HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #15461  
Old Posted Oct 11, 2016, 10:43 PM
Tfreder Tfreder is offline
Registered User
 
Join Date: Jun 2012
Posts: 225
Quote:
Originally Posted by GlassCity View Post
TransLink has released a collection of documents relating to their 10-year plan today.

Discussion Guide:
http://tenyearvision.translink.ca/downloads/Phase%20One%2010-Year%20Vision%20Discussion%20Guide.pdf

Maps:
http://tenyearvision.translink.ca/downlo...One%20Regional%20Improvements%20Maps.pdf

Draft Technical Communication:
http://tenyearvision.translink.ca/downlo...%20Draft%20Technical%20Documentation.pdf

Transit Fares Backgrounder:
http://tenyearvision.translink.ca/downlo...Year%20Vision%20Fares%20Backgrounder.pdf

Property Tax Backgrounder:
http://tenyearvision.translink.ca/downlo...sion%20Property%20Tax%20Backgrounder.pdf

Development Fee Backgrounder:
http://tenyearvision.translink.ca/downlo...n%20Development%20Fee%20Backgrounder.pdf

Public Consultation Display Boards:
http://tenyearvision.translink.ca/downlo...ic%20Consultation%20Display%20Boards.pdf

Full 10 Year Vision:
http://tenyearvision.translink.ca/downlo...ver%20Transit%20and%20Transportation.pdf

All found on their public engagement page here: http://tenyearvision.translink.ca/have-your-say/
Link also includes a schedule of their open houses regarding this project.

Also, a weird question. They talk about upgrading the 135 to a B-Line. But the 135 is already limited-stop and on the Frequent Transit Network. What other qualifications does a route need to be considered a B-Line?
Thanks for sharing! I believe the current 135 can't be called a b-line because it does local stops east of Boundary.
     
     
  #15462  
Old Posted Oct 11, 2016, 11:15 PM
Skygazer's Avatar
Skygazer Skygazer is offline
Registered User
 
Join Date: Apr 2016
Location: Saskatoon
Posts: 295
I'm surprised they're looking at a Metrotown/Brighouse B-Line, I take the 430 from Metrotown to Richmond every once in a while and it doesn't seem that crowded to me.

On the other hand the 130 is ridiculously busy and there should've been an express bus on that route years ago. It's a bit strange that they're not seriously considering that at this point. A Metrotown/Kingsway/Deer Lake Parkway/BCIT/Brentwood express bus would be amazing and do wonders for the crowding on that line.

Also, perhaps an uncommon opinion, but I think we could really use an express bus of some sort going down Kingsway. The 19 has so many people getting on and off that it has to pull in and out of traffic at nearly every block and ends up taking forever to get anywhere. I know the SkyTrain sort of runs parallel to Kingsway but it's still a fair distance away a lot of the time.
     
     
  #15463  
Old Posted Oct 11, 2016, 11:35 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by Skygazer View Post
I'm surprised they're looking at a Metrotown/Brighouse B-Line, I take the 430 from Metrotown to Richmond every once in a while and it doesn't seem that crowded to me.

On the other hand the 130 is ridiculously busy and there should've been an express bus on that route years ago. It's a bit strange that they're not seriously considering that at this point. A Metrotown/Kingsway/Deer Lake Parkway/BCIT/Brentwood express bus would be amazing and do wonders for the crowding on that line.

Also, perhaps an uncommon opinion, but I think we could really use an express bus of some sort going down Kingsway. The 19 has so many people getting on and off that it has to pull in and out of traffic at nearly every block and ends up taking forever to get anywhere. I know the SkyTrain sort of runs parallel to Kingsway but it's still a fair distance away a lot of the time.
Well hopefully you filled out the survey and included those comments then. I added in a few things on pertinent questions. Sometimes I wonder if they curse me for pretty much always adding comments in the text boxes.
     
     
  #15464  
Old Posted Oct 12, 2016, 12:06 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 652
Quote:
Originally Posted by Skygazer View Post
I'm surprised they're looking at a Metrotown/Brighouse B-Line, I take the 430 from Metrotown to Richmond every once in a while and it doesn't seem that crowded to me.
The 430 can get really packed during rush hours. However, I don't understand why they want to consider converting it to a B Line. It's already an limited stop express. Just increase the frequency off peak and extend service hours into late evening and you'll have similar B Line level service.
     
     
  #15465  
Old Posted Oct 12, 2016, 1:07 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Another thing that I feel was left out: There are a ton of buses streaming from the North Shore towards Downtown and back via the Lions Gate Bridge... but we know how busy the crossing already is. I'm surprised they haven't thought of isolating the local networks from the bridge congestion by keeping them at Park Royal and then running a B-Line from there. The same can also be said of the routes crossing the Second Narrows Bridge as well...
     
     
  #15466  
Old Posted Oct 12, 2016, 4:46 AM
Mac Write Mac Write is online now
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I was thinking, (transit related give me a sec). What if the government approved oil rigs off of the BC coast? Elimination of the P.S.T.

