There are a lot of things happening in Southeast Atlanta all of these things below are within a mile of my house in North Ormewood Park that I have been meaning to provide updates on:
Glenwood Place / 800 Glenwood
Overview: 216 apartments & 142k sf of retail including Kroger, Chick-fil-a, Starbucks, Waffle house
Status: Nearing completion, openings supposedly starting in the next month
842 Berne Street
Overview: 220 Apartments
Status: Permitting. Just received approval from the NPU / neighborhood.
Glencastle / Atlanta Stockade
Overview: 236 apartments / condos, 23 townhomes, 102k sf office, 25k sf commercial / restaurant
Status: Permitting. Just received approval from the NPU / neighborhood.
905 Memorial / "Leggett & Platt site"
Overview: ~700 residential units, Sprouts Farmers Market, 8 screen Cinebistro, 60k sf office, 40k sf additional retail
Status: Planning. Initial site plans look like they will be complying with the main neighborhood request of restoring the street grid. Completing "development of regional impact" requirements.
Alexan EAV
Overview: 120 apartments
Status: All but complete. TVs are on in the lobby. I assume move-ins will start any day.
Atlanta Dairies
Overview: "An indoor music venue, bowling alley, small retailers, a bar and a 24-hour diner would be part of the mix, too, with office space and 300 apartments"
Status: Under Construction. Appears site preparation / "cleaning out" the historic structures is about complete.
841 Memorial
Overview: 80 apartments
Status: Under Construction. Appears to have "topped out".
930 Mauldin St
Overview: 143 apartments
Overview: Planning. RCIL has concerns about height setting a precedent.
Beltline Extension
Overview: Connecting Eastside trail down to Kirkwood Ave then Memorial.
Status: Construction begins this month
Beltline Bill Kennedy Way Bridge
Overview: Getting the Beltline across I-20
Status: Planning. Initial designs to discussed with neighbors next week.
Beltline Southside Trail
Overview: Connecting Beltline from Glenwood Ave to Westside Trail (Adair Park)
Status: Acquiring ROW from CSX. Design to start later this year.
More may be in the pipeline too.
This does not include some larger projects in the area that are further away from me such as
Turner Field and
other activity further down Memorial Drive. Nor does it include the many smaller projects going on (for example, of the 8 homes immediately next to me, 4 are in process of some major renovation / or being entirely rebuilt).