HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #481  
Old Posted Apr 27, 2016, 3:16 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Stage 2 alignment improvements staff report
http://app05.ottawa.ca/sirepub/item.aspx?itemid=345825
Reply With Quote
     
     
  #482  
Old Posted Apr 27, 2016, 3:22 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,019
Quote:
Originally Posted by roger1818 View Post
First of all, I take these preliminary sketches with a grain of salt as there is a lot of artistic license used to make the picture look pretty. Having said that I do consider an exterior walkway or path to be a connection. There is lots of time for common sense to prevail and for the long looping cow paths to be straightened.
We are now 24 months away from the in-service of the LRT system.

We can haz updated renderings?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #483  
Old Posted Apr 27, 2016, 3:23 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,019
Quote:
Originally Posted by waterloowarrior View Post
Stage 2 alignment improvements staff report
http://app05.ottawa.ca/sirepub/item.aspx?itemid=345825
I couldn't find the word "Jasmine" in there.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #484  
Old Posted Apr 27, 2016, 3:38 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by Uhuniau View Post
I couldn't find the word "Jasmine" in there.
Page 12:
Quote:
The improved alignment would also protect for a future Gloucester High School station. While not planned as part of Stage 2, interest in this potential future station was identified through the EA process. This station would be located farther east than was contemplated in the EA and located in the median rather than on the north side of the Ottawa Road 174.
Reply With Quote
     
     
  #485  
Old Posted Apr 27, 2016, 4:22 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by McC View Post
Page 12:
The improved alignment would also protect for a future Gloucester High School station. While not planned as part of Stage 2, interest in this potential future station was identified through the EA process. This station would be located farther east than was contemplated in the EA and located in the median rather than on the north side of the Ottawa Road 174.
In other words the station would be closer to Jasmine than was contemplated before...likely behind the 2000/2020 Jasmine buildings.
Reply With Quote
     
     
  #486  
Old Posted Apr 27, 2016, 5:43 PM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
I'm happy that Jasmine is included in the long term planning but what will it take to have it included as part of phase 2?

It's like the city doesn't learn from past mistakes. They skipped Gladstone & Wakley when they built the first O-Train line and 20 years later they're still just "planned" stations.
Reply With Quote
     
     
  #487  
Old Posted Apr 27, 2016, 6:08 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,763
Quote:
Originally Posted by Capital Shaun View Post
I'm happy that Jasmine is included in the long term planning but what will it take to have it included as part of phase 2?

It's like the city doesn't learn from past mistakes. They skipped Gladstone & Wakley when they built the first O-Train line and 20 years later they're still just "planned" stations.
The delay was deliberate because they felt that everybody would be switching to the Trillium Line during the Confederation Line construction period and they feared that the route would be overwhelmed with passengers. Of course, that didn't happen and anybody living in the south end would have expected that.

In general, delayed stations don't tend to get built for a very long time, if ever. I would be going after the special infrastructure money to get it built right away.
Reply With Quote
     
     
  #488  
Old Posted May 3, 2016, 12:58 AM
RTWAP's Avatar
RTWAP RTWAP is offline
Registered User
 
Join Date: Oct 2009
Posts: 528
Quote:
Originally Posted by zzptichka View Post
Doesn't look like there is much planned on the ground level so far...
Why would Cleary need two large ground level concourses, one at each end of the station? 95% of the traffic would come from the Richmond side, not pedestrians along the parkway.

And why would the ground-level station need to be at the end of the platform in that case. If they moved it east a bit, and either removed the other concourse or if they need it for redundancy then shrink it to a minimal size then they would end up with something like this.



Where the red box shows space dedicated to ground level access, and the purple box shows space that could be dedicated to retail. If you shrink the parking a bit then that leaves more retail space than was there before.

Oh yah, and I connected the two concourses at ground level with a glassy walkway on the assumption that the second concourse was for safety and redundancy. If the escalators break on the west side then people would go up to the right concourse ... and then go where?
Reply With Quote
     
     
  #489  
Old Posted Jun 3, 2016, 2:03 PM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
The Transit Project Assessment Process (TPAP; prescribed in Ontario Regulation 231/08) for the WLRT will be completed in Sept 2016.