Now here's the question, how would transit expansion increase if this came a reality? Think about it. The Mayors council's dream plan for transit would come true, Skytrain to Surrey, UBC, North Shore, Hastings, and other lines, and so on, also road projects etc, all completed by 2030.

Would our "Dream transit system" happen if the BC government allowed oil drilling off of the BC Coast?
     
     
  #15467  
Old Posted Oct 12, 2016, 5:24 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,187
Quote:
Originally Posted by Mac Write View Post
I was thinking, (transit related give me a sec). What if the government approved oil rigs off of the BC coast? Elimination of the P.S.T.

Now here's the question, how would transit expansion increase if this came a reality? Think about it. The Mayors council's dream plan for transit would come true, Skytrain to Surrey, UBC, North Shore, Hastings, and other lines, and so on, also road projects etc, all completed by 2030.

Would our "Dream transit system" happen if the BC government allowed oil drilling off of the BC Coast?
That's assuming that that rigs would generate billions, and that it would directly translate into tax revenue, and that it would all be spent on infrastructure upgrades. Chances are that all we'd end up with is the setting for Deepwater Horizon 2: Oil's Well That Ends Well.
     
     
  #15468  
Old Posted Oct 12, 2016, 5:25 AM
Xrayal's Avatar
Xrayal Xrayal is offline
Registered User
 
Join Date: Jul 2008
Location: New Westminster
Posts: 174
Quote:
Originally Posted by GlassCity View Post
TransLink has released a collection of documents relating to their 10-year plan today.
Interesting pulls from my quick scans. In the Phase One Plan: Draft Technical Documentation -pg 21. Major Capital Projects listed.
-Replacement of Skytrain MKI Vehicles - Start date-2021 - Cost 233mill. (so much for the 15 years of extended life)
My math based upon our current cost of mk3 is that would get us 80 mk3. Would 80 mk3 cars be suffice replacements for 150 mk1 cars?
-Skytrian OMC Replacement/Relocation? -Start date -2017 -Cost 50mill.
Any guess on what this really means?
     
     
  #15469  
Old Posted Oct 12, 2016, 6:23 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by Xrayal View Post
Interesting pulls from my quick scans. In the Phase One Plan: Draft Technical Documentation -pg 21. Major Capital Projects listed.
-Replacement of Skytrain MKI Vehicles - Start date-2021 - Cost 233mill. (so much for the 15 years of extended life)
Have they actually refurbished all the original Mark 1 cars (114 cars)?
The later 1990 cars (16 + 20) were not part of the refurb plan.
     
     
  #15470  
Old Posted Oct 12, 2016, 6:26 AM
Mac Write Mac Write is online now
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I wish they would keep 1 set of 8-car (spare) in Expo colour and Translink 1.0 colours.

How many cars would be replaced for 233m? and how many new cars to old cars?
     
     
  #15471  
Old Posted Oct 12, 2016, 6:28 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 771
Quote:
Originally Posted by Xrayal View Post
Interesting pulls from my quick scans. In the Phase One Plan: Draft Technical Documentation -pg 21. Major Capital Projects listed.
-Replacement of Skytrain MKI Vehicles - Start date-2021 - Cost 233mill. (so much for the 15 years of extended life)
My math based upon our current cost of mk3 is that would get us 80 mk3. Would 80 mk3 cars be suffice replacements for 150 mk1 cars?
Starting in 2021 probably means starting with the 36 Mark I cars that have not been refurbished. The VP of Maintenance at BCRTC had previously said that Mark Is would likely start being phased out around 2026 (if funding was available to replace them).

Quote:
Originally Posted by Xrayal View Post
-Skytrian OMC Replacement/Relocation? -Start date -2017 -Cost 50mill.
Any guess on what this really means?
There is a plan to do a "[c]omplete repair/replacement plan to restore the yard track to a state of good repair (project is planned for 2018)."

The main concern with the Edmonds Yard is lack of space. It's been expanded twice, and they've run out of room. That's one of the main reasons the Evergreen extension includes a Vehicle Storage Facility and small maintenance shop. This would be a very limiting factor for the Broadway extension.
     
     
  #15472  
Old Posted Oct 12, 2016, 6:41 AM
Mac Write Mac Write is online now
Registered User
 
Join Date: Dec 2008
Posts: 1,423
So what does the OMC move mean? use OMC 2 with more mataiance buildings, take down older buildings for more storage tracks?

Why did they have to put the road in in the first place which split up the OMC, if that road hadn't been put in, the OMC could easily double or triple track storage.


How nice would it be to have 34 Mark III trains (based on 80 car order). 14 trains by next year!!!

So we will have
Mark II - 15 4-car trains
Mark II.5 - 12 4-car trains
Mark III - 14 4-car trains

Would be nice if they continued to order more trains so we keep getting new ones (may 20/yr) starting in 2018 would give us 80 cars in 2021.

