HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Would you like to separate this thread for individual station projects?
Yes 19 31.15%
No 42 68.85%
Voters: 61. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #2021  
Old Posted Aug 16, 2016, 1:44 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,397
Metrotown station few days ago.





Reply With Quote
     
     
  #2022  
Old Posted Aug 16, 2016, 2:48 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 766
They've been single-tracking through Metrotown at night this week, and the station will be closed entirely for the weekend of August 27th-28th. I suspect some sort of major structural work (lifting the roof?) will happen during that time.
Reply With Quote
     
     
  #2023  
Old Posted Aug 16, 2016, 3:47 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by dpogue View Post
They've been single-tracking through Metrotown at night this week, and the station will be closed entirely for the weekend of August 27th-28th. I suspect some sort of major structural work (lifting the roof?) will happen during that time.
Shutting down Metrotown station for 2 full days?
Reply With Quote
     
     
  #2024  
Old Posted Aug 16, 2016, 3:49 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,397
They have been single-tracking several times for at least a month. Also the crane has been there for weeks, so not sure how quickly that will happen.

I cannot wait for this project to finish as the station is crowded at most times. The fliw of people is actually very interesting to watch but more space is seriously needed!

Are they extending the platform for longer trains in the future? I think they should with every station renovation on Expo Line. Having 8-train Mark I and 6-train Mark II trains would be amazing. One can dream.
Reply With Quote
     
     
  #2025  
Old Posted Aug 16, 2016, 4:00 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by Klazu View Post

Are they extending the platform for longer trains in the future?
I don't think the platform can be further extended without tearing down the new escalators being built at both ends of the platform.
In your 3rd picture in the last post, the sloped metal frame is the support structure for the new escalators at the new west station house.


Picture from Via-Architecture

Last edited by Waders; Aug 16, 2016 at 4:23 AM.
Reply With Quote
     
     
  #2026  
Old Posted Aug 16, 2016, 5:03 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by Waders View Post
Shutting down Metrotown station for 2 full days?
I was mistaken, it's not for 2 full days:

Quote:
August 26 From 11:00pm until the end of service Metrotown station will be closed. No train service between Patterson and Royal Oak stations. Train service frequency from Patterson westwards, and from Royal Oak eastwards, will be normal. Millennium Line trains will operate VCC-Clark – Royal Oak. Eastbound train service from Royal Oak will be extended to ensure that passengers catching the last trains from downtown Vancouver can connect to the bus at Patterson and then to the train at Royal Oak. Trains will operate later than normal at some stations. Shuttle buses will operate frequently between Patterson – Metrotown - Royal Oak stations. Allow 15-20 minutes extra travel time.

August 27 From midnight until the end of service Metrotown station will be closed. No train service between Patterson and Royal Oak stations. Train service frequency from Patterson westwards, and from Royal Oak eastwards, will be normal. Millennium Line trains will operate VCC-Clark – Royal Oak. Eastbound train service from Royal Oak will be extended to ensure that passengers catching the last trains from downtown Vancouver can connect to the bus at Patterson and then to the train at Royal Oak. Trains will operate later than normal at some stations. Shuttle buses will operate frequently between Patterson – Metrotown - Royal Oak stations. Allow 15-20 minutes extra travel time.

August 28 and 29 From 9:30pm until the end of service trains will single-track using the (westbound) platforms at Patterson and Metrotown stations (Patterson and Metrotown eastbound platforms closed). The Millennium Line will operate VCC-Clark – Columbia only. Allow 10-15 minutes extra travel time.
(from http://www.translink.ca/en/Schedules-and-Maps/Alerts.aspx?tab=0)
Reply With Quote
     
     
  #2027  
Old Posted Aug 16, 2016, 5:22 AM
Anorak Anorak is offline
Registered User
 
Join Date: Mar 2016
Posts: 115
Quote:
Originally Posted by Waders View Post
I don't think the platform can be further extended without tearing down the new escalators being built at both ends of the platform.
In your 3rd picture in the last post, the sloped metal frame is the support structure for the new escalators at the new west station house.


Picture from Via-Architecture
How long with the platform at Metrotown be then, after the expansions are complete?
Reply With Quote
     
     
  #2028  
Old Posted Aug 16, 2016, 6:09 AM
Sheba Sheba is online now
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,586
Quote:
Originally Posted by Anorak View Post
How long with the platform at Metrotown be then, after the expansions are complete?
The platform will be the same length. The current stationhouse will be much larger and will have a matching stationhouse at the other end of the platform. That combined with 3 elevators and stairs in the middle-ish of the platform will make for much better passenger circulation.
Reply With Quote
     
     
  #2029  
Old Posted Aug 16, 2016, 6:34 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by dpogue View Post
I was mistaken, it's not for 2 full days:


(from http://www.translink.ca/en/Schedules-and-Maps/Alerts.aspx?tab=0)
Sign of relief.