As part of the TPAP, the draft Environmental Project Report is now available: http://ottawa.ca/en/city-hall/public-consultations/transit/notice-commencement

Also, is it possible to change the title of this thread to include Bayshore as the other terminus?
Reply With Quote
     
     
  #490  
Old Posted Jun 15, 2016, 5:33 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
the kids these days, no respect for their grandparents' urban planning.
pinecrest-renewal.squarespace.com

I just wish the video paused after each swooping pan of the flythrough for a moment to update us like: "okay, now we're looking down [Carling], which looks like [this] today, and where in the future we imagine [this....]" <whizz> <bang><lasersounds> etc.

(might be better if I had working sound on this system)
Reply With Quote
     
     
  #491  
Old Posted Jun 15, 2016, 6:27 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by McC View Post
the kids these days, no respect for their grandparents' urban planning.
pinecrest-renewal.squarespace.com

I just wish the video paused after each swooping pan of the flythrough for a moment to update us like: "okay, now we're looking down [Carling], which looks like [this] today, and where in the future we imagine [this....]" <whizz> <bang><lasersounds> etc.

(might be better if I had working sound on this system)
Interesting. A bit pie in the sky. Also, I am not sure the NCC will want to remove the parkway because of the LRT. Overall it looks cool though.

As for audio, you didn't miss anything, just your typical background music this type of animation typically has.
Reply With Quote
     
     
  #492  
Old Posted Jun 15, 2016, 6:37 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Too bad there's no narration. I got totally disoriented by the middle of the video, and I was very surprised seeing the overhead shot at the end and discovering that stuff I thought was at one end of the site was at the other end completely.
Reply With Quote
     
     
  #493  
Old Posted Jun 15, 2016, 6:59 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by McC View Post
Too bad there's no narration. I got totally disoriented by the middle of the video, and I was very surprised seeing the overhead shot at the end and discovering that stuff I thought was at one end of the site was at the other end completely.
I found the same thing. It was hard to get your bearings.
Reply With Quote
     
     
  #494  
Old Posted Jun 15, 2016, 7:51 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,019
Quote:
Originally Posted by McC View Post
the kids these days, no respect for their grandparents' urban planning.
pinecrest-renewal.squarespace.com

I just wish the video paused after each swooping pan of the flythrough for a moment to update us like: "okay, now we're looking down [Carling], which looks like [this] today, and where in the future we imagine [this....]" <whizz> <bang><lasersounds> etc.

(might be better if I had working sound on this system)

Dear lord, that fantasy architecture looks like an animated version of every horrible piece of 1970s urban renewal in Ottawa, Toronto, and Calgary combined, including the crap that didn't get built.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #495  
Old Posted Jun 15, 2016, 7:52 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,019
Quote:
Originally Posted by roger1818 View Post
I found the same thing. It was hard to get your bearings.
Yet another reason why Carleton's architecture skool scares me.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #496  
Old Posted Jun 17, 2016, 12:09 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day all.... First Post, but I have ghosted here many years. I have not commented before,because most of what I had to say was well covered by others. BUT......This one I just had to get out here. Has anyone else examined the Western LRT Expansion TPAP documents from City of Ottawa's Transit subwebsite ? The diagrams in detail of several of the stations have an interesting dimension - platforms at 90 meters, protected future expansion 10 meters. !! !! I did not know they had furthur reduced the sizings !?! Of interest, neither of the TPAPs on City of Ottawa Transit subwebsite for the Eastern LRT Expansion nor the Trillium Line Expansion have the plans or details attached - you were only able to inspect them live in person manually - not online. (Paranoid interlude - did someone at City of Ottawa slip up by attaching the Western plans ?) Any one else, please tell me I have misspoken or misstepped - please ! And yes, I do know that these are preliminary and subject to modification - I HOPE ! But recall that the platforms went from 180 to 150 to 120 to ....... ? more cost cutting ?
Thanks... more rants to come.
Reply With Quote
     
