Quote:
Originally Posted by bomberjet
That'd be ridiculous if the single point interchange had Main as free flow. I know the original open house showed that.
|
It would be so mind-bogglingly stupid if they did that. The only way it could be rationalized IMO is as a prank by someone in engineering who was retiring soon and just wanted to see if he could get away with it.
Another irritant in the new diagram is the dogleg for CPT around Little Mountain Park. Seriously, there will be an awkwardly sharp curve in the road to save a piece of scrub land that could easily be duplicated anywhere else?
It's amusing to see the design process at work here... this is how a Winnipeg expressway is born. I look forward to more doglegs around softball diamonds, diamond interchanges with the stoplights on the expressway.
Maybe they could consider some other fun "only in Winnipeg" customizations to CPT? Here are a few ideas:
-A drive-thru Tim Hortons and Co-op gas bar between the EB and WB lanes
-New fire station with direct expressway access and a stop light
-30 km/h school zones just to be on the safe side
-Even more retention ponds to ensure maximum amounts of goose 🞵🞵🞵🞵 on the road
Oh well, at least it's not just rapid transit that gets botched in this place.