HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #4381  
Old Posted Jul 5, 2016, 11:16 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
View from the top row.

Reply With Quote
     
     
  #4382  
Old Posted Jul 6, 2016, 2:10 AM
micheal micheal is offline
Registered User
 
Join Date: Nov 2011
Posts: 415
Wow! You gonna feel like your on top of the field from the top.
Reply With Quote
     
     
  #4383  
Old Posted Jul 6, 2016, 3:18 AM
BrannyMuffin BrannyMuffin is offline
Registered User
 
Join Date: Aug 2006
Location: Regina
Posts: 970
http://leaderpost.com/news/local-news/ci...hriders-game-day-transit-for-2017-season

They're going to be expanding transit service to games next year. Highlights of the article:
-starting service 45 minutes earlier (so 2 hours 15 minutes before game time)
-adding another pickup/drop off location downtown
-free service (currently $3 each way)
-you can get on at a non-designated stop (or Paratransit) for free by showing the driver your ticket

The downtown stop should be good for people staying in hotels downtown and great for businesses
Reply With Quote
     
     
  #4384  
Old Posted Jul 7, 2016, 5:37 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
RRI says the Field Turf goes in next week. They Tweeted this:



It looks like the logos will be sewn in after the turf is laid.
Reply With Quote
     
     
  #4385  
Old Posted Jul 8, 2016, 3:13 AM
Batcow Batcow is offline
Registered User
 
Join Date: Mar 2016
Location: Regina
Posts: 67
Quote:
Originally Posted by Stormer View Post
RRI says the Field Turf goes in next week. They Tweeted this:



It looks like the logos will be sewn in after the turf is laid.
Sewn in does not mean it comes like that. You can watch installations where they set up the field, set up the markings and then sew them in.
Reply With Quote
     
     
  #4386  
Old Posted Jul 11, 2016, 5:09 PM
Batcow Batcow is offline
Registered User
 
Join Date: Mar 2016
Location: Regina
Posts: 67
The screen in the Northeast corner means that the other side is a large blank wall. I wonder if anything would be hung there? For example, Grey Cup banners or retired numbers.

Another question. Where would the TV cameras be set up in the stadium?

Final question. At night you can use the east construction camera to look through the glass and into the lit up club area. Does substantial completion not also mean that area is being finished? Besides the pillars and staircase, there isn't much going on in there.

Thanks
Reply With Quote
     
     
  #4387  
Old Posted Jul 11, 2016, 7:42 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
It appears that there are stairs to access each level in the south party deck.



https://twitter.com/ReginaRev
Reply With Quote
     
     
  #4388  
Old Posted Jul 12, 2016, 3:08 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Turf has arrived!


https://twitter.com/ReginaRev
Reply With Quote
     
     
  #4389  
Old Posted Jul 12, 2016, 9:25 PM
WoodlandCritter WoodlandCritter is offline
Registered User
 
Join Date: Apr 2010
Posts: 345
I did not expect that "party deck" area to be like that. I was expecting more of a "standing area" found in most European Football Stadiums. I don't know how I feel about those stairs accessing each deck level, to me they are aesthetically unappealing (from that photo at least). But I will reserve final judgement until that whole area is complete.

This is the type of standing area I am refering to:

Source: http://www.stadionwelt.de/

Or even this type of safe standing/seating area which is being placed in some stadiums now:

https://en.wikipedia.org/wiki/Safe_standing

Overall this stadium is looking good. Can't wait to see a game there.

Last edited by WoodlandCritter; Jul 12, 2016 at 9:35 PM.
Reply With Quote
     
     
  #4390  
Old Posted Jul 12, 2016, 9:33 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Quote:
Originally Posted by WoodlandCritter View Post
I did not expect that "party deck" area to be like that. I was expecting more of a "safe standing area" found in most European Football Stadiums. I don't know how I feel about those stairs accessing each deck level, to me they are aesthetically unappealing (from that photo at least). But I will reserve final judgement until that whole area is complete.

This is the type of standing area I am refering to:

Source: http://www.stadionwelt.de/

Or even this type of standing/sitting area which is being placed in some stadiums now:

[[

Overall this stadium is looking good. Can't wait to see a game there.
The top (main concourse level) could be a true party deck. the tiers will be similar to the photo, but there will actual drink rails.
Reply With Quote
     
     
  #4391  
Old Posted Jul 12, 2016, 9:38 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
It seems there are weird codes around those types of things in Canada. Well at least local to Winnipeg. Some issues with having large, stepped areas like that with no railings. Maybe not so in Saskatchewan.

At CMHR, they have something similar outdoors. They have these silly railing and steps on the side so you can walk up there "safely" Piss off already. My biggest pet peeve is the coddling..
Reply With Quote
     
     
  #4392  
Old Posted Jul 12, 2016, 10:04 PM
Festivus Festivus is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
Quote:
Originally Posted by bomberjet View Post
It seems there are weird codes around those types of things in Canada. Well at least local to Winnipeg. Some issues with having large, stepped areas like that with no railings. Maybe not so in Saskatchewan.