     
  #497  
Old Posted Jun 17, 2016, 12:27 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,741
Quote:
Originally Posted by PHrenetic View Post
Good Day all.... First Post, but I have ghosted here many years. I have not commented before,because most of what I had to say was well covered by others. BUT......This one I just had to get out here. Has anyone else examined the Western LRT Expansion TPAP documents from City of Ottawa's Transit subwebsite ? The diagrams in detail of several of the stations have an interesting dimension - platforms at 90 meters, protected future expansion 10 meters. !! !! I did not know they had furthur reduced the sizings !?! Of interest, neither of the TPAPs on City of Ottawa Transit subwebsite for the Eastern LRT Expansion nor the Trillium Line Expansion have the plans or details attached - you were only able to inspect them live in person manually - not online. (Paranoid interlude - did someone at City of Ottawa slip up by attaching the Western plans ?) Any one else, please tell me I have misspoken or misstepped - please ! And yes, I do know that these are preliminary and subject to modification - I HOPE ! But recall that the platforms went from 180 to 150 to 120 to ....... ? more cost cutting ?
Thanks... more rants to come.
First off;

WELCOME TO SSP!!!!

Would you happen to have a link to this document? I don't think I've seen it.

Yes, the platforms were reduced significantly, from 180 to 150 to 120 to 90, as you've mentioned. In phase I, platforms are 90 meters, with possibility of expanding to 120 when necessary. The 3 downtown subway platforms are fully built at 120 meters right off the bat, since expanding platforms of such complex stations (mined out stations, deep underground with multi level concourses) can be exorbitantly expensive. I assume stations under Richmond Road and Algonquin might be simpler to expand later on since they will be of much simpler construction.

With the full 120 meter build out and 2 minute frequency, we will be able to easily reach a capacity of 24,000 phpd downtown, a little over double the current capacity. That's also just about the same capacity as the downtown portion of the Vancouver Skytrain.
Reply With Quote
     
     
  #498  
Old Posted Jun 17, 2016, 12:59 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by J.OT13 View Post
First off;

WELCOME TO SSP!!!!

Would you happen to have a link to this document? I don't think I've seen it.

Yes, the platforms were reduced significantly, from 180 to 150 to 120 to 90, as you've mentioned. In phase I, platforms are 90 meters, with possibility of expanding to 120 when necessary. The 3 downtown subway platforms are fully built at 120 meters right off the bat, since expanding platforms of such complex stations (mined out stations, deep underground with multi level concourses) can be exorbitantly expensive. I assume stations under Richmond Road and Algonquin might be simpler to expand later on since they will be of much simpler construction.

With the full 120 meter build out and 2 minute frequency, we will be able to easily reach a capacity of 24,000 phpd downtown, a little over double the current capacity. That's also just about the same capacity as the downtown portion of the Vancouver Skytrain.
Yo. Public link to City of Ottawa Transit subwebsite :
http://ottawa.ca/en/city-hall/public-consultations/transit/notice-commencement
You will probably have to download the document - they seem to have newly altered the way they do this. Peculiar, but.....there it is.

And, yes, I am aware of the first construction platform sizes; I was referring to the protection for future expansion - only 10 meters. And this is especially visible/critical in the Cleary station, where there just simply appears to be NO room for 120 total in future - only 100 . ie- a final future max size of only 100 ? .vs. many of the Phase 1 stations protected for a final future of, as you note - 120. There seems to be a disconnect between final future sizes here.

Thanks.
Reply With Quote
     
     
  #499  
Old Posted Jun 17, 2016, 1:42 AM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
The 90m station is long enough for 2-car trains, but the confusing thing about the 120m stations is that they won't be long enough to accommodate 3-car trains. They could maybe add a section to the 4-section consists, but as far as I know, they are already the longest manufactured by Alstom, so I don't know if there are any restrictions to further lengthening.
Reply With Quote
     
     
  #500  
Old Posted Jun 17, 2016, 2:06 AM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,362


Doubt we can fully fill two of these cars joined together, running every 2 minutes, any time soon.
Anyway it would be a good problem to have.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:29 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.