer at Cambie to leave at Bridgeport.

When a Parallel line is needed, it would be the Hastings Line, it would be built from the existing Waterfront station (eg the Expo line would just continue since it basically turns around at Waterfront) and continue eastward down Hastings. Or a new line entirely can go from Hastings to under Stanley Park and into North/West Vancouver.

3: Build larger wider cars. This idea has been floated here before, Bombardier makes a wider version. The problem? It would require replacing all the existing guideway. I'm sure replacing it one piece at a time is possible given the construction method, and then upgrade the stations once the guideway is widened, the problem is that it would require shutting down pieces of the track for years, and then the stations. 2.65m to 3.2m. That adds just 0.55m. (Canada Line trains are 3m.) This is essentially the same as rebuilding the entire system, and would cost about the same as a new system.

4: Build taller cars. Hey if you can't wider, maybe go taller. Making room for all the above-grade stations would be possible, but not for the tunneled stations (Burrard, Granville) or the new evergreen line tunnel. There may also be weight restrictions for the existing guideway and bridge. A "double deck" set of cars would likely only run from Stadium to Surrey, and even then due to the location of switches, it would likely only go to the third platform at Stadium. Assuming this was possible, (I'd have to wonder if the trains wouldn't be knocked over during high winds) you would get a capacity increase similar to a double-deck bus from a regular 40' bus. This would also require reprogramming the computer systems to avoid sending taller cars into areas that they don't fit. From a safety point of view you wouldn't want to do this option.


5: Double-deck the guideway. Similar to the previous option, build another deck over the existing deck. The NIMBY's will howl over this, but it's the only option that doesn't require appropriating additional land. It would however require removing a floor from the Vancity building at Main street, and to expand the tunnel between Main street and Waterfront. This would require shutting down the entire segment while they blast/mine out the Dunsmuir tunnel, and that has it's own stability questions. They would then likely need to expand those stations so that boarding can be done from both sides. From an engineering point of view, this might be the better option since the original elevated stations would just get additional floors. This of course would be the same as building an entirely new line, so it likely would be seriously considered only after other parallel line options (eg Hastings, 41st or 49th) have been exhausted.


All of the above have been considering the east-west direction. If we consider the north-south direction instead:

- Build a perpendicular line at Willingdon in Burnaby, thus the commuters that are trying to get to Burnaby from terminus points at the Expo line don't have to switch at Commercial/Broadway. This connects Brentwood to Metrotown and a future Hastings Line. Thus people who need to get to to/from Burnaby have three options. This provides relief to the Expo line since commuters coming from north Burnaby, wouldn't try to get on the Expo line from the Millennium Line. But again, the requirements for this pretty much requires a second route into downtown Vancouver (eg Hastings), but could also terminate in North Vancouver (at Capilano University.)

- Build a perpendicular line at PNE, Rupert Station, Joyce Station, and then go West on 41st, connecting to Cambie and Arbutus through Kerrisdale and back up to UBC. This assumes something may eventually be built at Arbutus.

- Build a subway under Arbutus, under False Creek, under Stanley Park and into North/West Vancouver at around Marine Dr. The Lions gate area is less than 20 meters deep while most of port area has depths up to 40 meters. If this line existed, it would provide relief to the Expo Line by virtue of eliminating the Seabus. This would also be a dangerous excavation since the sea would want to push into the tunnels. Keep in mind that shipping concerns may way to dredge the Lions Gate bridge area.


So things to consider:
a) Where does the commuter traffic come from. The current numbers suggest that the Seabus (Expo Terminus), Main Street, and Broadway/Commerical Drive (due to the 99) are the choke points into Vancouver, but the traffic direction of the 99 is towards UBC

So extending the Millennium Line to UBC, makes the most sense at present. Once that is done, the commuter traffic should re-arrange itself so that students take the Canada Line to get to the Millenium Line instead of the Expo Line. This doesn't solve the Seabus problem.

b) The Seabus is a choke point, one that we can't fix by adding more ships, because marine traffic is not predictable. The existing terminals support two ships at each end, in theory they could make them support additional ones, but it's really a question of where to store the ones that aren't in service. One medical emergency or mechanical problem with the ship or the terminal and everything comes to a halt.

