HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #15661  
Old Posted Nov 22, 2016, 9:14 PM
Bcasey25raptor's Avatar
Bcasey25raptor Bcasey25raptor is offline
Registered User
 
Join Date: Sep 2011
Location: Vancouver Suburbs
Posts: 2,886
Quote:
Originally Posted by AverageJoe View Post
So am I. I hope this means it is being replaced by conventional buses. It didn't say so specifically.
Heres what the sign said at the stop near terminal
__________________
River District Big Government progressive
~ Just Watch me
- Pierre Elliot Trudeau
     
     
  #15662  
Old Posted Nov 22, 2016, 9:20 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 956
Very pleased with the downtown changes.

The C23 was the busiest community shuttle route ever - so glad it is now just the #6. Many West End commuters will be very happy.
     
     
  #15663  
Old Posted Nov 22, 2016, 9:45 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,104
Quote:
Originally Posted by AverageJoe View Post
So am I. I hope this means it is being replaced by conventional buses. It didn't say so specifically.
Most likely shuttle though. TransLink had stopped using Cxx numbering schemes for new shuttle routes.
     
     
  #15664  
Old Posted Nov 22, 2016, 10:29 PM
Large Cat's Avatar
Large Cat Large Cat is offline
Vancouver Bus Driver
 
Join Date: Oct 2014
Location: Vancouver, BC
Posts: 396
It looks like the new 23 won't even be going directly past Yaletown Station--there could be a couple reasons for this departure from the original C21 routing. The most likely imo is that they don't want people going all the way to English Bay to fill up all the spots on the community shuttles--assuming the 23 will still be partly or mostly shuttles. This was the most pressing rationale for the whole set of changes in the first place. Now the 6 can cover all of that traffic.

It could also be because the routing between Howe and Yaletown Stn would be too tight for conventional buses, so they decided to keep the route on Pacific all the way. This is assuming that they will either now or eventually put some 40 footers on the route.

In any case I'm really happy with the changes.

Also, it looks like 5/6 operators will now be taking their layovers exclusively at Cambie and Dunsmuir, from looking at the paddles. This will make it into a much better loop line--no more waiting at Davie and Denman or transferring to the bus in front! The bus will just keep going with a change in headsign. The Canada Line and 17 can cover most of the thru passengers in the Yaletown area, since it won't make much sense to get on somewhere on Cambie and ride it to the CBD, or get on somewhere on Pender and ride it to a destination prior to Yaletown Stn. (Because one would have to wait at Cambie and Dunsmuir on the way) In the West End if the layover were to remain there are less alternatives, especially for getting to Robson or the CBD.
     
     
  #15665  
Old Posted Nov 23, 2016, 12:25 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Bcasey25raptor View Post
Heres what the sign said at the stop near terminal
<snip>
"travelling to the Expo Line? ... "

.. or take the 5 Robson to Burrard Stn.
(less walking)
     
     
  #15666  
Old Posted Nov 23, 2016, 12:30 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Large Cat View Post
It looks like the new 23 won't even be going directly past Yaletown Station--there could be a couple reasons for this departure from the original C21 routing. The most likely imo is that they don't want people going all the way to English Bay to fill up all the spots on the community shuttles--assuming the 23 will still be partly or mostly shuttles. This was the most pressing rationale for the whole set of changes in the first place. Now the 6 can cover all of that traffic.

It could also be because the routing between Howe and Yaletown Stn would be too tight for conventional buses, so they decided to keep the route on Pacific all the way. This is assuming that they will either now or eventually put some 40 footers on the route.

In any case I'm really happy with the changes.

Also, it looks like 5/6 operators will now be taking their layovers exclusively at Cambie and Dunsmuir, from looking at the paddles. This will make it into a much better loop line--no more waiting at Davie and Denman or transferring to the bus in front! The bus will just keep going with a change in headsign. The Canada Line and 17 can cover most of the thru passengers in the Yaletown area, since it won't make much sense to get on somewhere on Cambie and ride it to the CBD, or get on somewhere on Pender and ride it to a destination prior to Yaletown Stn. (Because one would have to wait at Cambie and Dunsmuir on the way) In the West End if the layover were to remain there are less alternatives, especially for getting to Robson or the CBD.
Layups at Cambie and Dunsmuir may be a problem, since the 17 Oak has to get by them.
     