At CMHR, they have something similar outdoors. They have these silly railing and steps on the side so you can walk up there "safely" Piss off already. My biggest pet peeve is the coddling..
I'd agree in general for 6-inch incremental steps, but in Regina's case each level appears to be around 6-8 feet in height...so you definitely need rails on the fronts.
Reply With Quote
     
     
  #4393  
Old Posted Jul 12, 2016, 10:07 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
It appears that the turf is in 5 yard wide rolls with the yard line sewn in on one end:



credit:City of Regina

According to Field Turf, it only takes 3 days to unroll the rolls, so we should have a full field, ready for sewing, by the weekend.
Reply With Quote
     
     
  #4394  
Old Posted Jul 12, 2016, 11:19 PM
WoodlandCritter WoodlandCritter is offline
Registered User
 
Join Date: Apr 2010
Posts: 345
Quote:
Originally Posted by Festivus View Post
I'd agree in general for 6-inch incremental steps, but in Regina's case each level appears to be around 6-8 feet in height...so you definitely need rails on the fronts.
Right, there is definitely codes that will require that, I just assumed maybe those initial "steps" were going to have more levels within each?

Seems like by having only a few tiers they have limited how many people can actually be in that section at a time. I mean there is only so much rail room to stand against. Unless there is going to be a raised seating platform (w/ lounge/bar tables) against the walls on each level? I dunno
Reply With Quote
     
     
  #4395  
Old Posted Jul 12, 2016, 11:19 PM
Batcow Batcow is offline
Registered User
 
Join Date: Mar 2016
Location: Regina
Posts: 67
Quote:
Originally Posted by Stormer View Post
It appears that the turf is in 5 yard wide rolls with the yard line sewn in on one end:



credit:City of Regina

According to Field Turf, it only takes 3 days to unroll the rolls, so we should have a full field, ready for sewing, by the weekend.
Yeah the lines are already on the rolls. After everything is laid out, they will bring out numbers and those lines... um hash marks? and any other markings. Once they are measured and laid out, they have a machine that sews them into the turf.

I can't wait to see it! Hopefully that new OxBlue camera on the roof, showing the field, is online soon. The East one is "completed" and not showing anything new.
Reply With Quote
     
     
  #4396  
Old Posted Jul 13, 2016, 12:40 AM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
To me, it is not the stairs leading down to the standing areas that is aesthetically unappealing, but the ugly concrete walls. Hopefully they cover those walls with something such as tiles, or even paint, that can be cleaned of any graffiti and grime (vomit, spilled drinks, etc). I would assume the railings will have a kick plate to prevent someone from kicking things such as partially-filled drink cups onto the people, or end zone, below.
Reply With Quote
     
     
  #4397  
Old Posted Jul 13, 2016, 1:05 AM
WoodlandCritter WoodlandCritter is offline
Registered User
 
Join Date: Apr 2010
Posts: 345
Quote:
Originally Posted by Draftsman View Post
To me, it is not the stairs leading down to the standing areas that is aesthetically unappealing, but the ugly concrete walls. Hopefully they cover those walls with something such as tiles, or even paint, that can be cleaned of any graffiti and grime (vomit, spilled drinks, etc). I would assume the railings will have a kick plate to prevent someone from kicking things such as partially-filled drink cups onto the people, or end zone, below.
I agree with you on that as well. I'm sure they will come up with something to make it more presentable. It is a section that definitely stands out (no pun intended) as something different so I hope it looks good when finally complete.
Reply With Quote
     
     
  #4398  
Old Posted Jul 13, 2016, 1:15 AM
Davidson Davidson is offline
Registered User
 
Join Date: Mar 2012
Location: Highway 11
Posts: 111
Quote:
Originally Posted by Stormer View Post
It appears that the turf is in 5 yard wide rolls with the yard line sewn in on one end:



credit:City of Regina

According to Field Turf, it only takes 3 days to unroll the rolls, so we should have a full field, ready for sewing, by the weekend.
So does sewn-in lines, numbers, logs, etc preclude NMS from ever hosting a FIFA-sanctioned soccer match? I'm pretty sure FIFA regs require all non-soccer markings to be removed. Or perhaps a grass field could be over-layers on top of the field turf?

When IGF in Winnipeg hosted the women's World Cup last summer, did they have the football markings removed?
__________________
Life is a Highway (11)
Reply With Quote
     
     
  #4399  
Old Posted Jul 13, 2016, 2:15 AM
HomerSPC's Avatar
HomerSPC HomerSPC is offline
Registered User
 
Join Date: Apr 2014
Location: Regina, Sk
Posts: 459
Quote:
Originally Posted by Davidson View Post
So does sewn-in lines, numbers, logs, etc preclude NMS from ever hosting a FIFA-sanctioned soccer match?
Yep. We'll never host an international soccer match with this turf.
Reply With Quote
     
     
  #4400  
Old Posted Jul 13, 2016, 2:18 AM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,989
Quote:
Originally Posted by Davidson View Post
So does sewn-in lines, numbers, logs, etc preclude NMS from ever hosting a FIFA-sanctioned soccer match? I'm pretty sure FIFA regs require all non-soccer markings to be removed. Or perhaps a grass field could be over-layers on top of the field turf?

When IGF in Winnipeg hosted the women's World Cup last summer, did they have the football markings removed?
Yup. Screwed for FIFA international matches. Would have to replace the turf.

At IGF they scrubbed off the lines. Some were faintly visible
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:39 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.