Quote:
Originally Posted by kmcamp View Post
Both the DLR and the Skytrain predate the low-floor movement, so it's hard to compare. The Canada Line doesn't count, as it's a heavy-rail train with two cars.

The one issue I see with those systems is vendor lock. If you choose Bombardier (Skytrain), VAL, or Anselo Breda, you're stuck with them forever, whereas in our case there's nothing technically preventing us to switching to Bombardier or CAF or even Siemens 30 years from now when the trains need replacing.
If you have a large enough order, vendor lock is not an issue. Those are pretty rare though. I believe two companies in addition to Siemens bid on Calgary's high floor contract, all three of them were entirely new designs.

In Ontario there seems to be a virtual vendor lock due to political preferences. Well that and Bombardier under bidding. Hard to mount a competitive bid when winning a contract forces you to build a factory.

How did Ottawa get around that anyways? Was it since it was one big contract they could reduce the Canadian content a bit on particular parts and up it on others?
     
     
  #3862  
Old Posted Oct 11, 2016, 11:29 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
I have no idea how Ottawa managed to escape the pro-Bombardier protectionist nonsense, but I'm very thankful we did.

With Bombardier's very poor performance in its contracts in the GTA, though, it looks as if the province is finally abandoning them. Leaked papers from Metrolinx suggest Bombardier is being barred from bidding on the EMUs needed for the GO RER project and the TTC is actively considering banning Bombardier from bidding on future City of Toronto tenders.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3863  
Old Posted Oct 12, 2016, 12:07 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Extra work adds $57.4M to LRT project

Jon Willing, Ottawa Citizen
Published on: October 11, 2016 | Last Updated: October 11, 2016 6:20 PM EDT




The first phase of LRT has cost $57.4 million more since council approved the massive infrastructure project in 2012.

Council endorsed much of the additional spending, beyond the $2.1-billion construction budget, as part of the final sign-off for the Confederation Line LRT. The extras identified in 2012 included the $226-million Highway 417 widening ($206 million came from the province) and a $63-million LRT “transition” fund, plus a general $100-million contingency fund.

However, the transition fund has since ballooned to $88.7 million and there has been $31.7 million worth of “other” projects added to the list.

The Citizen, through access to information, asked for a list of all additional works beyond the council-approved LRT construction budget. The city provided a summary of projects as of July 31, 2016.

The largest part of the “other” spending is $25 million for a fare control system.

Steve Cripps, director of the rail office, said the city didn’t know in 2012 what kind of technology would be used to accept fares on the LRT line, which is why the amount was left outside of the construction budget. The city has now selected the kind of fare gates it will install at stations.

There are five other expenses grouped in the “other” category.

There’s $2.5 million for fixes to the Rideau River bridge between Lees and Hurdman stations. A transit control centre needs a $1.7-million renovation for LRT, and integrating the radio system costs another $1 million. The design for a bus loop at Tunney’s Pasture is $1.3 million and “linkages” at stations cost $200,000.

Council approved the $63-million transition fund in 2012 knowing OC Transpo would need significant resources for bus detours until the launch of LRT in 2018. The additional $25.7 million injected into the transition fund is helping to pay for bus replacements, bus facilities and equipment, regulatory requirements and testing, and “operational readiness.”

Deputy city treasurer Isabelle Jasmin said all of the $57.4 million in additional work has been approved by council in budgets since 2012.

When contingency commitments are included, the city has recorded about $230 million in costs for the Confederation Line LRT beyond the $2.1-billion construction budget.

The fixed-price LRT construction contract with the Rideau Transit Group is $2.13 billion. The construction budget plus all the incremental work put the total cost at $2.359.9 billion as of July 31, 2016.

Some of the extra expenses will be covered by the federal government through its recently announced transit infrastructure fund. For example, the federal money included half of the $30-million cost for bus detours during LRT construction.

There are a couple of items that have been added to the LRT-related projects list since the end of July.

The city will add bike tracks to the Booth Street bridge for $2 million, half of which will be covered by the federal transit funding.

Cripps said the city is also working with the LRT contractor on better path connections at Bayview station. Staff are looking at an option estimated at $3.5 million paid from the contingency fund, but Cripps said he expects the actual cost will be lower.

The city has about $88 million earmarked for projects using the $100-million contingency fund with less than two years left in the construction schedule. The value of the projects is a bit higher, but the federal money is offsetting some of the costs.

Cripps said the project contingency fund is healthy.

“We’re comfortable with where we are,” Cripps said.

