HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #10101  
Old Posted Sep 27, 2016, 11:46 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Quote:
Originally Posted by Alex Mackinnon View Post
I'd consider it more to be an issue with the design process rather than the Evergreen designer. A split process doesn't generally give the best end result.
The 3 platforms would be to accommodate reversing trains.
(i.e. solving the problem that prevents Columbia from being used as a terminus station)
     
     
  #10102  
Old Posted Sep 28, 2016, 3:48 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by ilikeredheads View Post
it becomes a 2 zone fare when you tap out in coquitlam
...Or any station Burquitlam and onwards for that matter. I know there's gonna be some route going up North Road/Como Lake for those wanting to save money. Forgot what it was
     
     
  #10103  
Old Posted Sep 28, 2016, 4:27 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,088
Quote:
Originally Posted by express691 View Post
...or any station burquitlam and onwards for that matter. I know there's gonna be some route going up north road/como lake for those wanting to save money. Forgot what it was
156, 180
     
     
  #10104  
Old Posted Sep 28, 2016, 5:38 AM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
The Evergreen website says that the Millennium Evergreen extension will be in service before Christmas. No specific date, but that is earlier than the "early 2017" that was promised due to the delay with the tunnel. So looks like Skytrain Mellenium trains won't be terminating at Lougheed for too long, before running through to Lafarge Park - Douglas.

http://www.evergreenline.gov.bc.ca/
     
     
  #10105  
Old Posted Sep 28, 2016, 6:24 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,698
Quote:
Originally Posted by lightrail View Post
The Evergreen website says that the Millennium Evergreen extension will be in service before Christmas. No specific date, but that is earlier than the "early 2017" that was promised due to the delay with the tunnel. So looks like Skytrain Mellenium trains won't be terminating at Lougheed for too long, before running through to Lafarge Park - Douglas.

http://www.evergreenline.gov.bc.ca/
That was announced back on September 8th I believe.
     
     
  #10106  
Old Posted Oct 3, 2016, 3:47 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Millennium Line Evergreen Extension will start service on Sunday 20th November 2016
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #10107  
Old Posted Oct 3, 2016, 4:20 AM
excel excel is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 3,484
^Wow awesome! Where did you hear this?
     
     
  #10108  
Old Posted Oct 3, 2016, 4:37 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by Olden Retreiver View Post
Millennium Line Evergreen Extension will start service on Sunday 20th November 2016
     
     
  #10109  
Old Posted Oct 3, 2016, 8:46 AM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Olden Retreiver View Post
Millennium Line Evergreen Extension will start service on Sunday 20th November 2016
Trollas gon troll.

Link your source, boo. Don't worry, I'd be happy to eat my words if this were true.
     
     
  #10110  
Old Posted Oct 3, 2016, 3:55 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,717
Millennium Line Evergreen Extension will start service on Sunday 27th November 2016

See? It's easy for me to say things without any proof too!
     
     
  #10111  
Old Posted Oct 3, 2016, 5:36 PM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Actually, if you look back at Vancouver's SkyTrain history, openings have always happened on a Saturday.
     
     
  #10112  
Old Posted Oct 4, 2016, 12:14 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
Lincoln Station from today.

     
     
  #10113  
Old Posted Oct 4, 2016, 12:26 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Talking

Quote:
Originally Posted by ilikeredheads View Post
it becomes a 2 zone fare when you tap out in coquitlam
Actually... this is an interesting scenario.

Get on the train in Surrey (Zone 3), travel to Coquitlam (Zone 3).

Is it a 2-zone ride or a 1-zone ride? You enter Zone 2 in New Westminster, so you'd probably get fined if you were caught in that area, but I'd be curious to know what the fare gates will do. For the majority of cases, it won't matter as you have to tap out at Columbia, but k

Scenario 1:
- Tap in @ Scott Road
- Tap Out @ Columbia ( 2 zone fare )
- Tap In @ Columbia ( Transfer )
- Cross-platform Transfer @ SFU/University Station
- Tap out In Coquitlam ( Zone 3 )
- Total: 2-zone fare ( because you tapped out at Columbia[/B] )

Scenario 2:
- Tap in @ Scott Road
- Cross Platform Transfer at Royal Oak ( Possibly up/down transfer could be possible earlier without tapping out? )
- Cross Platform Transfer at SFU/Univ. station
- Tap out in Coquitlam ( Zone 3 )
- Total 1 Zone fare? ( Travel started and ended in Zone 3 )

You're crossing into zone 2 when you enter New Westminster so I believe it's supposed to be a 2-zone fare (which makes sense given the distance involved) but I wonder how the SkyTrain software will handle this?

Note that the same would apply from Richmond to Burnaby via SkyTrain, but I believe a tap out is required at Waterfront there.

It should be an easy software fix, in any case ( simply create a pseudo Zone 3a, Zone 3b for Coquitlam and Surrey ) and make any taps between these two 2 zones, but I am curious if there is indeed a protocol for this kind of transit-hacking.
     
     
  #10114  
Old Posted Oct 4, 2016, 1:01 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,591
Quote:
Originally Posted by twoNeurons View Post
Scenario 1:
- Tap in @ Scott Road
- Tap Out @ Columbia ( 2 zone fare )
- Tap In @ Columbia ( Transfer )
- Cross-platform Transfer @ SFU/University Station
- Tap out In Coquitlam ( Zone 3 )
- Total: 2-zone fare ( because you tapped out at Columbia[/B] )
You wouldn't be tapping out at Columbia unless you were leaving the station - transferring from one platform to the other doesn't require a tap out and another tap in. I also wonder what TransLink has planned for this type of trip.
     