At some point there will be some serious thought into running a Subway under Stanley Park, somewhere between Brockton Point and the Lions Gate Bridge. This will run into opposition by those who wish to build a car tunnel or replacement of the Lions Gate bridge to North Vancouver instead. What makes the most long-term sense is a permanent tunnel, but it's not unreasonable to build a new bridge/third crossing and incorporate a rapid transit component into the bridge design.

c) A Hastings Line makes the most sense for a parallel line that goes into Downtown Vancouver and through Burnaby. If there is no Arbutus line to cross into North Vancouver at the first narrows, then the next possible option is with a Hastings Line at either the First Narrows (Lions Gate) or Second Narrows (Ironworkers Memorial Bridge) could be done. However a second narrows crossing makes more sense with North-South route (eg Willingdon)

d) A Willingdon Line would probably be the most logical route to connect to North Vancouver through the second Narrows, and go all the way to at least Metrotown (Connecting the PNE, Brentwood, BCIT, and Metrotown)

This is all trying to think 30 years into the future. For the most part, whatever benefits Downtown Vancouver tends to benefit the entire region, but this assumes that the majority of the traffic has it's destination as downtown. Both Burnaby and Surrey have commercial and Retail cores that are connected already to the Expo Line, and as such there should be a similar demand in traffic to reach these city cores. If people instead take a potential Arbutus or Hastings Line out of downtown, then people will not be heading to these destinations.

In the case of a Canada Line, it's the only line that is going to be going to the Airport. If an Arbutus line is built, it will not also terminate at the Airport, rather it would require a transfer to the Canada Line at some point, which means it needs to connect to connect to Bridgeport or Marine Dr., even though Templeton might be closer. So I believe what is going to happen whenever something is done with Arbutus, is that it will likely just end at 49th and something else run perpendicular with it. If it goes any further south, it would come with a requirement to redevelop all the single family homes into highrises.
Lots of good quality in there. Just a few of my two cent...

Based on reports from Translink themselves where they have studied it, the lowest headway you can have on the expo line is 90 seconds as you have to decelerate in, unload, load, then accelerate your way out. Having the long trains where you can only exit from half of it increases that loading time. The loading time is the main driver for doing the (Swedish, Spanish?) solution at Broadway station.

The third platform and track at Stadium used to run all the way to Waterfront. Not sure how hard it would be to recommission the tunnel but not impossible. So there's a bit more capacity there. (You could run single trains in the peak directions and they could just return empty.)

I have schemed of ideas where you extend Waterfront station out and then wrap it right back around into a tunnel under downtown. Not only would you get a route to the North shore, you could have stations in the west end, coal harbor etc. And since that would be a bored tunnel for sure (makes sense here) you would just make sure that by the time you hit the first narrows that yer real, real deep. It's not like you need a station in the middle of the Stanley park forest that it's a big deal to get a station to.
     
     
  #7389  
Old Posted Nov 29, 2016, 10:16 PM
ronthecivil ronthecivil is offline
Registered User
 
Join Date: Nov 2016
Posts: 69
Quote:
Originally Posted by Genauso View Post
One thing about Broadway that some people might not be aware of, is that runs along a hill.

The effective walking distance multiplies when going up/down a hill, and walking distance itself is a multiple of what people might be imagining looking at a map where they are used to thinking in terms of driving time.

Either build it right, or not at all. There is no sense in spending money, only to regret the final product.
Cut and cover under tenth makes shallower stations which leads to short ingress/egress times. Not to mention possible options for some natural light, better incorporation into nearby developments, etc.

But politics doesn't seem to understand this, and underestimates the amount of disruption that a bored tunnel can cause. It's not a magic cure for surface disruption....
     
     
  #7390  
Old Posted Nov 29, 2016, 11:15 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
Quote:
Originally Posted by ronthecivil View Post
The third platform and track at Stadium used to run all the way to Waterfront.
No, it didn't.

The third platform was used during Expo 86 for a Canada Pavillion shuttle train that interlined using the existing track. It had a cross platform transfer from the Expo Monorail (to the south).

A dedicated SkyTrain Canada Place / Canada Pavilion shuttle would enter the third platform, load up, then proceed east to the switches near the dip, then reverse direction and use the existing tracks. The Canada Pavilion shuttles were interlined with regular SkyTrain trains - announcements on the shuttle while it was waiting often said "we are waiting for a revenue train to clear the track" or words to that effect.

At Waterfront, the existing centre platform was divided by a chain ink fence. Canada Pavilion shuttles would stop on one side with exclusive access to the Howe Street entrance (which was within Expo 86 grounds), while the other side of the platform was open for revenue service via the CP Station. Trains would switch before (west of) the station platform to access the Expo 86 side.
     
     
  #7391  
Old Posted Nov 30, 2016, 12:33 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,805
Quote:
Originally Posted by ronthecivil View Post
The third platform and track at Stadium used to run all the way to Waterfront.
I have been a commuter on the Expo line since it opened, and during Expo 86 I took many rides on the Expo shuttle between Stadium and Waterfront for which the third platform at Stadium was originally constructed. I can assure you that there have never, ever been more than two tracks inbound of Stadium station.
     