Looks like some important construction work is planned for that weekend. Heavy lifting of the roof truss?
Reply With Quote
     
     
  #2030  
Old Posted Aug 19, 2016, 3:57 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 766
From the Buzzer, An update on Metrotown Station upgrades:

Quote:
The loop trusses, which will be installed above the west stationhouse as the station’s structural roof, arrived in four separate pieces.

Crews have assembled them on the ground in two pieces. Once fully constructed, the loop truss will weigh approximately 120 tons (240,000lbs) and will be around 64.5 metres (212 feet) in length!

[...]

Construction crews will lift the loop truss, over two weekends: August 26-27 and September 9-10.

In order to lift the 120 ton structure into place, two cranes will be used – a 250 ton crane and a 500 ton crane.

And guess what? We’re going to have a video time lapse of the installation for you!
Reply With Quote
     
     
  #2031  
Old Posted Aug 19, 2016, 7:17 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
Reply With Quote
     
     
  #2032  
Old Posted Aug 19, 2016, 6:08 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,118
Quote:
Originally Posted by Klazu View Post
Are they extending the platform for longer trains in the future? I think they should with every station renovation on Expo Line. Having 8-train Mark I and 6-train Mark II trains would be amazing. One can dream.
Back in 2010 Translink released a report that said the majority of platforms are 80m long which can accomodate 5 car MK II configuration and that moving to a platform length (105m) that would accommodate 6 car (8 car MK-I) would be too costly and is not needed at this time.

The 5 car MKII/III configuration would only require 4 stations on the whole of Expo to require modest platform extension, Metrotown not being one of those to my understanding.

Basically 5 car Mark II is about the same length as a 5 car Mark III. But 6 car Mark I would be the max since they are 76m long.

They did reference plans in the long term to go through a major capital project to extend all platforms to 105 meters but we're talking 20+ years likely for that.
Reply With Quote
     
     
  #2033  
Old Posted Aug 21, 2016, 9:52 PM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
At Metrotown station, steel columns to support the 120 tons roof loop truss(bottom right of the picture) have been erected.

Picture taken by me through the dirty and reflective front window of a skytrain.
Reply With Quote
     
     
  #2034  
Old Posted Aug 22, 2016, 12:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Thanks!
I was expecting ordinary straight steel tubular columns (Like Broadway & Commercial)
Reply With Quote
     
     
  #2035  
Old Posted Aug 22, 2016, 12:39 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Bob Ransford asks what's being done at Richmond Brighouse Station?


https://twitter.com/BobRansford
Reply With Quote
     
     
  #2036  
Old Posted Aug 22, 2016, 2:50 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,388
so how many months behind schedule is this project already? Phase 1 is what 6 months behind?

GOOD WORK TRANSLINK! they have the best PM's money can buy .... NOT!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #2037  
Old Posted Aug 22, 2016, 3:17 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by hollywoodnorth View Post
so how many months behind schedule is this project already? Phase 1 is what 6 months behind?

GOOD WORK TRANSLINK! they have the best PM's money can buy .... NOT!
Good question. Looks like Translink has revised the schedule.

According to Translink's web site, both Centre stationhouse and West stationhouse construction will now be completed in Spring 2017.
East Stationhouse construction will be completed in Winter 2017/2018.

So the project is still on schedule.
Reply With Quote
     
     
  #2038  
Old Posted Aug 22, 2016, 3:25 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by officedweller View Post
Thanks!
I was expecting ordinary straight steel tubular columns (Like Broadway & Commercial)
Yeah, it looks quite 'bulky'. I like the the new support columns at Broadway/Commerical station better.
Hopefully some outer shell can be used to cover the steel beam to make it looks better and to protect it from the elements.
Reply With Quote
     
     
  #2039  
Old Posted Aug 22, 2016, 4:42 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,388
Quote:
Originally Posted by Waders View Post
Good question. Looks like Translink has revised the schedule.

According to Translink's web site, both Centre stationhouse and West stationhouse construction will now be completed in Spring 2017.
East Stationhouse construction will be completed in Winter 2017/2018.

So the project is still on schedule.
yup that's what they did with MAIN STREET SKYTRAIN also. they would keep updating the schedule .... must have been like 4 or 5 times. so they were "on schedule" such a sleazy and douchey way to do it. but I expect no less. Who ever manages these projects for Translink are some of the stupidest and most mindless people I have ever encountered. I talked to them a few times on the phone calling into ask WTF was going on but was told "we are still on target" "we are still on schedule" etc etc etc. bullshit upon bullshit upon bullshit. I know they read this forum ... would love for someone from Translink to post here and explain their retardation.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #2040  
Old Posted Aug 22, 2016, 5:30 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Would it be a transportation project in BC if it wasn't "on time and on schedule"?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:30 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.