Quote:
Originally Posted by lrt's friend
It is not the best solution if it is by far the most expensive one. And downtown, a subway would have been mandatory. There is no way, we would have an 'EL' from Lebreton Flats to University of Ottawa. It would have absolutely destroyed the streetscape downtown.
You notice that we are not even considering any significant elevated portions of the Confederation Line. Why? Cost and because nobody wants an elevated railway running through their neighbourhood. That would not have been an acceptable solution along Byron.
Ottawa did a lot of experimenting by going to Transitways. It was unique. There were risks. But building grade separated roads is something that was not risky. Building a skytrain with overhead wiring would have been much more risky with no implementations anywhere.
Why would we assume that something like this that would have cost the city and province billions in the 1980s instead of hundreds of millions would have ever taken place or even be advisable?
|
"Absolutely destroyed the streetscape downtown seems" like a fair bit of hyperbole. The detroit people mover (same technology, same era) runs above grade downtown. This
street, for example is seems reasonably lively, people are enjoying a patio (more than they would on Slater or Albert with hundreds of buses going by). The EL in Chicago is a heavy rail technology, and hardly has the same impact on the urban fabric. But, I take your point that the politics might have required a tunnel. But even so, it would have been much cheaper than a bus tunnel (smaller, less ventilation, etc) and certainly cheaper than building a busway and ripping it up 20 years later to build a light rail system.
One of the reasons that elevated systems weren't considered (despite the recommendation from manufacturers) is that the city included criteria such as "Ability to build a nonsegregated system in low density areas " among the selection
criteria, which precluded light-metro and driver-less options.