  #741  
Old Posted Sep 9, 2016, 8:29 PM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
Shortly after my last post we received an answer from customer care regarding a walk through. When we asked in August they said to contact them in Sept., now they say to contact them in Oct.. Anybody want to bet what their next answer will be?
Reply With Quote
     
     
  #742  
Old Posted Sep 10, 2016, 3:36 AM
DsZ24 DsZ24 is online now
Registered User
 
Join Date: Apr 2010
Posts: 19
Is occupancy for this project supposed to be for both towers at once? If so, by the last set of pictures posted here this seems pretty far off. Looks like for the 2nd tower they still had another slab or 2 to pour, install the rest of the windows. Do the interior framing for the remaining floors, the rough in for the trades then drywall. Also the takedown of the crane and the manlift. I work in high rise construction and it doesn't take much to put a project behind schedule. Especially when it comes to the finishing stage, once drywall and paint is complete there seems to be never ending touch ups because of damage that occurs. I think a November occupancy here would be a real stretch, but hopefully the sooner the better for those of you who have bought into this project.
Reply With Quote
     
     
  #743  
Old Posted Sep 11, 2016, 5:08 AM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
Quote:
Originally Posted by DsZ24 View Post
Is occupancy for this project supposed to be for both towers at once? If so, by the last set of pictures posted here this seems pretty far off. Looks like for the 2nd tower they still had another slab or 2 to pour, install the rest of the windows. Do the interior framing for the remaining floors, the rough in for the trades then drywall. Also the takedown of the crane and the manlift. I work in high rise construction and it doesn't take much to put a project behind schedule. Especially when it comes to the finishing stage, once drywall and paint is complete there seems to be never ending touch ups because of damage that occurs. I think a November occupancy here would be a real stretch, but hopefully the sooner the better for those of you who have bought into this project.
My understanding is no. Occupancy was to be west tower first then east tower and townhouses second. That said, east tower has done some catch up as a result of delays in west tower. I'd imagine it is still the intention to occupy west as east tower isn't even topped off and a good 8 months give or take from final completion. West is a lot closer and unless something explodes, you'll likely see occupancy near end of the year and into January.

Like I've said before, inspections probably October/November with occupancy December/January. That's an educated guess on my part and I'd love to be proven wrong to the "sooner" side of things.
Reply With Quote
     
     
  #744  
Old Posted Sep 11, 2016, 4:34 PM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
Quote:
Originally Posted by jhausner View Post
My understanding is no. Occupancy was to be west tower first then east tower and townhouses second. That said, east tower has done some catch up as a result of delays in west tower. I'd imagine it is still the intention to occupy west as east tower isn't even topped off and a good 8 months give or take from final completion. West is a lot closer and unless something explodes, you'll likely see occupancy near end of the year and into January.

Like I've said before, inspections probably October/November with occupancy December/January. That's an educated guess on my part and I'd love to be proven wrong to the "sooner" side of things.
I think you have your East and West mixed up. The East tower was sold 1st, started 1st, and topped off in early March. I strongly suspect delays on the East tower were caused by transferring crew to the West tower.
As for inspections, Concord told us they were being carried out on the finished lower floors already as the building progressed upward, again this was back in March. Occupancy of the East tower was supposed to be 6-8 months before that of the West tower.
Reply With Quote
     
     
  #745  
Old Posted Sep 11, 2016, 6:26 PM
rokim99 rokim99 is offline
Registered User
 
Join Date: Sep 2014
Posts: 265
Quote:
Originally Posted by boatman12 View Post
I think you have your East and West mixed up. The East tower was sold 1st, started 1st, and topped off in early March. I strongly suspect delays on the East tower were caused by transferring crew to the West tower.
As for inspections, Concord told us they were being carried out on the finished lower floors already as the building progressed upward, again this was back in March. Occupancy of the East tower was supposed to be 6-8 months before that of the West tower.

What !! Are you saying they started inspections already? Like lower floors ? What floor was your suite again ?
Reply With Quote
     
     
  #746  
Old Posted Sep 11, 2016, 7:36 PM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
Quote:
Originally Posted by rokim99 View Post
What !! Are you saying they started inspections already? Like lower floors ? What floor was your suite again ?
Not inspections by owners, by municipal building inspectors.
Reply With Quote
     
     
  #747  
Old Posted Sep 12, 2016, 2:26 AM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
Quote:
Originally Posted by boatman12 View Post
I think you have your East and West mixed up. The East tower was sold 1st, started 1st, and topped off in early March. I strongly suspect delays on the East tower were caused by transferring crew to the West tower.
As for inspections, Concord told us they were being carried out on the finished lower floors already as the building progressed upward, again this was back in March. Occupancy of the East tower was supposed to be 6-8 months before that of the West tower.
Correct I did mean it the other way my bad. Flip them, east first, west and townhouses second. As for occupancy, they are probably lined up then. Sounds like both are delayed. Typically when a tower tops out occupancy is between 6-8 months after. West is still about 3 floors to go + the mechanical so maybe 2 months away from being topped out. Then + 6-8 months after that.
Reply With Quote
     
