Old Posted Apr 18, 2016, 7:06 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Strolled by a few minutes ago. Seems like most of the equipment remains parked in similar location to what the cam showed from yesterday. There were two cement trucks on site, doing something by the church. Maybe finishing off the caissons they were drilling last week.
Reply With Quote
     
     
  #1522  
Old Posted Apr 18, 2016, 7:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Cam is functioning again.
Reply With Quote
     
     
  #1523  
Old Posted Apr 26, 2016, 3:13 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Needed a a progress pic update fix..much activity and speed..lol..

8:27am April.26.2016

image courtesy: TNS / Longboat

Last edited by Cyro; Apr 27, 2016 at 8:18 PM.
Reply With Quote
     
     
  #1524  
Old Posted Apr 26, 2016, 3:27 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Ooh, wow. Excavation is nearly complete.
Reply With Quote
     
     
  #1525  
Old Posted Apr 26, 2016, 3:37 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
^ Wagers on where the foundation for the crane will be placed? Yeah, offical, ( what were building annoucement) came at the end of Feb..
Reply With Quote
     
     
  #1526  
Old Posted Apr 26, 2016, 3:40 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
I'm thinking if they're putting up one tower crane, it would go in the centre of plaza area. So between the two towers so it could presumably build both of them. If they're going to put up two tower cranes, I would assume they'll both go right at the edge of their respective towers. I guess it goes back to the uncertainty with the residential component.

Based on the large area of the site, I'm guessing they'll have at least one each of a crawler crane and tower crane on site.
Reply With Quote
     
     
  #1527  
Old Posted Apr 27, 2016, 4:27 AM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
I want to see this development finished; I am impatient.
Reply With Quote
     
     
  #1528  
Old Posted Apr 27, 2016, 7:27 AM
LilZebra LilZebra is offline
Orig. frm Alpha Pectaurus
 
Join Date: Nov 2004
Location: Assiniboia, Man.
Posts: 2,873
Are they building Tower 1 and 2 at the same time?
__________________
Buh-bye
Reply With Quote
     
     
  #1529  
Old Posted Apr 27, 2016, 1:22 PM
TimeFadesAway TimeFadesAway is offline
Registered User
 
Join Date: Apr 2015
Posts: 769
Quote:
Originally Posted by jimj_wpg View Post
Are they building Tower 1 and 2 at the same time?
From what I recall, only Tower 1 is actually being built right away. I think what is happening is that the foundation for Tower 2 is being built as well as the parking that will extend under both towers. This will allow TN to complete the square and release the public monies attached to the square. Then Tower 2 can be built at a later date without too much disruption around it.
Reply With Quote
     
     
  #1530  
Old Posted Apr 27, 2016, 2:11 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Yeah parkade stretches the entire site. Tower 2 is a bit of a mystery, but they had said it would be ready in 2019. Tower 2 is also taller. Based on that it would seem they would both need to be U/C at the same time. But there have been no condo presales announced or anything. We're all left hanging.
Reply With Quote
     
     
  #1531  
Old Posted Apr 27, 2016, 2:12 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Also looks like the red crane is in the process of having an extension added to it's boom. Woo hoo. I noticed they had dropped off another section yesterday. I would assume that means it'll be around the site for a while. Going back to the tower crane comments,
Reply With Quote
     
     
  #1532  
Old Posted Apr 27, 2016, 3:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Lots of caisson drilling going on. Now 4 drill rigs on site. One of those box drill rigs for testing is gone too. Red crane is tall now, well taller anyways.
Reply With Quote
     
     
  #1533  
Old Posted Apr 27, 2016, 8:16 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by bomberjet View Post
I'm thinking if they're putting up one tower crane, it would go in the centre of plaza area. So between the two towers so it could presumably build both of them. If they're going to put up two tower cranes, I would assume they'll both go right at the edge of their respective towers. I guess it goes back to the uncertainty with the residential component.

Based on the large area of the site, I'm guessing they'll have at least one each of a crawler crane and tower crane on site.
Quote:
Originally Posted by Cyro View Post
Sounds like a good assesment...I'll take that wager..



..
Reply With Quote
     
     
  #1534  
Old Posted Apr 27, 2016, 9:43 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,794
Quote:
Originally Posted by bomberjet View Post
Also looks like the red crane is in the process of having an extension added to it's boom. Woo hoo. I noticed they had dropped off another section yesterday. I would assume that means it'll be around the site for a while. Going back to the tower crane comments,

And they were taking one out of it today and swinging it to where all the other stuff is when I looked out my window around lunch. Later in the after noon the section is gone, I don't know if was trucked out or put back in the red one later.
Reply With Quote
     
     
  #1535  
Old Posted Apr 28, 2016, 11:39 AM
factis factis is offline
Registered User
 
Join Date: Mar 2013
Location: Winnipeg, MB
Posts: 119
Didn't realize the shafts on those rigs could telescope. They're very tall, so I assumed they could only drill as deep as they are tall. Apparently they can go much deeper.

https://m.youtube.com/watch?v=P2MTcNY_Hfg
Reply With Quote
     
     
  #1536  
Old Posted Apr 29, 2016, 3:29 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
So we were all kind of wondering about the church lot. Comparing the renders and that above image, it looks like the grass/park will go above the church's existing parking lot, and that zig zag will be the ramp/sidewalk up it to connect to the skywalk level.
Reply With Quote
     
     
  #1537  
Old Posted May 5, 2016, 4:15 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,184
Looking at the construction cam this AM, and it brought a thought to mind. I wonder if tower 2 podium will be constructed, and depending on what happens with the residential, leave the tower as future. A main part of the marketing for TNS is skywalk connectivity. So they could build tower 1 and podium for tower 2. Skywalk linking all together with Sutton place and RBCCC. Then the dreaded future tower could be built whenever.
Reply With Quote
     
     
  #1538  
Old Posted May 5, 2016, 7:01 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
They've announced a completion date for tower II in 2019 multiple times, would be strange if they didn't proceed with that schedule at this point.
Either way, can any one here talk to Scott Brown? Never met him personally..
Reply With Quote
     
     
  #1539  
Old Posted May 5, 2016, 11:31 PM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
Quote:
Originally Posted by bomberjet View Post
Looking at the construction cam this AM, and it brought a thought to mind. I wonder if tower 2 podium will be constructed, and depending on what happens with the residential, leave the tower as future. A main part of the marketing for TNS is skywalk connectivity. So they could build tower 1 and podium for tower 2. Skywalk linking all together with Sutton place and RBCCC. Then the dreaded future tower could be built whenever.
How could they have people using the walkway between a tower crane and the building of a tower? That's not really safe.
Reply With Quote
     
     
  #1540  
Old Posted May 6, 2016, 1:44 AM
cheswick's Avatar
cheswick cheswick is offline
Registered User
 
Join Date: Nov 2010
Location: South Kildonan
Posts: 2,989
Quote:
Originally Posted by robertocarlos View Post
How could they have people using the walkway between a tower crane and the building of a tower? That's not really safe.
I believe you're misunderstanding what he was saying. He's saying maybe they're just building the podium of tower two to facilitate the skywalk system. And in a decade or two or three build the tower on top of the podium.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:09 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.