Quote:
Originally Posted by SecretAgentMan
I have to agree. This is more a benefit to a future rail investment than a hindrance. The additional ridership potential far outweighs the challenge to available ROW. The Guadalupe ROW is fairly wide, and there are two of them. The northbound and center turn lanes could be used for the trackway and station within the existing curb lines by rerouting the northbound lanes to Old Guadalupe between the complex and the Intramural Fields. A roundabout at Guadalupe and 51st would ensure it would be nothing more than a minor inconvenience to traffic. A second roundabout at the tip of the triangle, where Guadalupe and Lamar merge, might even improve the tangled mess that exists today. The signal at Lamar and 51st would need to stay to allow the rail to transition from center to side running and to allow traffic to cross the tracks.
|
You're more optimistic than I am. Perhaps, but that just seems awfully heavy traffic volumes for (American) drivers to use a roundabout.
Edit: Anyway, anything further should probably be on the Transportation thread. It's fuzzy, any update has a transportation component to discuss.