     
  #748  
Old Posted Sep 13, 2016, 1:32 AM
rokim99 rokim99 is offline
Registered User
 
Join Date: Sep 2014
Posts: 265
I finally walked over the contruction site TODAY to take some picture of the lobby.. what do you guys think the progression is like?? any experts please chime in. Thanks




Reply With Quote
     
     
  #749  
Old Posted Sep 13, 2016, 5:03 AM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Nice to see the lobby of the first tower finally coming together. Looks good in those photos. 100 Ave got a nice new landscaped/brick median as part of the project too.
Reply With Quote
     
     
  #750  
Old Posted Sep 13, 2016, 5:07 AM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Pic from today (Sep 12)

Side Note: You can see the excavation pit for what will be 2 x 6 storey condo buildings towards the left of this pic at 101 & 137A.

Reply With Quote
     
     
  #751  
Old Posted Sep 13, 2016, 3:11 PM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
I doubt there will be any walk throughs until that outside elevator comes down.
Reply With Quote
     
     
  #752  
Old Posted Sep 16, 2016, 10:04 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
From Yellow Fever at SSC:

Quote:
Originally Posted by Yellow Fever View Post
Quote:
Originally Posted by Yellow Fever View Post
Reply With Quote
     
     
  #753  
Old Posted Sep 19, 2016, 7:41 PM
rokim99 rokim99 is offline
Registered User
 
Join Date: Sep 2014
Posts: 265
Can anybody let us know when the outside elevator is starting to come down ?
Reply With Quote
     
     
  #754  
Old Posted Sep 20, 2016, 12:07 AM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
Quote:
Originally Posted by rokim99 View Post
Can anybody let us know when the outside elevator is starting to come down ?
According to Concord, possibly not until the middle of Nov. Of course they might also send out another amendment after that with some obscure reason for more delays. Check that, they don't give reasons for delays, unless saying "these things happen" can be considered a reason.
Reply With Quote
     
     
  #755  
Old Posted Sep 20, 2016, 12:47 AM
clee7903 clee7903 is offline
Registered User
 
Join Date: Dec 2010
Location: Surrey
Posts: 330
Quote:
Originally Posted by rokim99 View Post
Can anybody let us know when the outside elevator is starting to come down ?
I drove by today and noticed the outside elevator is still pretty much there. Still got a while to wait...
Reply With Quote
     
     
  #756  
Old Posted Sep 20, 2016, 4:09 AM
rokim99 rokim99 is offline
Registered User
 
Join Date: Sep 2014
Posts: 265
Quote:
Originally Posted by boatman12 View Post
According to Concord, possibly not until the middle of Nov. Of course they might also send out another amendment after that with some obscure reason for more delays. Check that, they don't give reasons for delays, unless saying "these things happen" can be considered a reason.
Did concord actually say this ? If we are moving in on November.. how can it come down on November... it should come down on October at least right ?
Reply With Quote
     
     
  #757  
Old Posted Sep 20, 2016, 4:37 AM
boatman12 boatman12 is offline
Registered User
 
Join Date: Jul 2016
Posts: 218
Quote:
Originally Posted by rokim99 View Post
Did concord actually say this ? If we are moving in on November.. how can it come down on November... it should come down on October at least right ?
The last amendment said construction might not be complete until Nov. 14, not that we will be able to move in then. They could even extend that, as they already have done. Remember when construction was supposed to be complete by June 30th?
Reply With Quote
     
     
  #758  
Old Posted Sep 21, 2016, 8:32 PM
shsieh shsieh is offline
Registered User
 
Join Date: Jul 2016
Posts: 27
Walked past the site today they are taking down the service elevator today. The wood panels are coming down also the elevator access to the top floors are being taken down.

Reply With Quote
     
     
  #759  
Old Posted Sep 21, 2016, 8:49 PM
rokim99 rokim99 is offline
Registered User
 
Join Date: Sep 2014
Posts: 265
Quote:
Originally Posted by shsieh View Post
Walked past the site today they are taking down the service elevator today. The wood panels are coming down also the elevator access to the top floors are being taken down.

Omg !! This is good news. Does that mean that we are finally getting closer for walkthrough ???!
Reply With Quote
     
     
  #760  
Old Posted Sep 21, 2016, 11:51 PM
shsieh shsieh is offline
Registered User
 
Join Date: Jul 2016
Posts: 27
sure hope so at this point i much rather be paying mortgage than rent. But it still looks like a lot of work the entire North/West side where the elevator shaft was the balconies is unfinished. Also saw them laying concrete for drive way into the parkade today.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 7:53 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.