Quote:
Originally Posted by Hallsy's Toupee
|
Yah they dug out both approaches and are now starting to replace the dirt and mechanically stabilized earth (MSE) walls which were there. Not really sure the why, two probables, too high bentonite in the soil, which would cause heaving problems, or soil not strong enough so it wouldn't resist deformation from loads or be able to hold the MSE in place.
As for October, it is looking more and more likely, most of the newer bridges (Yellowhead over rail tracks, AHD over the rail tracks, Yellowhead/AHD flyovers) mostly have their decks poured. So it is a matter of finishing up the approaches, guardrails, signs, lighting and landscaping.
Broadmoor Boulevard bridge is almost ready to open, perhaps in a week or 2 this would greatly help the morning rush hour problem of people trying to get into the industrial area north of Yellowhead.
PS: Hallsy's ... love the handle