The city could try consolidating a few lots deep behind commercial buildings as the come up for sale on bank, and then eliminate street parking to retain traffic lanes when building dedicated transit. I'd bet it would be the most economical politically feasible option.

During special events buses could run southwards from Landsdowne to various points partly on the exclusive ROW while the lrt vehicles are concentrated on the northern segment to provide surge ppdph.
     
     
  #3542  
Old Posted Aug 9, 2016, 1:20 PM
wingman's Avatar
wingman wingman is offline
Registered User
 
Join Date: Jul 2007
Posts: 331
Quote:
Originally Posted by MalcolmTucker View Post
The city could try consolidating a few lots deep behind commercial buildings as the come up for sale on bank, and then eliminate street parking to retain traffic lanes when building dedicated transit. I'd bet it would be the most economical politically feasible option.

During special events buses could run southwards from Landsdowne to various points partly on the exclusive ROW while the lrt vehicles are concentrated on the northern segment to provide surge ppdph.
This is what I was thinking. You don't need to park in front of the stores, but to keep the same access having parking 1 block on either side is essential (technically not, but in our case for our region it is). So Kent and O'Connor become the car streets with ample parking... with that I think it could work and I am sure there are some examples somewhere in North America.
     
     
  #3543  
Old Posted Aug 9, 2016, 4:26 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by wingman View Post
This is what I was thinking. You don't need to park in front of the stores, but to keep the same access having parking 1 block on either side is essential (technically not, but in our case for our region it is). So Kent and O'Connor become the car streets with ample parking... with that I think it could work and I am sure there are some examples somewhere in North America.
Why not build underground parking with new commercial and residential space above.
     
     
  #3544  
Old Posted Aug 9, 2016, 4:36 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by swimmer_spe View Post
Why not build underground parking with new commercial and residential space above.
Because we don't have 50 years and $50,000 per parking spot. But nothing stopping that from happening organically.
     
     
  #3545  
Old Posted Aug 9, 2016, 4:40 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by MalcolmTucker View Post
Because we don't have 50 years and $50,000 per parking spot. But nothing stopping that from happening organically.
I mean in the future. Every new building along certain streets must have public underground parking. Then someone wanting to walk to another shop can, and their car is safe.
     
     
  #3546  
Old Posted Aug 9, 2016, 5:47 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by wingman View Post
You don't need to park in front of the stores, but to keep the same access having parking 1 block on either side
I never understand why retailers feel they need to having parking spots in front of their store. How often does someone get a parking spot in front of the store they are going to? Usually you end up parking a block or two away and walking.
     
     
  #3547  
Old Posted Aug 9, 2016, 5:48 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by swimmer_spe View Post
I mean in the future. Every new building along certain streets must have public underground parking. Then someone wanting to walk to another shop can, and their car is safe.
Underground parking is hard to fit in developments below a certain footprint though. By necessity you'd be pushing development to projects that stretch half a block or more.

The lot buy up strategy is just a sop to the business owners along bank to reduce potential opposition. Don't expect super extraordinary results from it, or any other parking strategy.
     
     
  #3548  
Old Posted Aug 9, 2016, 5:59 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by swimmer_spe View Post
I mean in the future. Every new building along certain streets must have public underground parking. Then someone wanting to walk to another shop can, and their car is safe.
Agreed. I have often thought that land used exclusively for parking should be taxed at a high rate per square meter of land to encourage underground, rooftop and multilevel parking. The first two would not be taxed at a premium as the land is primarily used for something else and the last would, but the premium would effectivly be divided over the number of levels of parking. Existing developments could be grandfathered over a period of time to give them time to make the changes, but new developments would be taxed immediately to ensure they change their plans accordingly.

Incentives should also be added for neighboring parking lots (especially retail parking lots) to share an entrance to reduce the number of intersections.
     
     
  #3549  
Old Posted Aug 9, 2016, 6:17 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by MalcolmTucker View Post
Underground parking is hard to fit in developments below a certain footprint though. By necessity you'd be pushing development to projects that stretch half a block or more.
Its surprising what can be done in a small space. As discussed in another thread, this project has 3 levels of underground parking in only about 3600 sq. m (about a quarter city block).
     
     
  #3550  
Old Posted Aug 9, 2016, 7:26 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Still the entire frontage on Bank + 30 m if the developments longer (front) side fronted Bank. For comparison the block with the Shoppers and Metro in the Glebe is 66 m. (The lot you linked to has ~98 m of frontage on Richmond).

Also short block lengths will limit train lengths, unless a good number of intersections are made right in, right out only.
     
