HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #1141  
Old Posted Nov 17, 2016, 10:54 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by artvandelay View Post
I still think choosing 12th Ave over 10th is stupid. It pushes the Olympic Way station further away from the East Village and Railtown for limited benefit. Most people in Connaught are still going to be better off walking to 7th Avenue.
I think treating Beltline like it's solely a trip-generator as opposed to a destination in it's own right is an over-sight. Particularly on the time-scale that this project will be operating on.
Reply With Quote
     
     
  #1142  
Old Posted Nov 17, 2016, 11:14 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by artvandelay View Post
I still think choosing 12th Ave over 10th is stupid. It pushes the Olympic Way station further away from the East Village and Railtown for limited benefit. Most people in Connaught are still going to be better off walking to 7th Avenue.
I think this is a massive point. Consider the expected developments north of the current stampede grounds, the national music centre, fort Calgary, and the full-on destination that East Village is expected to evolve to even above and beyond where it already is.

The Beltline, certainly 12th, is not a destination, and while that specific cooridor will develop, is not going to be like East Village or 17th Ave.
Reply With Quote
     
     
  #1143  
Old Posted Nov 18, 2016, 1:53 AM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by jeremy.r View Post
Some more detailed concept drawings for the two Beltine options (12th Ave surface or tunnel) are up on the City's website. The 12th Ave surface option would have 11th Ave become one way Eastbound and 10th Ave one way Westbound.

http://engage.calgary.ca/greenline/beltline
Surface Option
Tunnel Option
There is no mention of what happens to the cycle track on the surface option.
Reply With Quote
     
     
  #1144  
Old Posted Nov 18, 2016, 2:06 AM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by CalgaryAlex View Post


We need fewer one-ways, not a more complicated system of one-ways spread across 3 instead of 2 E-W routes.
Wasn't there a plan put forth to convert 11th and 12th avenues to two way? I think Evan Woolley brought it up a few years ago.
Reply With Quote
     
     
  #1145  
Old Posted Nov 18, 2016, 2:18 AM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by UofC.engineer View Post
There is no mention of what happens to the cycle track on the surface option.
Maybe a jog to 11th or 10th ave on the east end of the route?
Reply With Quote
     
     
  #1146  
Old Posted Nov 18, 2016, 2:20 AM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by UofC.engineer View Post
Wasn't there a plan put forth to convert 11th and 12th avenues to two way? I think Evan Woolley brought it up a few years ago.
It's been mused about many times, never much traction. Better to just make them better, nicer one ways in terms of streetscape.
Reply With Quote
     
     
  #1147  
Old Posted Nov 18, 2016, 3:10 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by UofC.engineer View Post
... What is the point of using a low floor technology if so many people here are advocating subway from 16th ave to Inglewood? ...
Sometimes more flexible technology is both good and bad. The technology choice is missing the point. Are there different goals in what some want this project to do/function as/be useful for? Should the low floor technology choice govern the amount of grade separation (i.e. speed, frequency, reliability, safety)?

Reply With Quote
     
     
  #1148  
Old Posted Nov 18, 2016, 3:12 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
It's ironic that in the council meeting Carra took heat from Keating about giving Tuxedo/Crescent Heights the option of grade separation to 28 Ave N, but the community fought to push the portal back south from 24 Ave to 16Ave and have it at grade when the Beltline is fighting for underground.
Reply With Quote
     
     
  #1149  
Old Posted Nov 18, 2016, 4:32 AM
McMurph McMurph is offline
Registered User
 
Join Date: Jan 2008
Posts: 468
However much I like tunnels, the underground option ends up with the easternmost VP station a block too far to the east.
Reply With Quote
     
     
  #1150  
Old Posted Nov 18, 2016, 4:40 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by McMurph View Post
However much I like tunnels, the underground option ends up with the easternmost VP station a block too far to the east.
The benefits of getting a station in the wrong place, while being a more expensive option. I'm with you McMurph.
Reply With Quote
     
     
  #1151  
Old Posted Nov 18, 2016, 6:30 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,426
Just for the record ... I HATE streetcars.
Stupid idea for Center St. (or anywhere else except a historic district).
Reply With Quote
     
     
  #1152  
Old Posted Nov 18, 2016, 5:24 PM
jeremy.r jeremy.r is offline
Registered User
 
Join Date: Aug 2015
Posts: 30
Quote:
Originally Posted by UofC.engineer View Post
There is no mention of what happens to the cycle track on the surface option.
The cycle track is shown on the north side of 11th Ave in the concept drawing.
Reply With Quote
     
     
  #1153  
Old Posted Nov 18, 2016, 5:41 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
I like how in the tunnel option the "4th Street Station" is actually between 5th and 6th Streets.
Reply With Quote
     
     
  #1154  
Old Posted Nov 18, 2016, 8:44 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by craner View Post
Just for the record ... I HATE streetcars.
Stupid idea for Center St. (or anywhere else except a historic district).
What do you define as a street car? Exclusive ROW vs mixed traffic operation? Grade separation of intersections vs at grade? Grade separation of ROW vs elevated or underground? Overhead catenary power vs third rail electrification?