One can dream.
     
     
  #15473  
Old Posted Oct 12, 2016, 11:02 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Mac Write View Post
So what does the OMC move mean? use OMC 2 with more maintenance buildings, take down older buildings for more storage tracks?
My guess is that OMC1 was not designed for a connected 5-car MKIII train, which is why we got 4-car models. I have to wonder why they don't build "parking garage" style train storage, that's something that the LIM trains could certainly do.

Or maybe OMC2 has multiple phases planned. Or maybe if/when the Broadway line is built there will be another OMC at the UBC end. Who knows.
     
     
  #15474  
Old Posted Oct 12, 2016, 6:44 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by ilikeredheads View Post
The 430 can get really packed during rush hours. However, I don't understand why they want to consider converting it to a B Line. It's already an limited stop express. Just increase the frequency off peak and extend service hours into late evening and you'll have similar B Line level service.
The primary motive behind converting the 430 to a B-Line is to connect Metro Vancouver's regional centres with some form of "rapid" transit. This is the same reason a B-Line is planned between Langley Centre and Maple Ridge. It's much more about creating quick links between all these centres and less about upgrading busy routes. Not that I'm against this approach.
     
     
  #15475  
Old Posted Oct 12, 2016, 8:09 PM
Aroundtheworld Aroundtheworld is offline
Registered User
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by Kisai View Post
My guess is that OMC1 was not designed for a connected 5-car MKIII train, which is why we got 4-car models. I have to wonder why they don't build "parking garage" style train storage, that's something that the LIM trains could certainly do.

Or maybe OMC2 has multiple phases planned. Or maybe if/when the Broadway line is built there will be another OMC at the UBC end. Who knows.
I can't see an OMC near UBC, but I could see one between Surrey and Langley if they extend the Expo Line out there.
     
     
  #15476  
Old Posted Oct 12, 2016, 8:33 PM
trofirhen trofirhen is online now
Registered User
 
Join Date: Oct 2008
Posts: 9,057
Quote:
Originally Posted by GlassCity View Post
The primary motive behind converting the 430 to a B-Line is to connect Metro Vancouver's regional centres with some form of "rapid" transit. This is the same reason a B-Line is planned between Langley Centre and Maple Ridge. It's much more about creating quick links between all these centres and less about upgrading busy routes. Not that I'm against this approach.
What about B-line frequencies please, if you know. Thanx
     
     
  #15477  
Old Posted Oct 12, 2016, 10:22 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,126
Quote:
Originally Posted by GlassCity View Post
The primary motive behind converting the 430 to a B-Line is to connect Metro Vancouver's regional centres with some form of "rapid" transit. This is the same reason a B-Line is planned between Langley Centre and Maple Ridge. It's much more about creating quick links between all these centres and less about upgrading busy routes. Not that I'm against this approach.
It's also about branding. There are people who won't take a 'slow' bus, but will take a 'fast' B-Line.

I think the 169 was faster than the 97 B-Line, but lots of people took the B-Line. The 99 B-Line from commercial was about the same speed as the 84 from VCC, but the 99 B-Line got way, way more traffic.

Also, once a route is B-Lined, it gets a place on transit maps. It becomes a predictable mainline route, especially for visitors and infrequent transit users.

It also makes people less angry when it doesn't stop for them. The B-Line is a brand. It's supposed to be a faster, more premium service.
     
     
  #15478  
Old Posted Oct 12, 2016, 10:41 PM
Mac Write Mac Write is online now
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Why not add a B-Line along side the 84. It would help move people off crowded broadway and offer an even faster route along 4th avenue.
     
     
  #15479  
Old Posted Oct 12, 2016, 10:47 PM
Geof Geof is offline
Registered User
 
Join Date: Oct 2009
Posts: 136
Quote:
Originally Posted by twoNeurons View Post
I think the 169 was faster than the 97 B-Line, but lots of people took the B-Line.
Was it ever (at least it was a decade ago when I took it). I found the 97 shockingly slow - though my impression was that most people figured it out and took the 169.
     
     
  #15480  
Old Posted Oct 12, 2016, 10:57 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by twoNeurons View Post
It's also about branding. There are people who won't take a 'slow' bus, but will take a 'fast' B-Line.

I think the 169 was faster than the 97 B-Line, but lots of people took the B-Line. The 99 B-Line from commercial was about the same speed as the 84 from VCC, but the 99 B-Line got way, way more traffic.

Also, once a route is B-Lined, it gets a place on transit maps. It becomes a predictable mainline route, especially for visitors and infrequent transit users.

It also makes people less angry when it doesn't stop for them. The B-Line is a brand. It's supposed to be a faster, more premium service.
The transit map point is the one in my head when I was writing my response. A 430 B-Line would have a thick orange line connecting Richmond City Centre and Metrotown on a map, and that's why it would exist. I mean, that's not a bad reason, but to me it's very clear that this was a Mayor's priority and not so much a TransLink one.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:02 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.