     
  #7392  
Old Posted Dec 1, 2016, 12:47 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by aberdeen5698 View Post
I have been a commuter on the Expo line since it opened, and during Expo 86 I took many rides on the Expo shuttle between Stadium and Waterfront for which the third platform at Stadium was originally constructed. I can assure you that there have never, ever been more than two tracks inbound of Stadium station.
I floated this idea towards the "double-deck train or double-deck guideway" option. Essentially if you can't build a parallel tunnel, you'd need a separate space that stops before going into the tunnel so that other trains don't block it's exit, and the third platform at stadium would be an existing way to do so. I don't put too much stock in either of these options because one thing that politics of BC does poorly is plan ahead.

The Expo line may have expandable platforms, but it's very likely we're only getting them now with the station renovations, because hanging the cars outside of the station would have the "move to the back of the bus please" problem the buses have where people hang around the doors instead of moving down.
     
     
  #7393  
Old Posted Dec 1, 2016, 1:19 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Buzzer article from 2010 about the third platform at Stadium: http://buzzer.translink.ca/2010/07/why-is-there-a-third-platform-at-stadium-chinatown-station/
     
     
  #7394  
Old Posted Dec 5, 2016, 3:16 AM
OhioGuy OhioGuy is offline
Registered User
 
Join Date: Jul 2004
Location: DC
Posts: 7,777
Alright, Evergreen is open. Now get this one financed & under construction
     
     
  #7395  
Old Posted Dec 5, 2016, 3:38 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,056
Quote:
Originally Posted by OhioGuy View Post
Alright, Evergreen is open. Now get this one financed & under construction
you got that right!
     
     
  #7396  
Old Posted Dec 14, 2016, 1:06 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Has is been pre-set and determined that the Millenium Line will be extended from VCC to Broadway-City Hall? By what route?

When I look at a map it makes sense to go elevated or at grade to Olympic Village station and then to go into the hill somewhere west of Cambie Street.
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #7397  
Old Posted Dec 14, 2016, 1:21 AM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,729
Quote:
Originally Posted by Olden Retreiver View Post
Has is been pre-set and determined that the Millenium Line will be extended from VCC to Broadway-City Hall? By what route?

When I look at a map it makes sense to go elevated or at grade to Olympic Village station and then to go into the hill somewhere west of Cambie Street.
To the best of my knowledge, the line will run west from VCC-Clark on an elevated viaduct that descends down to an at-/slightly below-grade station in the new Emily Carr precinct. It will then descend into a tunnel and turn southwest to bore under Great Northern Way and generally under that big hill/escarpment at the foot of Fraser with the next station being underground in the general Broadway-Kingsway-Main area (my money is on a station built in the west Kingsgate Mall parking lot and designed to have a mixed-use redevelopment built around and on top of it).

From there it's a straight westward shot beneath Broadway with stations at Cambie, Oak, Granville, and Arbutus (basically mimicking the station spacing of the 99 B-Line). That would be phase 1 of the project and Arbutus would be its terminus (barring mana from heaven and a scope expansion of the project to just go all the way to UBC in one go, which I think is increasingly likely).
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7398  
Old Posted Dec 14, 2016, 1:22 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by Olden Retreiver View Post
Has is been pre-set and determined that the Millenium Line will be extended from VCC to Broadway-City Hall? By what route?

When I look at a map it makes sense to go elevated or at grade to Olympic Village station and then to go into the hill somewhere west of Cambie Street.
It will most likely be terminating at Arbutus with a future extension to UBC. It will also be a subway.
     
     
  #7399  
Old Posted Dec 14, 2016, 1:29 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
This map from TransLink's website gives a pretty good idea of the current, basic plans for the alignment:


http://www.translink.ca/en/Plans-and-Pro...rojects/Broadway-SkyTrain-Extension.aspx
     
     
  #7400  
Old Posted Dec 14, 2016, 3:00 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
From the GNW Campus thread.

This shows the alignment as of 2012/13 where the line stays near the BNSF tracks and veers up Brunswick St.
Probably hasn't changed since.
The previous 2008 alignment was more central to the campus lands and turned up Guelph St. and is shown in the report.
The 1999 "Beyond the B-Line" reference alignment showed an alignment up Prince Edward St.

You'd want the line to get back up to Broadway as soon as possible, since the hill between West 2nd/6th and Broadway would be a barrier to transit use.
A station near Kingsgate is more central to Mt Pleasant and passengers headed for VGH, Broadway offices, etc. wouldn't want to take a one stop ride from Olympic Village to Broadway-City Hall.

Quote:
Originally Posted by officedweller View Post
Latest CoV planning document - shows M-Line route:

http://former.vancouver.ca/ctyclerk/cclerk/20130424/documents/ptec7.pdf

http://former.vancouver.ca/ctyclerk/cclerk/20130424/documents/ptec7.pdf

Note that Brunswick St. might make it difficult to have an alignment under 10th Ave. because of Kingsgate Mall redevelopment (i.e. depth of tunnel)


https://www.bing.com/maps?q=Prince+edward+st+vancouver&mkt=en&FORM=HDRSC4

Last edited by officedweller; Dec 14, 2016 at 3:20 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.