I imagine what you mean is you hate light rail (catenary power vs third rail) vehicles operating in a mixed traffic right of way operation. If you definition is anything else, then you hate the CTrain. It is not grade separated, it crosses many intersections at grade and has catenary power.
Reply With Quote
     
     
  #1155  
Old Posted Nov 18, 2016, 10:50 PM
The Urbanist's Avatar
The Urbanist The Urbanist is offline
Registered User
 
Join Date: Jun 2013
Posts: 188
Quote:
Originally Posted by artvandelay View Post
I still think choosing 12th Ave over 10th is stupid. It pushes the Olympic Way station further away from the East Village and Railtown for limited benefit. Most people in Connaught are still going to be better off walking to 7th Avenue.
I strongly disagree. First off, the 4th Street SE station would be 1 block from Railtown and better service the new master plan that CMLC is creating for the Stampede lands (new arena location*** hint,hint). The Centre Street station on 12th is a much better option, as it will capture a significantly larger portion of the south Beltline that isn't currently serviced by the C-train. Between 2nd Street SW and 4 Street SE, the 10th Ave option overlaps the catchment area already serviced by the 7th Ave line. To not service the SE portion of the Beltline seems completely crazy, considering there are roughly 5,000 residential units in the pipeline. This is why Councillor Woolley and the Beltline Community Associate pushed for the 12th Ave underground option to be put back into the mix.

Last edited by The Urbanist; Nov 18, 2016 at 11:23 PM.
Reply With Quote
     
     
  #1156  
Old Posted Nov 18, 2016, 11:16 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Looking at those plans I've warmed to the idea of 12th Ave and don't even mind it being on the surface much - I doubt it'll have much of a negative effect on much and should save a chunk of cash. Along with that, if they move the Centre St station a block to the west, that would service a meaningful additional amount of the Beltline.

They have got to do something to fix those curves though. The sharp curves on the existing system at Lions Park and the approaches to 7th Ave are already intolerable, yet the ones proposed appear to be even tighter. Yuck.
Reply With Quote
     
     
  #1157  
Old Posted Nov 19, 2016, 12:46 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,426
Quote:
Originally Posted by fusili View Post
What do you define as a street car? Exclusive ROW vs mixed traffic operation? Grade separation of intersections vs at grade? Grade separation of ROW vs elevated or underground? Overhead catenary power vs third rail electrification?

I imagine what you mean is you hate light rail (catenary power vs third rail) vehicles operating in a mixed traffic right of way operation. If you definition is anything else, then you hate the CTrain. It is not grade separated, it crosses many intersections at grade and has catenary power.
Your assumption is correct. I don't mind the existing C-Train setup other than downtown (but that is another discussion alltogether).
I don't like the "mixed traffic" idea. It's supposed to be a rapid transit line is it not ?
Reply With Quote
     
     
  #1158  
Old Posted Nov 20, 2016, 12:34 AM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by craner View Post
Your assumption is correct. I don't mind the existing C-Train setup other than downtown (but that is another discussion alltogether).
I don't like the "mixed traffic" idea. It's supposed to be a rapid transit line is it not ?
I don't think anyone is advocating for the greenline to run in mixed traffic.
Reply With Quote
     
     
  #1159  
Old Posted Nov 20, 2016, 2:50 AM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by ClaytonA View Post
Agree this is a good design; it's a streetcar-like, not rapid transit. Are pedestrians going to be able to cross at every intersection given the halfway rapid transit design Calgary is implementing? No. Do one or the other. Rapid transit to move high volumes of people, similar to Calgary's existing LRT. Or a slow streetcar set up, with long trains, pedestrian crossings ever block, to fit into the neighbourhood versus cutting it in two.

If the community wants that kind of vision, streetcar-like, communicate the trade-off and make it successful by having the community accept more employment and residential density to support the pedestrian realm/other modes for a commercial district like Kensington or 17 Ave.

Instead from what's on the station plans Calgary's getting buildings zoned denser pretty much exclusively on Centre St and very limited crossings to mitigate ridership losses due to less mobility (the ability to travel a given distance in a given time) further north. How easy will it be too reduce the speed/frequency of the LRT, hopefully maintaining safety, to facilitate trips across Centre St in the future once people expect the shorter trip time?

Don't halfway it like 16 Ave N. Calgary ended up with not a limited access high volume road, nor a urban boulevard stimulating redevelopment and multi-modal use. Calgary got a road motorists complain about because it has too many lights, congestion, etc. and 6-8 lanes of traffic, vacant property, large setbacks with parking in front, and blank stone sound walls making the pedestrian realm terrible. Planters in the median and high-end streetlamps. Jack of all trades, master of none. Still salvageable though (parking lane, travel lane, transit lane, x2...) High hopes for North Crosstown BRT.
You nailed it. This will be another planning disaster rammed down our throats by a city administration that has shown time and again that they are incompetent.
Reply With Quote
     
     
  #1160  
Old Posted Nov 20, 2016, 3:03 AM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by UofC.engineer View Post
I think I see what you're getting at but Centre street is already terrible for the pedestrian. Many successful LRT's have been run on street.

Take this section of U-bahn in Stuttgart for example. The train runs at about 40-50 km/h

https://www.google.ca/maps/place/Stuttga...11c7791cfe4!8m2!3d48.7758459!4d9.1829321


traffic gridlock: Who that lives along centre street would want to drive to downtown on a daily basis when there is a rapid transit system at least 800m from their residence. If they really want to drive they can take Edmonton trail, 10th street or deerfoot depending on where they live.

Now it's time to ask you a question. How much do you think it costs to build one km of subway on centre street?
Your point about traffic gridlock has nothing to do with what I'm talking about.

As for how much 1km of subway would cost on Center Street that would depend on a lot of factors. I see what you're getting at but like the majority of people I'd rather the project be done properly so we gain the most benefit from it. Screwing over drivers using the excuse we could possibly save ~$400m while conveniently not factoring in costs for wasted time, lost business, etc. is not going to wash with the majority of Calgarians. Too many of us have been here a lot longer than those proposing these ruinous policies and have seen too many projects done on the cheap to the benefit of no one. If this project has to wait a bit longer that will be for the best. It was never intended to be built this soon anyway.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.