HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development


Closed Thread

 
Thread Tools Display Modes
     
     
  #6801  
Old Posted Oct 6, 2016, 12:58 PM
br323206 br323206 is offline
Registered User
 
Join Date: Jul 2013
Posts: 447
[QUOTE=City Wide;7585124]
Quote:
Originally Posted by summersm343 View Post
CDR Submissions

PHA Headquarters - approved by default since this was the 2nd review

Aramark Headquarters - needs 2nd review

2501 Washington - approved

4440 Ridge - needs 2nd review

This is really an honest question-----now that its been around awhile and has a track record, has the CDR review process actually helped any project get substantially better? It seems like its just another hoop to jump through, and one that doesn't have any strength to fight in its own weight group. What is the CDR suppose to get done?
Just my observation, but it seems like small tweaks have come out of the process and slightly improved some designs. I don't remember anything getting drastically redesigned as a result of the process.
     
     
  #6802  
Old Posted Oct 6, 2016, 2:11 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
[QUOTE=br323206;7585426]
Quote:
Originally Posted by City Wide View Post

Just my observation, but it seems like small tweaks have come out of the process and slightly improved some designs. I don't remember anything getting drastically redesigned as a result of the process.
for the most part drastic changes arent needed. The CDR is primarily concerned with how large projects interact with their neighbors and the street level. They rarely call for major design changes or criticize an entire project. They ask for tweaks that will improve how the building interfaces with the public.
     
     
  #6803  
Old Posted Oct 6, 2016, 6:20 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,474
Updates from Building Philly

Penn Perelman Center for Political Science and Economics - 36th and Sansom - 7 floors





The Study Hotel at University City - 33rd and Chestnut - 10 floors





https://www.facebook.com/BuildingPhilly/
     
     
  #6804  
Old Posted Oct 6, 2016, 9:15 PM
PhilliesPhan's Avatar
PhilliesPhan PhilliesPhan is offline
Registered User
 
Join Date: Aug 2014
Location: Philadelphia
Posts: 1,364
I rode my bike through Manayunk today and saw that there are zoning notices "for the erection of a four-story building" on a large site on Main Street between Shurs Lane and Ridge Avenue!

Also, the apartments on Venice Island and Falls Ridge are coming along at a nice pace. I'll post pictures after I get out of my lecture at Temple.
__________________
No one outsmarts a Fox!

Temple University '18 ']['
     
     
  #6805  
Old Posted Oct 7, 2016, 1:16 AM
inkandiron88 inkandiron88 is offline
Registered User
 
Join Date: Aug 2016
Posts: 2
Quote:
Originally Posted by summersm343 View Post

Phase 1- Building 2 should be erected before the years end.
     
     
  #6806  
Old Posted Oct 7, 2016, 2:35 PM
Baconboy007 Baconboy007 is offline
Registered User
 
Join Date: Oct 2013
Posts: 462
Quote:
Originally Posted by PhilliesPhan View Post
I rode my bike through Manayunk today and saw that there are zoning notices "for the erection of a four-story building" on a large site on Main Street between Shurs Lane and Ridge Avenue!

Also, the apartments on Venice Island and Falls Ridge are coming along at a nice pace. I'll post pictures after I get out of my lecture at Temple.
If you're talking about the lot close to the CVS on main street I think that's an old zoning notice for a building that was shot down by the Wissahickon Civic a couple of years ago. The complaint was parking, steep slope, and I think there was a flooding issue. I liked it and voted for it but was in the minority.
     
     
  #6807  
Old Posted Oct 7, 2016, 7:05 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
If anyone is near the huge factory at 5th and Master they should get some pics, a lot of progress. I was near there this week- windows are going in, cranes are lifting materials onto upper floors, etc. I didnt see a lot of work on the facade but I'm sure that is coming soon.
     
     
  #6808  
Old Posted Oct 7, 2016, 7:39 PM
PhilliesPhan's Avatar
PhilliesPhan PhilliesPhan is offline
Registered User
 
Join Date: Aug 2014
Location: Philadelphia
Posts: 1,364
Quote:
Originally Posted by Baconboy007 View Post
If you're talking about the lot close to the CVS on main street I think that's an old zoning notice for a building that was shot down by the Wissahickon Civic a couple of years ago. The complaint was parking, steep slope, and I think there was a flooding issue. I liked it and voted for it but was in the minority.
I thought the same thing until I saw a new hearing date. Apparently, it will take place on Wednesday, October 12th at 5:00 PM. Also, the notices looked new and bright orange, which is what initially captured my attention. Looking at the pic that I took of the notice, the address is 3924 Main Street (Lot #13).
__________________
No one outsmarts a Fox!

