Quote:
Originally Posted by MalcolmTucker
Sigh. But yeah, the funding is complicated for this thing, mostly because none of the funders are really interested in writing down in one place the funding flows, especially when it involves grant stacking where some grants are anticipatory in my reading.
There is Phase 1 ( 17th Avenue SE corridor between 26 Street SE and Hubalta Road SE), funded with $65.3 million from GreenTrip (100% provincial).
Phase 2 is funded from $42.5 federal, with promise of $21.25 each from the province and the city. The provincial portion will likely come from another GreenTrip round to happen this fall (submissions closed August 31).
So it adds up to $150.3 million.
|
But the cost estimate from the 2010 TPS linked above is
$247.7 million total, with $94.2 million from "Deerfoot to Stoney" and $153.5 from "Deerfoot to Downtown". It seems clear to me from the descriptions in the report that Deerfoot actually means more like 26th St SE (i.e. at the top of the hill).
The $94.2 million for "Deerfoot to Stoney" is based on roughly 6.5 km of median transitway out to about 92nd St SE past Stoney and the new sprawl mall; it's not being built that far, rather stopping at Hubalta, about half the way (but the half with more existing infrastructure and more work to do), which is the Phase 1 funded with $65 million provinicial. That story checks out.
The $153.5 million that I rounded to $150 million was for the transitway from roughly 30 St SE to the downtown (identified as "long range" in the report), including bridges over the Deerfoot, Bow River and the CPR S of Inglewood, plus a tunnel under Blackfoot ultimately tying into the SETWAY just before the 12th St SE bridge. If the current funding is only $85 million, then this is consistent with building roughly half of the total scope, i.e. the portion to the Blackfoot truck stop.
If we want to assume the dollars are the same (for the sake of simplicity) then there's still two portions of the 2010 design unfunded, $30M or so for the section from Hubalta past Stoney which has a limited benefit and limited constituency, and $70M or so for the Blackfoot Truck Stop to SETWAY connection that doesn't make much sense if the SETWAY is an LRT line but this is a BRT line.
I think we're both in agreement; it would be nice if the City would release something showing the actual scope/design of the $85 million project they just got (mostly) (promised) funding for.