[email protected]
twitter.com/JonathanWilling


Top LRT extra costs beyond $2.1-billion budget:

$63 million: bus detours
$32.8 million: property acquisitions *
$25 million: fare control system
$22.6 million: contract variations *
$19.1 million: station entrances *
* allocated to $100-million contingency fund

http://ottawacitizen.com/news/local-news/extra-work-adds-57-4m-to-lrt-project
     
     
  #3864  
Old Posted Oct 12, 2016, 12:01 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by 1overcosc View Post
I have no idea how Ottawa managed to escape the pro-Bombardier protectionist nonsense, but I'm very thankful we did.
Good Day...
partly due to the way the bidding was designed.... the three consortia did not necessarily have to specify a vehicle supplier in their bids, only to arrange for a vehicle within their bid profile. And also Bombardier was already loosely associated with one of the other consortiums.
And, oh my yes, I too am so very glad. B has really fouled their reputation in Canada.
EnJoy !
     
     
  #3865  
Old Posted Oct 12, 2016, 1:42 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
I understand bus detours can cost more than anticipated and I understand fare control is a system wide thing and if it wasn't chosen before 2012 it made sense to install it separately. But "station entrances" seems like a core part of the system. Why wasn't that in the original tender?
     
     
  #3866  
Old Posted Oct 12, 2016, 2:40 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
Quote:
Originally Posted by acottawa View Post
I understand bus detours can cost more than anticipated and I understand fare control is a system wide thing and if it wasn't chosen before 2012 it made sense to install it separately. But "station entrances" seems like a core part of the system. Why wasn't that in the original tender?
Perhaps it has to do with changes to the station entrances downtown that were negotiated with neighbouring landowners after the fact?
     
     
  #3867  
Old Posted Oct 12, 2016, 2:56 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
"$25 million for a fare control system"
-- Public transit should be free, as are roads and sidewalks.
     
     
  #3868  
Old Posted Oct 12, 2016, 4:59 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day....
on the fare gates, and other issues : The Toronto Star today :
https://www.thestar.com/news/gta/2016/10...on-ttc-running-millions-over-budget.html
They also did not include the station fare gate system in the costing, accepting a separate contract and cost for this segment of the requirement and system.
We included only the 'accommodation' of a fare gate system in the stations as part of the bid requirements, pending Presto definitions and technology advancements.... for all that that is worth !!
Seems like TO is experiencing at least as many problems with Presto as we are, and as many overruns and excesses.
Thanks.
     
     
  #3869  
Old Posted Oct 12, 2016, 8:27 PM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Please excuse my ignorance, but is our current OTrain heavy or light rail? Is it considered high floor?
     
     
  #3870  
Old Posted Oct 12, 2016, 8:34 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,633
Euro-Mainline?
     
     
  #3871  
Old Posted Oct 12, 2016, 9:38 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by Buggys View Post
Please excuse my ignorance, but is our current OTrain heavy or light rail? Is it considered high floor?
Isn't it something in between heavy and light rail?

but definitely high floor.
     
     
  #3872  
Old Posted Oct 12, 2016, 10:42 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Legally a mainline train, but using DMU trains instead of traditional locomotives. I believe it's technically heavy rail.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3873  
Old Posted Oct 12, 2016, 11:27 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by 1overcosc View Post
Legally a mainline train, but using DMU trains instead of traditional locomotives. I believe it's technically heavy rail.
In North America, we call it "Diesel Light Rail", but by European standards, it's a low floor mainline train, which oddly enough is about the same height as a high floor LRV, but way lower then a typical heavy rail train.

"Low floor" depends on the type of vehicle, from wikipedia

Ultra Low Floor tram – 180 mm (7 in)
Low floor tram – 300 to 350 mm (12 to 14 in)
High floor tram – more than 600 mm (24 in)
Low floor train – 550 mm (22 in)
Train (in UK or narrow gauge) – 800 to 1,200 mm (31.5 to 47.2 in)
Standard North American passenger cars – 1,300 mm (51 in)
Train (standard gauge (except UK) or broad gauge) – 1,300 to 1,370 mm (51 to 54 in)

Last edited by kmcamp; Oct 12, 2016 at 11:45 PM.
     
     
  #3874  
Old Posted Oct 13, 2016, 12:04 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Wow thanks guys! ...So basically the main difference between the new Confederation line trains and the current OTrain Tain's is that the new ones are light rail & current ones heavy rail?

Why couldn't we have picked new trains that are also heavy rail, to perhaps increase train maintenance efficiency? Plus, would diesel trains be better at breezing through heavy snowfall than electric?
     
