HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


Closed Thread

 
Thread Tools Display Modes
     
     
  #4401  
Old Posted Sep 14, 2016, 4:33 PM
McBoo McBoo is offline
Registered User
 
Join Date: May 2015
Posts: 747
Okay so, 3.3 feet/metre, my calculator says just over 50 stories.
     
     
  #4402  
Old Posted Sep 14, 2016, 4:57 PM
edmontonoilers89's Avatar
edmontonoilers89 edmontonoilers89 is offline
Registered User
 
Join Date: Aug 2002
Location: Calgary/Edmonton
Posts: 424
Quote:
Originally Posted by hilman View Post
ICE District tower B (Greyhound land)

Job No 162139487-038
Description: To construct an addition (increase building Height to 188.1 m and add 1,490 sq.m. of Floor Area) to a mixed Use Tower.
Location: 10324 - 103 STREET NW
Plan NB1 Blk 3 Lot 196
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 183-184,189-195
10324 - 103 STREET NW
Plan NB1 Blk 3 Lots 197-198
10360 - 102 STREET NW
Plan 1321953 Blk 2 Lot 1
10220 - 103 AVENUE NW
Plan 1321953 Blk 2 Lot 2
Applicant: DIALOG
Status: To Be Assigned
Create Date: 9/9/2016 11:33:47 AM
Is the entire complex on the Greyhound lands being built concurrently with Stantec/JW?
     
     
  #4403  
Old Posted Sep 14, 2016, 5:03 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,008
Quote:
Originally Posted by EdmTrekker View Post
That is not what was the result of the community consultation process. Nor was the current design vetted with the public. A change has been made and the City has not explained why - and they should. Did the original supplier go into receivership? What is the basis for the decision to go with these poles (which look silly on the bases they are on). Frankly, as is - I am concerned the City is "at is again" screwing things up - even the most simple.
A little dramatic aren't we.
__________________
"Call me sir, goddammit!"
     
     
  #4404  
Old Posted Sep 14, 2016, 5:05 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,008
Quote:
Originally Posted by edmontonoilers89 View Post
Is the entire complex on the Greyhound lands being built concurrently with Stantec/JW?
Yes.
__________________
"Call me sir, goddammit!"
     
     
  #4405  
Old Posted Sep 14, 2016, 5:06 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,022
Quote:
Originally Posted by CMD UW View Post
A little dramatic aren't we.
Bingo.

They were not satisfied with the final product and went to something else.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #4406  
Old Posted Sep 14, 2016, 5:19 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,246
Quote:
Originally Posted by Coldrsx View Post
Bingo.

They were not satisfied with the final product and went to something else.
Obviously they went with something else. WHY they went with something else should be communicated as this project evolved through a public consultation process. Are you suggesting the City Staff should not be concerned about communicating changes it makes following public consultation processes?
     
     
  #4407  
Old Posted Sep 14, 2016, 6:07 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Speak of the devil, the new garbage cans are being installed on Jasper right now

Those new light standards look alright. I am curious though about the real reason behind the delays
     
     
  #4408  
Old Posted Sep 14, 2016, 6:37 PM
big W big W is offline
Registered User
 
Join Date: Oct 2003
Location: E-Town
Posts: 5,426
Quote:
Originally Posted by McBoo View Post
Okay so, 3.3 feet/metre, my calculator says just over 50 stories.
It would be 617 feet. I would guess 55 actually. Remember JW Marriott will be 56 stories at 192 M or 627 feet. So knock off one floor. Nice to have another tower height increase. It means demand for the units is definitely there.
__________________
SHOFEAR- "The other goalie should have to turn in his man card. What a sorry display that was." - March 24, 2008
     
     
  #4409  
Old Posted Sep 14, 2016, 6:38 PM
sdimedru sdimedru is offline
Registered User
 
Join Date: Nov 2006
Posts: 741
Quote:
Originally Posted by big W View Post
It would be 617 feet. I would guess 55 actually. Remember JW Marriott will be 56 stories at 192 M or 627 feet. So knock off one floor. Nice to have another tower height increase. It means demand for the units is definitely there.
Hope to see an improved iteration of the tower design, great to hear of height increases !
     