     
  #3551  
Old Posted Aug 9, 2016, 7:33 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,781
If trains are running on the surface on Bank Street or any other street, you do not want them to be Confederation Line length. The vehicles have to be scaled to the situation and they cannot be so long as to impede even pedestrian traffic.
     
     
  #3552  
Old Posted Aug 9, 2016, 8:24 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by MalcolmTucker View Post
Still the entire frontage on Bank + 30 m if the developments longer (front) side fronted Bank. For comparison the block with the Shoppers and Metro in the Glebe is 66 m. (The lot you linked to has ~98 m of frontage on Richmond).
You are right. The Glebe has shorter blocks. I was looking closer to downtown where most blocks are about 75 or 80 m.

Quote:
Also short block lengths will limit train lengths, unless a good number of intersections are made right in, right out only.
Very true. Another good reason for tunneling under Bank.
     
     
  #3553  
Old Posted Aug 12, 2016, 4:46 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
Construction Update
Week of August 8


In the downtown area, crews install structural steel at the Parliament Station east entrance head house. Progress continues in the eastern section of the guideway, where crews prepare to install tracks between Hurdman and Tremblay stations.




West Stations

Tunney’s Pasture Station: Crews mobilize on site to begin demolition of the existing structures.

Bayview Station: Crews continue drilling caissons as part of station foundation work. Ground improvement activities are ongoing. During construction activities currently underway, and for the safety of all Bayview pathway users, short-term closures are required. Flaggers are onsite to assist users.

Pimisi Station: Caisson and duct bank installations are ongoing. Crews begin installing formwork and rebar in preparation for future station concrete work.




Central Stations

Lyon Station cavern: Crews install rebar and pour concrete for the station concourse. Station arch final lining pours are ongoing. At West Portal, excavation of the ramp continues.

Lyon Station west entrance: Crews waterproof, install rebar and formwork, and pour concrete for the station elevator and escalator.

Lyon Station east entrance: Work on the station elevator and walls continues; activities include formwork and rebar installation, and utility relocations.

Parliament Station cavern: Crews continue working on station L-walls; activities include formwork and concrete pours. Mechanical and electrical work occurs.

Parliament Station west entrance: Crews finalize the installation of the steel head house, work on the station roof and pour columns on the parking level. Excavation continues at street level. At the east vent shaft, crews install reinforcements.

Parliament Station east entrance: Work continues on the station walls with rebar installation and concrete pours. Structural steel installation for the station head house is ongoing.

Traffic restrictions on Queen and O’Connor streets remain in effect.




Rideau Station cavern: Arch waterproofing and rebar installation are ongoing. At the East Portal ramp, crews continue sheet piling and remove the utility corridor.

Rideau Station west entrance: Crews install rebar and mechanical works, and pour the concrete slab.

Rideau Station east entrance: Crews continue waterproofing and installing rebar for the station walls.

Traffic restrictions on Rideau Street remain in effect.
uOttawa Station: Crew construct walls, install rebar and pour concrete for the slab. Waterproofing and utility installations are ongoing.




East Stations

Lees Station: Crews excavate for utilities, install duct banks and continue caisson installation.

Hurdman Station: At the station, crews strip the grade beams and begin work on the concourse floor slab. At the bus operators’ building, crews continue masonry, electrical work and mobilize to install structural steel.




Tremblay Station: Structural steel installation, concrete pours, electrical installations and masonry work are ongoing.

St-Laurent Station: Crews continue grading, install masonry and construct the electrical room. Trackwork activities continue in the station with grouting.




Cyrville Station: The station continues to progress with structural steel and roof installations. Construction of the parapet walls is ongoing.

Blair Station: The station advances as crews construct the roof, continue formwork and install structural steel. Crews begin installing the station’s exterior wall panels.



Tunnel Excavation and Support

Excavation and reinforcements continue in the running tunnel west of Rideau Station.




Guideway

Bayview CPR Bridge to West Portal: Crews continue grading to prepare the guideway for future trackwork.

Mann Avenue Bridge to west of Lees Station: Crews finalize sewer work and install Overhead Catenary System (OCS) foundations during daytime and overnight.

Rideau River Transitway Bridge to east of Hurdman Station: Crews finalize the construction of the embankment and continue grading work in anticipation of trackwork activities in the next weeks.

East of Hurdman Station to west of Tremblay Station: Crews mobilize to begin installing tracks on this portion of the guideway.

West of Tremblay Station to Blair Station: Near Tremblay Station, crews continue welding and tamping as part of trackwork. In preparation for vehicle testing this fall, final trackwork, including surveying and switch installations, are ongoing between St-Laurent and Blair stations.




Other Activities

CPR Bridge near Bayview Station: Crews continue installing caissons and working on the bridge piers. During construction activities currently underway, and for the safety of all Bayview pathway users, short-term closures are required. Flaggers are onsite to assist users.