     
  #10115  
Old Posted Oct 4, 2016, 1:44 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Sheba View Post
You wouldn't be tapping out at Columbia unless you were leaving the station - transferring from one platform to the other doesn't require a tap out and another tap in. I also wonder what TransLink has planned for this type of trip.
It's probably a valid thing to consider, but it's more likely it will become a pay-by-distance thing in the future.
     
     
  #10116  
Old Posted Oct 4, 2016, 2:10 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,091
Quote:
Originally Posted by vanman View Post
Lincoln Station from today.

-img-
I'm mildly curious what's with the person in the electric wheelchair being escorted. Is the sidewalk closed?
     
     
  #10117  
Old Posted Oct 4, 2016, 3:40 AM
Kwik-E-Mart Kwik-E-Mart is offline
A.H.-Ha!
 
Join Date: Mar 2008
Location: Cambie Village, Van City
Posts: 348
Quote:
Originally Posted by scryer View Post
Trollas gon troll.

Link your source, boo. Don't worry, I'd be happy to eat my words if this were true.
To be honest, Olden Retriever doesn't seem like throwing that date out there for no reason. At least for me, I'll take whatever he says and see if that is true a few weeks prior to Nov 20 -- with the expected fanfare, Mk IIIs (just for the big occasion), and Christy photo-ops (yeah, I will be voting orange for the first time since I became eligible to vote in BC).

Now that I have replaced my home address from Tri-City to Van City, it will definitely be better and easier to visit my friends who remain entrenched in Pomocopoco... not to mention about the microbreweries at Rocky Point Park.

Last edited by Kwik-E-Mart; Oct 4, 2016 at 6:17 AM.
     
     
  #10118  
Old Posted Oct 4, 2016, 3:48 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by twoNeurons View Post
Actually... this is an interesting scenario.

Get on the train in Surrey (Zone 3), travel to Coquitlam (Zone 3).

Is it a 2-zone ride or a 1-zone ride? You enter Zone 2 in New Westminster, so you'd probably get fined if you were caught in that area, but I'd be curious to know what the fare gates will do. For the majority of cases, it won't matter as you have to tap out at Columbia, but k

Scenario 1:
- Tap in @ Scott Road
- Tap Out @ Columbia ( 2 zone fare )
- Tap In @ Columbia ( Transfer )
- Cross-platform Transfer @ SFU/University Station
- Tap out In Coquitlam ( Zone 3 )
- Total: 2-zone fare ( because you tapped out at Columbia[/B] )

Scenario 2:
- Tap in @ Scott Road
- Cross Platform Transfer at Royal Oak ( Possibly up/down transfer could be possible earlier without tapping out? )
- Cross Platform Transfer at SFU/Univ. station
- Tap out in Coquitlam ( Zone 3 )
- Total 1 Zone fare? ( Travel started and ended in Zone 3 )

You're crossing into zone 2 when you enter New Westminster so I believe it's supposed to be a 2-zone fare (which makes sense given the distance involved) but I wonder how the SkyTrain software will handle this?

Note that the same would apply from Richmond to Burnaby via SkyTrain, but I believe a tap out is required at Waterfront there.

It should be an easy software fix, in any case ( simply create a pseudo Zone 3a, Zone 3b for Coquitlam and Surrey ) and make any taps between these two 2 zones, but I am curious if there is indeed a protocol for this kind of transit-hacking.
The fare gates only consider where you tap out. How many times you cross the zone boundary is irrelevant. For example, if you take the skytrain at Joyce and ride it all the way to surrey and back, and tap out at 29th Ave, it'll only be a 1 zone fare. The system doesn't know that you travel all the way to Surrey, and it doesn't need to know because you haven't tapped out yet.

In your scenarios, although you would save $1.25 by changing trains at Royal Oak (or Edmond) without having to tap out, you would have to spend more time in the system. It's a time vs money thing.

I know that Columbia doesn't have an island platform, but I thought you could always go to the other platform without the need to tap out. The gates are right at the extrance.
     
     
  #10119  
Old Posted Oct 4, 2016, 4:04 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
I sat on this for 3 weeks to see if anyone else would pick it up. More recently heard it again in a different venue, but no absolute confirmation, at least not on the record.

Skip to 1:50 in the video for Agenda item 11.1

http://portmoodybc.swagit.com/play/09132016-1492/#2
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #10120  
Old Posted Oct 4, 2016, 5:50 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by ilikeredheads View Post
I know that Columbia doesn't have an island platform, but I thought you could always go to the other platform without the need to tap out. The gates are right at the extrance.
Not sure if that would be the same thing at Lougheed - Im pretty sure the stationhouse allows for a cross-platform transfer without tapping out (at least I think thats the case for the North Stationhouse.)

However, there is only one path between Surrey and Coquitlam and just by tapping out anywhere along the extension, it knows you completed a cross platform transfer at Lougheed.

Even tweeted at Translink and they had no details.

"Sorry, at the moment we do not have those details but will check to make sure.^jd"
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.