Temple University '18 ']['
     
     
  #6809  
Old Posted Oct 7, 2016, 7:39 PM
PhilliesPhan's Avatar
PhilliesPhan PhilliesPhan is offline
Registered User
 
Join Date: Aug 2014
Location: Philadelphia
Posts: 1,364
Quote:
Originally Posted by 1487 View Post
If anyone is near the huge factory at 5th and Master they should get some pics, a lot of progress. I was near there this week- windows are going in, cranes are lifting materials onto upper floors, etc. I didnt see a lot of work on the facade but I'm sure that is coming soon.
Thanks for the tip! I'm going to stop by this upcoming week during my downtime between the classes I take at Temple
__________________
No one outsmarts a Fox!

Temple University '18 ']['
     
     
  #6810  
Old Posted Oct 7, 2016, 9:12 PM
Larry King Larry King is offline
Registered User
 
Join Date: Apr 2011
Location: Philadelphia
Posts: 976



Historically authentic windows as its a tax credit deal. Love it
     
     
  #6811  
Old Posted Oct 9, 2016, 1:19 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,907
Hanover - N. Broad and Callowhill - progress; and others

[IMG]Untitled

[IMG]Untitled

[IMG]Untitled

[IMG]Untitled

And across the street:

[IMG]Untitled

[IMG]Untitled
-------

Love Park

[IMG]Untitled
--------

1823 Callowhill project

[IMG]Untitled

[IMG]Untitled

can the rest of this large parcel be developed? I thought I've read before that it's a remediation nightmare?
--------

Can't we just cap the whole damn thing thru Logan Square... (sorry, very blurry)

[IMG]Untitled
     
     
  #6812  
Old Posted Oct 9, 2016, 1:29 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by TallCoolOne View Post
[IMG]
Can't we just cap the whole damn thing thru Logan Square... (sorry, very blurry)
Looks like a watercolor painting! Very cool.
     
     
  #6813  
Old Posted Oct 9, 2016, 1:47 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
This should be required reading/viewing for all Negadelphians (and check out some of those new towers in Moscow--that's right, MOSCOW!):

Out of the ashes: Cities destroyed by fire and rebuilt
     
     
  #6814  
Old Posted Oct 9, 2016, 2:08 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
     
     
  #6815  
Old Posted Oct 9, 2016, 2:10 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
     
     
  #6816  
Old Posted Oct 9, 2016, 7:40 PM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Walked by the in progress cap on Vine today. I think it's gonna be great. The expressway is such a scar on the face of the city. Hopefully, little by little, more of it can be capped. Maybe 16th through 18th street next. And then down to Broad.
     
     
  #6817  
Old Posted Oct 9, 2016, 9:24 PM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Quote:
Originally Posted by Philly Fan View Post
Not a peep about about altering the front steps. Is that still in play?
__________________
"Imagine all the people, living life in peace." :Lennon
     
     
  #6818  
Old Posted Oct 10, 2016, 1:18 AM
City Wide City Wide is offline
Registered User
 
Join Date: Aug 2014
Posts: 1,627
Quote:
Originally Posted by Philly-Drew View Post
Not a peep about about altering the front steps. Is that still in play?
If it happens, it wouldn't be until a much later stage in the construction
     
     
  #6819  
Old Posted Oct 10, 2016, 6:04 PM
tsarstruck tsarstruck is offline
Registered User
 
Join Date: Sep 2013
Posts: 351
Any news on Lincoln Square (the non-Blatstein NW corner of Broad&Wash)? I seem to remember somebody posting about soil samples being taken but can't find it anywhere.
     
     
  #6820  
Old Posted Oct 10, 2016, 6:08 PM
Boku Boku is offline
Registered User
 
Join Date: Jul 2014
Posts: 770
Pa. bank hires Philly boss, seeks Center City HQ

http://www.philly.com/philly/blogs/inq-p...lly-region-seeks-Center-City-office.html

Moving headquarters from the burbs into the city.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump



Forum Jump


All times are GMT. The time now is 2:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.