     
  #15667  
Old Posted Nov 23, 2016, 2:01 AM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
My apologies if this was posted already, but didn't realize the WCE Trainbus will be now serviced by the 701. Says it will maintain same trainbus schedule, but not service Port Coquitlam or Port Haney. My question is, does anyone know if it provides return service to Coquitlam Station in the evening, or just deadheads back to the garage or to Maple Ridge, and continue regular service from there? Would provide an interesting option of riding the WCE for fun all the way out to Mission then come back via transit.
     
     
  #15668  
Old Posted Nov 23, 2016, 3:34 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,104
Quote:
Originally Posted by TransitFreak View Post
My apologies if this was posted already, but didn't realize the WCE Trainbus will be now serviced by the 701. Says it will maintain same trainbus schedule, but not service Port Coquitlam or Port Haney. My question is, does anyone know if it provides return service to Coquitlam Station in the evening, or just deadheads back to the garage or to Maple Ridge, and continue regular service from there? Would provide an interesting option of riding the WCE for fun all the way out to Mission then come back via transit.
The bus will run in service from Coquitlam to Mission and back to Coquitlam for all 4 trips.

Code:
Lv	Lv	Ar		Lv	Lv	Ar
CoqCtrl	HaneyPl	Mission		Mission	HaneyPl	CoqCtrl
 9:17a	 9:53a	10:17a		10:39a	11:05a	11:50a
 1:47p	 2:27p	 2:54p		 3:05p	 3:31p	 4:24p
 7:50p	 8:26p	 8:52p		 9:04p	 9:30p	10:04p
 8:50p	 9:26p	 9:52p		10:04p	10:30p	11:04p
     
     
  #15669  
Old Posted Nov 23, 2016, 6:08 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by nname View Post
The bus will run in service from Coquitlam to Mission and back to Coquitlam for all 4 trips.

Code:
Lv	Lv	Ar		Lv	Lv	Ar
CoqCtrl	HaneyPl	Mission		Mission	HaneyPl	CoqCtrl
 9:17a	 9:53a	10:17a		10:39a	11:05a	11:50a
 1:47p	 2:27p	 2:54p		 3:05p	 3:31p	 4:24p
 7:50p	 8:26p	 8:52p		 9:04p	 9:30p	10:04p
 8:50p	 9:26p	 9:52p		10:04p	10:30p	11:04p
Here's the 701 schedule if anyone's interested
http://infomaps.translink.ca/Public_Timetables/129/tt701.pdf

143
http://infomaps.translink.ca/Public_Timetables/129/tt143.pdf

188
http://infomaps.translink.ca/Public_Timetables/129/tt188.pdf

160
http://infomaps.translink.ca/Public_Timetables/129/tt160.pdf

95 B-line (temporary)
http://infomaps.translink.ca/Public_Timetables/129/tt095.pdf

180
http://infomaps.translink.ca/Public_Timetables/129/tt180.pdf

N9
http://infomaps.translink.ca/Public_Timetables/129/ttN9.pdf
     
     
  #15670  
Old Posted Nov 23, 2016, 8:08 AM
AverageJoe AverageJoe is offline
Registered User
 
Join Date: Dec 2009
Location: Vancouver
Posts: 141
Quote:
Originally Posted by nname View Post
Most likely shuttle though. TransLink had stopped using Cxx numbering schemes for new shuttle routes.
That's great news about the Cxx numbers. Finally, they're doing away with them.
     
     
  #15671  
Old Posted Nov 23, 2016, 8:17 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
They'll be having to update the rapid transit maps pretty damn often over the next few years if the vote gets approved tomorrow and B-Lines start being implemented much more frequently.
     
     
  #15672  
Old Posted Nov 23, 2016, 6:23 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Translink Periscope feed
https://www.periscope.tv/w/1mrxmAEOgRQxy

I started watching as they started talking about Skytrain/Rail, and something about upgrading Burrard station.

Edit 11:10am: West Vancouver Mayor wants to pull out of Translink because the tax increases would be over $800 per property unit. "We could provide a completely free bus system for that"

Last edited by Kisai; Nov 23, 2016 at 7:11 PM.
     
     
  #15673  
Old Posted Nov 23, 2016, 7:24 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Kisai View Post
Translink Periscope feed
https://www.periscope.tv/w/1mrxmAEOgRQxy

I started watching as they started talking about Skytrain/Rail, and something about upgrading Burrard station.

Edit 11:10am: West Vancouver Mayor wants to pull out of Translink because the tax increases would be over $800 per property unit. "We could provide a completely free bus system for that"
I'm following it along too, very interesting to hear all the comments from the mayors. I think it was also the West Van mayor, but I could be mistaken, that was talking about how this new revenue initiative is still just a bandaid, and until the province allows us to set our own, stable and permanent funding source, we're really just kicking the can further down the road.
     
