Quote:
Originally Posted by craneSpotter
What are volumes like through there?
BC #1 from the Alberta border to west of Revelstoke has pretty low traffic volumes. Only 3 to 4,000 vehicles daily during Jan/Feb to approx. 12 to 15,000 daily during the peak summer months. The absolute peak would be ~18k a day before and after the August long weekend. The current highway has a capacity for ~20-24,000 vehicles a day (based on other studies done on two/three-lane highways by the MoTI in BC), but could use some more passing lanes.
The only way to get it twinned within the next 30 years would be to TOLL it, which I would totally support! Maybe $30 each way for cars and $40 for RVs. User pay is a win/win! They could just set up TOLL booths before Golden.
|
Well, for starters, all truck traffic west goes through there.
https://www.ontario.ca/data/traffic-volume
Downloading the file to Excel;
Highway 11 averages 5000+ in some places. It can get as low as about 1500 around Geraldton.
Highway 17 averages around 3500+ Almost 10,000 around Sudbury.
Once twinning of highway 69 to Sudbury is complete, it will be renumbered to Highway 400.
Highway 17 near Ottawa is being twinned going west. There are other parts of 17 that are twinned near Sudbury, Sault St Marie, and Thunder Bay. North Bay has plans to turn it's current bypass into a full freeway in the future.
In general, Highway 17 or 11 will never be tolled. Having said that, I doubt it will be twinned within 30 years. 50 years is more likely.
I wonder, of the main east west highways, where will the last 2 lane gap be. Although Ontario has more now, It is slightly cheaper than BC to build per km.