     
  #3875  
Old Posted Oct 13, 2016, 12:42 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Any train is fine against heavy snowfall.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
     
     
  #3876  
Old Posted Oct 13, 2016, 1:19 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Buggys View Post
Why couldn't we have picked new trains that are also heavy rail, to perhaps increase train maintenance efficiency? Plus, would diesel trains be better at breezing through heavy snowfall than electric?
Heavy rail would have been a needless expense for the Confederation Line both in purchase and operating costs (heavier trains need more energy to accelerate). Since the Trillium line crosses conventional train tracks, it needs to be designed to withstand a crash with a train. The Confederation line doesn't cross any tracks so doesn't need to be designed to withstand that type of crash. They also wanted to keep the option of running the trains on streets, something heavy rail would not be permitted to do.

A more likely option is once the Trillium line is grade separated from conventional rail lines, they could start using LRVs on it.
     
     
  #3877  
Old Posted Oct 13, 2016, 9:40 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Neat. Thanks!
     
     
  #3878  
Old Posted Oct 13, 2016, 11:18 AM
Dundas's Avatar
Dundas Dundas is offline
Registered User
 
Join Date: Mar 2009
Location: God's country of Orleans
Posts: 266
Quote:
Originally Posted by JM1 View Post
Does anyone know who pays for power and heating for the LRT over the duration of the contract... city or RTG?
RTG pays for it with tax money given to them by the city to run the "maintenance". This is what contracting out is. If RTG goes over the money givin by the city thats a shortfall for them but if there's left over money that's a profit.
     
     
  #3879  
Old Posted Oct 13, 2016, 1:26 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,918
Quote:
Originally Posted by Buggys View Post
Wow thanks guys! ...So basically the main difference between the new Confederation line trains and the current OTrain Tain's is that the new ones are light rail & current ones heavy rail?
They're pretty unrelated pieces of technology. The Confederation Line is an adaptation of a European tram. The Trillium line is an adaptation of a European intercity/commuter train (if you take a train in rural Germany the rolling stock will be very familiar). Both are considered "light rail" - the Germany acronym for the Trillium train stands for "(light innovative local transport rail vehicle")
     
     
  #3880  
Old Posted Oct 13, 2016, 4:54 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Big red Os will mark the stops on Ottawa's LRT system

Jon Willing, Ottawa Citizen
Published on: October 13, 2016 | Last Updated: October 13, 2016 12:13 PM EDT




Big, red illuminated Os will mark the stops on Ottawa’s LRT system, helping the City of Ottawa establish a new brand for public transportation in Canada’s capital.

The design of the O comes from the existing logos for the O-Train and OC Transpo. It will be featured prominently at LRT stations, starting with the 13 stops on the first phase of the Confederation Line.

The transit commission will receive a report Wednesday confirming the branding for the Confederation Line and the Trillium Line. The report, which was published this week, illustrates what transit riders will see when they approach and enter rail stations.

“The red O symbol is used as a unifying graphic element that not only identifies stations and their entrances, but defines the stations as an integral part of the larger OC Transpo network,” according to the report.

Other “signature” design elements of the transit system will be the labelling of the two train lines – Confederation Line LRT will be the 1, marked on maps in red; Trillium Line will be the 2, marked in green – and black and white directional signs on the train platforms.

The design overhaul is part of a new labelling and wayfinding approach for the entire transit network.

The report only considers the design elements for the first phase of LRT. In the second phase under development, Transpo will need to consider how it will distinguish the lines in the west part of the city. Trains will go to either Algonquin College or Bayshore Shopping Centre.

Transpo has been researching the design features for two years with the goal of making them “clear, durable, and usable by everyone.” Along with consultants, staff looked at other transit agencies and what mistakes they made. One of the big challenges is creating design elements that are modern and able to maintain a contemporary feel for years.

Transpo is also giving thought to what kind of businesses could rent space in some of the LRT stations. In the first phase of LRT, Transpo is making retail space available at Tunney’s Pasture, Rideau, Hurdman and Blair stations.

If the transit commission agrees with the strategy, Transpo will hire a property management expert to guide the development of the commercial spaces. No extra city money would support the retail spaces, which could generate a small amount of rental revenue for Transpo.

According to Transpo’s research across 11 other transit agencies, the typical retail services are convenience stores, coffee shops, flower shops and vending machines. Seasonal stores and pop-up shops could also be options.

[email protected]
twitter.com/JonathanWilling

http://ottawacitizen.com/news/local-news/big-red-os-will-mark-the-stops-on-ottawas-lrt-system
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.