     
  #4410  
Old Posted Sep 14, 2016, 7:11 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,022
Great presentation by Chris Dulaba of Callidus/Beljan and Barb from the City of Edmonton Brownfield redevelopment grant at the NAIOP lunch today.

This is such an important program given the number of prime corner/community spots.

https://www.edmonton.ca/programs_service...wnfield-redevelopment-grant-program.aspx
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #4411  
Old Posted Sep 14, 2016, 7:30 PM
McBoo McBoo is offline
Registered User
 
Join Date: May 2015
Posts: 747
Unsure why CoE didn't stick with the light pole and stop light design on 108 Street.

Not that the new design isn't nice, just that it appears to leave us with those big dumbass stop lights.
     
     
  #4412  
Old Posted Sep 14, 2016, 8:37 PM
Jaws Jaws is offline
Registered User
 
Join Date: Mar 2009
Posts: 1,360
Quote:
Originally Posted by 240glt View Post
Speak of the devil, the new garbage cans are being installed on Jasper right now


I'm sure those exposed aggregate can have been around since the late '70s. Great news.
     
     
  #4413  
Old Posted Sep 14, 2016, 8:55 PM
ExcaliburKid's Avatar
ExcaliburKid ExcaliburKid is offline
Derp
 
Join Date: Sep 2006
Location: Edmonton
Posts: 2,226
They should take all the aggregate garbage bins and use them to replace the granite bollards on 108 street
Those things could take a nuclear blast, snow plows and hapless parallel parkers would be no match
     
     
  #4414  
Old Posted Sep 14, 2016, 9:03 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
I'd take a couple off the city's hands. I'm sure they'd make great mooring anchors for out at the cottage in BC
     
     
  #4415  
Old Posted Sep 14, 2016, 9:28 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
^^ hahah nuclear blast.

Greyhound height increase.....yes.
     
     
  #4416  
Old Posted Sep 14, 2016, 11:51 PM
Xelebes's Avatar
Xelebes Xelebes is online now
Sawmill Billowtoker
 
Join Date: Nov 2006
Location: Rockin' in Edmonton
Posts: 14,016
Quote:
Originally Posted by 240glt View Post
Speak of the devil, the new garbage cans are being installed on Jasper right now

Those new light standards look alright. I am curious though about the real reason behind the delays
I'm assuming there was issue taken with the fans on the third tusk. Maybe it had something to do with the interaction with tree canopies. Who knows.
__________________
The Colour Green
     
     
  #4417  
Old Posted Sep 14, 2016, 11:54 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is online now
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,893
Quote:
Originally Posted by 240glt View Post
Speak of the devil, the new garbage cans are being installed on Jasper right now
On my way home via 101 St I crossed Jasper Ave and I still saw the old concrete bins. So I don't know where you witnessed the new ones being installed.

Oh, and just one new light pole has gone up in front of Commerce Place.
     
     
  #4418  
Old Posted Sep 15, 2016, 4:20 AM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,008
Quote:
Originally Posted by EdmTrekker View Post
Obviously they went with something else. WHY they went with something else should be communicated as this project evolved through a public consultation process. Are you suggesting the City Staff should not be concerned about communicating changes it makes following public consultation processes?
Let's call for an inquiry!!!!! Sorry, but there's other fish to fry.
__________________
"Call me sir, goddammit!"
     
     
  #4419  
Old Posted Sep 15, 2016, 6:04 AM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
So the new streetlights look better than the original.
Let's just be happy they ditched the pure 90s design with a weird flag sticking up.
I do hope the LED "tusk" eventually gets in stalled.
     
     
  #4420  
Old Posted Sep 15, 2016, 6:14 AM
Makenosmallplans Makenosmallplans is offline
Erik Soderstrom
 
Join Date: Mar 2014
Location: Edmonton - Pleasantview
Posts: 223
Quote:
Originally Posted by Hardhatdan View Post
So the new streetlights look better than the original.
Let's just be happy they ditched the pure 90s design with a weird flag sticking up.
I do hope the LED "tusk" eventually gets in stalled.
and it looks like there is light on the sidewalk (or am i wrong?)... this has always puzzled me... cars have lights. pedestrians don't. but streetlights tend to light only the roadway. if we want people walking on the street/sidewalk, the sidewalks need to be lit. i'm on board for that.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 1:47 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.