HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted May 5, 2016, 1:15 PM
niwell's Avatar
niwell niwell is offline
sick transit, gloria
 
Join Date: Nov 2004
Location: Roncesvalles, Toronto
Posts: 11,636
^And full subway stations cost significantly more than the underground stations being built would. Tunneling at a slightly smaller diameter would have minimal cost differences once you get going. The design of the Scarborough section hasn't been fully completed and rumour has it may be modified for some areas of grade separation. I'm sure you knew all of this though.
__________________
Check out my pics of Johannesburg
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 11:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.