Quote:
Originally Posted by LO 044
So putting all the reduction and cancellation of flights together plus reiterating again that YEG is no tourist hot spot, what is the terminal's capacity versus utilization at this point?
Is the terminal's gates completely full at anytime? If not, do we need the north terminal at this point in time? Would this be a good time to renovate the north terminal with lower construction costs and the lack of need for it? Or will we ever need the north terminal gates in the future? Can it be repurposed in some way?
|
There is no definitive calculation of terminal capacity. There is definitive calculation of the components of terminal; checkin space, pre board security throughput, gate utilization. One major obstacle to calculating gate utilization is determining the split between narrow-body utilization and wide-body utilization. It's not as simple as calculating based upon bridge heads or double counting wide-body flights. But this is a little to much inside baseball.
Direct answer the question, the North Terminal is still utilized by WestJet and a few other regional operators. The key question is whether WS can move their aircraft over to South Terminal without major disruption in their operation.
It is likely that the North operations could move to the South terminal for the winter season, but what if a major renovation requires a summer or two in order to complete the project? Under this scenario, the North Terminal would be completely reconstructed or taken down to metal beams and concrete posts.
Another point to consider, transborder sector has the largest decrease in passenger traffic and gate utilization. There might be North Terminal renovations in order to move gates from transborder use to domestic/international use. For example, the transborder operations would have to move to gates 78/80, 82/84, 86/88. This would free up gates 74/76 and 70/72 for exclusive domestic operations. Now I remember that gate 70 is a swing gate but I also remember that this is not a preferred gate use because passengers are congregating around gate 66/68. This is where North Terminal renovations would be required to split the traffic between domestic and transborder.
Do some bar napkin calculations, there is insufficient south terminal gates to fully close the north terminal. Like the math teacher says, "show your work":
- AC requires gates 50/52 and 54/56.
- Gate 60 goes to KLM.
- Gate 62 is used for FI and this blocks gate 64 from use.
- Gates 66/68 and 70/72 could go to Westjet provided that they don't require a widebody gate for LGW. Even then restricting WS to 4 gates is very tight margin with no room for error.
One final suggestion, if the north terminal requires a ground up rebuild, the north side of gate 49 would have to be converted to a bus operation for 737/320 size aircraft that are relocated to remote stands.