Booth Street Bridge: Crews complete final bridge works. In preparation for the reinstatement of Booth Street as early as September, work on the sidewalks and installation of lights poles occur.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Blasting at Parliament Station east entrance.
  • Mann Avenue Bridge replacement.
  • Deck work at Tremblay Station.
  • Watermain work near St-Laurent Station, along the guideway.
  • Traction Power Sub-System (TPSS) deliveries along the alignment.
  • Block wall construction at Blair Station.
  • Bus operators’ building construction and catch basin/landscaping work at Blair Station.

http://www.ligneconfederationline.ca/construction/construction-update-85/
     
     
  #3554  
Old Posted Aug 18, 2016, 3:38 AM
concrete06 concrete06 is offline
Registered User
 
Join Date: Aug 2006
Posts: 80
Tunney's Pasture station...

     
     
  #3555  
Old Posted Aug 18, 2016, 7:05 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by concrete06 View Post
Tunney's Pasture station...

That station was pasture time. Finally the god awful transitway design is gone.
     
     
  #3556  
Old Posted Aug 18, 2016, 8:03 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by concrete06 View Post
Tunney's Pasture station...

Similar vantage point of the finished station:

     
     
  #3557  
Old Posted Aug 19, 2016, 12:02 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,046
Quote:
Originally Posted by d_jeffrey View Post
That station was pasture time. Finally the god awful transitway design is gone.
To be replaced with a visually prettier design that will have the same human-environmental flaws as the ugly things they replaced.

Yay?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #3558  
Old Posted Aug 20, 2016, 2:59 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
Lumber floats at Lyon station

Matthew Pearson, Ottawa Citizen
Published on: August 19, 2016 | Last Updated: August 19, 2016 4:44 PM EDT




On a visit to the Glue Pot Pub one afternoon this week, I noticed a strange sight down in the deep hole where a future entrance to the Confederation LRT’s Lyon station will be: Water. And lots of it.

Stacks of lumber and other construction material appeared to be floating, while a single worker — standing on a makeshift raft made from a large piece of plywood — used a huge hose to suck the water up to a hydrovac truck parked above on street level.

It was the loudest vacuum I’d ever heard. The server said the sound was actually giving her a headache. But construction along this stretch, as Kelly Egan wrote earlier this summer, is responsible for lots of headaches.

I didn’t see any other workers in the hole that afternoon.

Given the record amounts of rain that had fallen over the previous weekend, perhaps water in the hole wasn’t surprising. But I asked the city for an explanation anyway.

Here is the written statement supplied by media relations and attributed to Steve Cripps, the director of the rail implementation office.

“Lyon Station experienced some water infiltration over the weekend due to a combination of heavy rainfall and existing ground water infiltration. Ottawa Light Rail Transit-Constructors (OLRT-C) used a hydrovac truck to remove the water from the Lyon West entrance to allow construction to continue. The water was removed in one day on Monday, August 15, 2016. This event does not affect the construction schedule and the weekend rainfall event has not constituted a delay to construction.

“This week, OLRT-C teams are working on the elevator shaft and, next week, will be backfilling and pouring slabs.”

Cripps’ response prompted me to ask a follow-up question about whether other LRT construction sites were also affected by the “combination of heavy rainfall and existing ground water infiltration.”

I just received this reply and the photo above of “water removal” at Pimisi station.

“Pooling water is a common occurrence in construction excavation due to rainfall and groundwater infiltration. All construction sites around Ottawa would likely have needed to remove water following last weekend’s rain event. The Confederation Line is no exception. RTG (OLRT-C) teams remove groundwater on sites as required and monitor water levels to ensure no unusual or unexpected activity occurs.”

http://ottawacitizen.com/news/local-news/city-hall-blog-lumber-floats-at-lyon-station
     
     
  #3559  
Old Posted Aug 20, 2016, 3:57 AM
SkeggsEggs SkeggsEggs is offline
Registered User
 
Join Date: May 2016
Posts: 406
Rocketphish there is a new update on the confederation site, I have no idea how to format it properly so here is the link!

http://www.ligneconfederationline.ca/construction/construction-update-86/
     
     
  #3560  
Old Posted Aug 20, 2016, 12:34 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
Quote:
Originally Posted by SkeggsEggs View Post
Rocketphish there is a new update on the confederation site, I have no idea how to format it properly so here is the link!

http://www.ligneconfederationline.ca/construction/construction-update-86/
Here you go!




Construction Update
Week of August 15


At Tunney’s Pasture Station, crews demolish existing structures as they make way for a new light rail transit station. At Blair Station – the O-Train Confederation Line’s easternmost station and future transit hub – construction is advancing as crews install the station’s exterior wall panels.



