Only 1 crane for hotel, parkade will only have mobile, but 1 for sure with hotel, it will have a long jib anyway stretching right across college
     
     
  #9502  
Old Posted Oct 8, 2016, 8:07 PM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
Some columns for first floor college quarter hotel should be standing by end of next week
     
     
  #9503  
Old Posted Oct 9, 2016, 1:33 AM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,542
Will there be no parkade associated with the hotel?
     
     
  #9504  
Old Posted Oct 9, 2016, 5:48 PM
Brutopian Brutopian is offline
Registered User
 
Join Date: Jan 2011
Posts: 1,279
Bolting underway on new Traffic Bridge, demolition of remaining span planned for November

Saskatoon StarPhoenix
October 8, 2016

As bolting operations get underway on the steel trusses of Saskatoon’s new traffic bridge, demolition of the last remaining span of the old bridge is planned for next month.

The last remaining span will be torn down using equipment instead of explosives, Saskatoon’s director of major projects said.

[........]

Read more:
http://thestarphoenix.com/news/local-new...n-of-remaining-span-planned-for-november
     
     
  #9505  
Old Posted Oct 9, 2016, 6:06 PM
SaskE30 SaskE30 is offline
Registered User
 
Join Date: Oct 2014
Posts: 182
Quote:
Originally Posted by Echoes View Post
Will there be no parkade associated with the hotel?
In the version of the plans I saw, there is not a underground parkade under the hotel (which seems to be confirmed given the work already completed on the site). However, there will be a stand alone multi-level parkade built between the new hotel and the existing stadium parkade.

I know the developer worked very hard on this project to bring it in at a viable budget. My speculation is that the lack of a large excavation required to accommodate an underground parkade saved a significant amount of money in the project budget.
     
     
  #9506  
Old Posted Oct 9, 2016, 6:42 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,542
^ Thanks.
     
     
  #9507  
Old Posted Oct 9, 2016, 6:44 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,542
First span of the new Traffic Bridge taking shape:



https://twitter.com/thinktankSK/status/784808245109981184

...so visionary. Thanks, City Council.
     
     
  #9508  
Old Posted Oct 10, 2016, 7:33 PM
WoodlandCritter WoodlandCritter is offline
Registered User
 
Join Date: Apr 2010
Posts: 345
Quote:
Originally Posted by Echoes View Post
First span of the new Traffic Bridge taking shape:



https://twitter.com/thinktankSK/status/784808245109981184

...so visionary. Thanks, City Council.
Ugh
     
     
  #9509  
Old Posted Oct 11, 2016, 6:07 AM
casper's Avatar
casper casper is online now
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 13,034
Quote:
Originally Posted by WoodlandCritter View Post
Ugh
It will be a pretty bridge. Far more character than any other span build in the city in the last 20 years. It will look like a bridge as opposed to an overpass.
     
     
  #9510  
Old Posted Oct 11, 2016, 1:17 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 892
I agree Casper, I would have liked to see something a little more modern looking but this is far better than another slab of concrete crossing the river.
     
     
  #9511  
Old Posted Oct 11, 2016, 4:03 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,577
Maybe we can dress it up with LED lights....(sarcasm)
     
     
  #9512  
Old Posted Oct 11, 2016, 6:48 PM
WoodlandCritter WoodlandCritter is offline
Registered User
 
Join Date: Apr 2010
Posts: 345
I still think a big opportunity was missed.
     
     
  #9513  
Old Posted Oct 11, 2016, 7:22 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,085
Why they felt a need to recreate something that was utterly utilitarian and frankly ugly is beyond me. I believe it was an excuse to cheap out.
     
     
  #9514  
Old Posted Oct 11, 2016, 7:30 PM
macca's Avatar
macca macca is offline
the heat goes on
 
Join Date: Jul 2006
Location: Saskatoon, SK
Posts: 712
Quote:
Originally Posted by Stormer View Post
Why they felt a need to recreate something that was utterly utilitarian and frankly ugly is beyond me. I believe it was an excuse to cheap out.
This was certainly not a cheaper option. Quite the opposite.
     
     
  #9515  
Old Posted Oct 11, 2016, 9:03 PM
Temperance Temperance is offline
Registered User
 
Join Date: Mar 2009
Location: Winnipeg
Posts: 472
Quote:
Originally Posted by The Bess View Post
I agree Casper, I would have liked to see something a little more modern looking but this is far better than another slab of concrete crossing the river.
Agreed. The other bridges are the real missed opportunities.
     
     
  #9516  
Old Posted Oct 11, 2016, 9:20 PM
EpicPonyTime's Avatar
EpicPonyTime EpicPonyTime is offline
Registered User
 
Join Date: Mar 2013
Location: Yellowfork
Posts: 1,168
I would have liked to see something truly unique, but the new Traffic Bridge was always going to be either a replica or a plain concrete bridge. Considering the circumstances we are lucky to have gotten something that at least looks different.
     
     
  #9517  
Old Posted Oct 11, 2016, 10:00 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Nanaimo, British Columbia
Posts: 677
Crane for college quarter hotel is being assembled.
     
     
  #9518  
Old Posted Oct 11, 2016, 10:44 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,085
Quote:
Originally Posted by macca View Post
This was certainly not a cheaper option. Quite the opposite.
It is a comparatively inexpensive bridge. I suppose that is partially because the existing piers are being re-used.
     
     
  #9519  
Old Posted Oct 11, 2016, 11:39 PM
saskatoonborn saskatoonborn is offline
Registered User
 
Join Date: Aug 2013
Posts: 297
Quote:
Originally Posted by Stormer View Post
It is a comparatively inexpensive bridge. I suppose that is partially because the existing piers are being re-used.
Apparently thats no longer the case. I guess it was a lot more time and effort to fix the piers than to tear them down and build from scratch. They cancelled the pyro demo last month so they can just rip the rest of the structure down manually.

I will try to find the SP article and post it when I get a better chance.
     
     
  #9520  
Old Posted Oct 12, 2016, 12:11 AM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
Only 4 sections up for crane at college quarter today due to a 200 plus mobile crane we had ordered to erect the crane was broken down at the mines so hopefully tommorrow the next 4 sections plus an 8 ft section will be in place with the cab as well. Bringing it to 168 ft above ground
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.