     
  #15674  
Old Posted Nov 23, 2016, 7:31 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
The vote was just held and Phase 1 of the 10 year vision has been approved!

It was passed unanimously by those in attendance, though there were quite a few missing mayors.

I guess this was expected, but still a relief to finally have some plan going. Lots of bus service improvement to come in the next year, along with more frequent Canada Line and SeaBus and more funds for cycling and walking for the municipalities. Nothing too 🞵🞵🞵🞵, but at least we finally have a step forward.
     
     
  #15675  
Old Posted Nov 23, 2016, 7:57 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 956
So happy this has passed! (Though it was unlikely not to).

I can't wait to see the schedules for implementation of each aspect of Phase 1.
     
     
  #15676  
Old Posted Nov 23, 2016, 8:01 PM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
So that's 171 new buses in total - Can't wait to see what comes in April!

I wonder what and when the RFP for that will come out.
     
     
  #15677  
Old Posted Nov 23, 2016, 8:17 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by idunno View Post
So happy this has passed! (Though it was unlikely not to).

I can't wait to see the schedules for implementation of each aspect of Phase 1.
It likely passed because those who obstruct (like the mayor of Burnaby,) everything didn't attend.
     
     
  #15678  
Old Posted Nov 23, 2016, 10:47 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,025
Sooooo

This means that they will be ordering the new rolling stock for both the M/E lines and the Canada line?

Also, does this mean that all the Canada Line stations will be expanded to their full 50 meters?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #15679  
Old Posted Nov 23, 2016, 11:38 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is online now
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,728
Very happy to hear that this has been approved.

As a refresher, here's the sound-bytes of what it includes:

Quote:
PHASE 1

Plan approved: 2016
Roll-out: 2017-2026
  • 10% increase in bus service across the region
  • More frequent service on 50 different routes
  • 5 new B-Line routes on Fraser Highway, Lougheed Highway, Marine Drive, 41st Avenue, and Hastings Street
  • 171 new buses beginning in 2018
  • 20% increase in rail service
  • More frequent service on Expo/Millennium/Evergreen during mid-day, early evening, and weekends
  • Increased Canada Line service during high-demand times
  • 50 new SkyTrain cars
  • 5 new passenger cars for West Coast Express, to expand capacity
  • Pre-construction work on Broadway subway and Surrey light rail to keep projects on schedule
  • One new SeaBus to increase service and improve reliability
  • Service every 15 mins throughout the day, every day of the week
  • Service every 10 mins during rush hour (once the new SeaBus is delivered)
  • Expanded funding for operation, maintenance, and expansion of the Major Road Network (the first significant expansion of the MRN since 1999)
  • $50 million in expanded funding over 3 years for MRN upgrades that will improve safety and reduce traffic bottlenecks
  • $32.5 million over 3 years in new funding so municipalities can make MRN overpasses, retaining walls, and bridges safer and more earthquake-proof
  • $12.5 million in new funding for municipalities to improve pathways around transit, like sidewalks, crosswalks, and pedestrian traffic signals
  • $29.8 million in expanded funding to encourage/improve cycling, through projects like building new bike lanes and multi-use paths
  • $11.5 million in expanded funding to invest in regionally-owned cycling facilities at and near major transit stations and exchanges

Source & details: http://tenyearvision.translink.ca/phase-one/
Incredible that a 10 cent fare increase and $3 measly bucks per household in additional property tax, on average, yields a substantial enhancement for the region, particularly with the SkyTrain fleet expansion and additional levels of service at peak times, particularly for the Canada Line, which is frequently bursting at the seams.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis

Last edited by SFUVancouver; Nov 24, 2016 at 1:58 AM.
     
     
  #15680  
Old Posted Nov 23, 2016, 11:43 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 769
Quote:
Originally Posted by Metro-One View Post
Sooooo

This means that they will be ordering the new rolling stock for both the M/E lines and the Canada line?
Yes.

Quote:
Originally Posted by Metro-One View Post
Also, does this mean that all the Canada Line stations will be expanded to their full 50 meters?
No, there will be an additional 11 2-car Canada Line trains, which likely won't be here for a 3 or 4 years because they need to start a bidding process and find a supplier.

The additional 7 4-car Mark III trains for the Expo Line should be ready in 1.5 to 2 years because they're part of an option on the existing supply contract with Bombardier.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.