Demolition of existing structures at Tunney’s Pasture Station

West Stations


Tunney’s Pasture Station: Crews demolish existing structures.

Bayview Station: Crews finalize caisson installation and prepare to begin ground improvement activities. During construction activities currently underway, and for the safety of all Bayview pathway users, short-term closures are required. Flaggers are onsite to assist users.

Pimisi Station: Preliminary station work is ongoing; crews install duct banks along with formwork and rebar.



Waterproofing and work on walls in Rideau Station cavern

Central Stations


West Portal: Crocodile Rouge continues excavating the ramp at West Portal.

Lyon Station cavern: Crews work on the station concourse; activities include rebar installation and concrete pours. Station arch final lining pours are ongoing.

Lyon Station west entrance: Work on the station walls and mudslab is ongoing; crews install rebar and pour concrete.

Lyon Station east entrance: Crews install rebar and pour concrete for the station elevator and walls. Rock drilling occurs at the east vent shaft.

Parliament Station cavern: The station continues to take shape with formwork installation and concrete pours for the L-walls. Mechanical and electrical work also continues.

Parliament Station west entrance: Crews install rebar and pour concrete for the station roof. At street level, excavation and reinforcements occur and crews install reinforcements at the east vent shaft.

Parliament Station east entrance: Construction of the steel head house is finalized and crews install rebar and pour concrete for station stairs. At street level, crews remove sidewalks, excavate and install reinforcements.

Traffic restrictions on Queen and O’Connor streets remain in effect.

Rideau Station cavern: Crews work on walls, install rebar and waterproof the station arch and invert.



Concrete work at uOttawa Station

Rideau Station west entrance: Crews install rebar and formwork in anticipation of upcoming concrete pours.

Rideau Station east entrance: Crews waterproof, install rebar and dowels as part of work on the station walls.

Traffic restrictions on Rideau Street remain in effect.

East Portal: Piling activities continue and crews mobilize to begin excavating.

uOttawa Station: Crews install rebar, steel beams and work on station walls. Work on the concrete slab continues to facilitate the reopening of the pedestrian tunnel for August 22.



Crews work on the stairs and roof at Cyrville Station

East Stations


Lees Station: Crews continue installing duct banks, excavate for utilities and mobilize to work on the methane membrane.

Hurdman Station: At the station, crews continue working on the concourse slab and stripping grade beams. At the bus operators’ building, crews begin installing structural steel and continue electrical work.

Tremblay Station: Station work continues and includes structural steel installation, concrete pours, electrical work and masonry.



Work on the roof at Blair Station

St-Laurent Station: Grading, masonry and work on the electrical room are ongoing. Trackwork continues in the station.

Cyrville Station: Crews work on the station roof as well as the parapets. Crews also install formwork for the concourse level and construct the stairs leading to the platform.

Blair Station: The station continues to progress as crews work on the roof, finalize structural steel and install exterior wall panels. Crews construct the station block wall this week; an alternative route is available to pedestrians. Final landscaping work also occurs as crews mobilize at the end of the week to begin utility, curb and sidewalk construction.



Excavation and reinforcements in the running tunnel

Tunnel Excavation and Support


Excavation and installation of reinforcements are ongoing in the running tunnel west of Rideau Station.



Excavation for the traction power sub station on guideway near Tunney's Pasture Station

Guideway


Tunney’s Pasture Station to West Portal: Work continues along the guideway in anticipation of future trackwork; activities include grading and excavation for the traction power substation.

Mann Avenue Bridge to west of Lees Station: Crews continue installing OCS foundations.

Rideau River Transitway Bridge to Blair Station: Trackwork activities begin in sections west of Tremblay Station. Systems installation, final tamping and welding occurs from just east of Tremblay Station to Blair Station in anticipation of vehicle testing in the coming weeks.



Final Works on the Booth Street Bridge

Other Activities


CPR Bridge near Bayview Station: Crews finalize caisson installation and continue work on bridge piers. During construction activities currently underway, and for the safety of all Bayview pathway users, short-term closures are required. Flaggers are onsite to assist users.

Booth Street: Final works occur on Booth Street in anticipation of its reopening as early as September.

Mann Avenue Bridge: Reconstruction of the Mann Avenue Bridge commences; crews mobilize to begin installing caissons.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Line drilling and blasting at Parliament Station east entrance.
  • Deck work at Tremblay Station.
  • Watermain work near St-Laurent Station, along the guideway.
  • Vehicle testing along the guideway between Belfast Yard and Tremblay Station.
  • Traction power substation installations along the alignment.

http://www.ligneconfederationline.ca/construction/construction-update-86/
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.