HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #3161  
Old Posted Apr 20, 2016, 11:46 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Transitway transformation: Nightmare on Nicholas Street

Matthew Pearson, Ottawa Citizen
Published on: April 20, 2016 | Last Updated: April 20, 2016 5:27 PM EDT


An already clogged stretch of Nicholas Street between Highway 417 and Laurier Avenue could get considerably worse once the city closes a key Transitway station at the University of Ottawa on Sunday, rerouting hundreds of buses a day onto Nicholas and reducing cars coming off the highway to just a single lane.

It’s a big step forward in the construction of the $2.1-billion Confederation LRT line, now entering its fourth year. But it could come at a heavy price for motorists stuck in gridlock traffic.

The changes, outlined Wednesday at a city hall technical briefing, will allow for the closure of the Transitway between Lees and Campus stations, and will be in place for more than two years — until the opening of the Confederation Line in 2018.

Traffic delays will hit Queen Street, Rideau Street and Main Street this season, but the city is flagging Nicholas Street as the stretch most likely to be hit hardest.

“This is certainly one that will have the most significant impact,” Alain Gonthier, head of asset management, said during the briefing.

Buses and regular traffic will share both southbound lanes on Nicholas, with a special bus-only lane beginning at the Highway 417 eastbound on-ramp. But northbound between Highway 417 and Laurier Avenue will be reduced to one lane of general traffic and one bus-only lane.

The city is asking drivers to stay out of bus lanes and give buses priority.

And because traffic volumes are expected to be much higher, especially during the morning and afternoon rush hours, the city is advising drivers to avoid the area if possible and use alternate highways exits and entrances.

Drivers’ pain and inconvenience will be shared by pedestrians and cyclists. The tunnel underneath Nicholas Street and the Transitway, which is used heavily by those travelling between the campus, Sandy Hill and the west side of the Rideau Canal, will close from May 2 to Aug. 22 as crews tear down the Transitway bridge and reconfigure an adjacent plaza as part of construction of the new uOttawa LRT station.

Elsewhere in the city, major construction projects slated for Ottawa roads this summer include:
  • Queen Street: Westbound lanes between Bay and Metcalfe streets will be closed starting Sunday until winter 2017. The closure is required for the Queen Street streetscaping works. A single lane will be open for eastbound traffic only; westbound drivers should use Albert Street
  • Main Street reconstruction and the rehabilitation of the McIlraith Bridge: Starting in May and ending summer 2017, the work zone for a major project that began last year will be extended southward from Clegg Street to Riverdale Avenue. Northbound lanes on Main will be fully closed and detoured to Bank Street
  • Lyon Street: Reconstruction along part of this southbound link to the 417 will result in the closure of Lyon, as well as McLeod Street, from May to the fall
  • Elgin Street: The $110.5-million facelift at the National Arts Centre is forcing the closure of one northbound traffic lane on Elgin, as well as sidewalks and crosswalks, through to the fall
  • Rideau Street: Closed to most vehicles between Sussex Drive and Dalhousie Street until 2018 (when LRT opens)

Compared to the traffic crunches of past construction seasons, transportation chair Keith Egli said, “this is kind of crunchier.” The city wants to get major road work done this year before Ottawa hosts Canada’s 150th celebrations in 2017, Egli said.

Outside of the core, road widening projects are scheduled for Greenbank, Mer Bleue and Tenth Line, while ongoing construction of a new pump station and forcemain in Kanata will create lane reductions on Terry Fox Drive, Maple Grove Road and Katimavik Road.

Meanwhile, the Ministry of Transportation will be resurfacing stretches of the 417, fixing noise barriers and doing repairs at five west-end highway overpasses.

While all of this work happens above ground, crews will continue to dig the LRT tunnel underneath downtown, which the city expects to be fully excavated by the end of the summer.

The city will also start work on the combined sewage and storage tunnel, the final phase of the Ottawa River Action Plan. Once the contract has been awarded, construction will begin on Kent and Chamberlain streets later this year.

The closure of Campus station means most OC Transpo buses will use Nicholas to get to Laurier station, bypassing Campus and Lees stations. But some routes — 16, 85, 95, 98 and 97 (after 10 p.m.) — will use King Edward and Laurier.

The upper level of Lees station will remain open.

All westbound express bus trips in the afternoon will start at Mackenzie Bridge station.

Closing Campus station is also timed with other seasonal schedule changes.

OC Transpo is reducing the frequency of Trillium line O-Train service on weekdays, after 9 p.m. and on Sundays to match reduced ridership levels.

In a bid to save money, the bus service is also cutting some early morning and late night trips on the following routes: 16, 93, 94, 98, 99, 111, 112, 114, 116, 120, 121, 122, 128, 130, 131, 132, 134, 135, 136, 137, 143, 144, 147, 149, 150, 151, 152, 170, 172, 173, 175, 176, 177, 182, 189, 193.

The final stretch of the Transitway — between Tunney’s Pasture and Merton Street — will close June 24.

A new ramp will open to connect the Transitway trench and the upper level of Tunney’s Pasture station (the lower level will be torn down). Buses travelling in and out of downtown will use Scott and Albert streets, adding at least another minute to travel times under normal traffic conditions, according to OC Transpo.

The city says it’s spending $210 million this year to fix up existing infrastructure and another $132 million on new and improved infrastructure, such as roads, cycling pathways and sidewalks.

The city will also spend $35 million resurfacing 150 kilometres of roadway this year.

— With files from Jon Willing

[email protected]
twitter.com/mpearson78

http://ottawacitizen.com/news/local-news/transitway-transformation-nightmare-on-nicholas-street
     
     
  #3162  
Old Posted Apr 23, 2016, 5:33 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,646
Construction Update
Week of April 18




Crews waterproof the transition east of Lyon Station

Lyon Station


In Lyon Station cavern, crews waterproof the station arch, install rebar and pour the mudslab. In the transition east of Lyon Station cavern, waterproofing and concrete work continue. At West Portal, crews begin initial preparations to excavate the ramp to accommodate future guideway and trackwork.



Excavation in Parliament Station cavern

Parliament Station


In Parliament Station cavern, excavation of the bench continues. In the last section of running tunnel east of Parliament Station, mining continues east toward Rideau Station cavern. Shotcrete and rockbolt installations are ongoing along the tunnel.



Mining the central pillar in Rideau Station cavern

Rideau Station


In Rideau Station cavern, Crocodile Rouge mines the final section of the central pillar. Cavern support activities such as shotcrete are ongoing.



Excavation at Lyon Station west entrance

Downtown Integrated Stations and Entrances – Lyon, Parliament and Rideau Stations


Lyon Station west entrance: blasting continues following a breakthrough to the Lyon Station cavern adit. At the west vent shaft, tieback installations and excavation are ongoing. At the east vent shaft, piling crews mobilize.

Lyon Station east entrance: demolition of the slabs on the parking and concourse levels is ongoing. Crews continue plumbing and electrical work.

Traffic restrictions on Queen Street between Bay and Metcalfe streets begin April 24, 2016.

Parliament Station west entrance: on the parking level, crews pour the escalator wall and columns.

Parliament Station east entrance: crews install rebar, form new piers and reinforce columns.

Traffic restrictions on Queen and O’Connor streets remain in effect.

Rideau Station east entrance: crews waterproof and pour the mud slab. Excavators are removed from site at the end of the week.

Rideau Station west entrance: excavation is ongoing, along with support activities such as umbrella drilling and shotcrete. At the west vent shaft on the north side of Rideau Street, crews finalize shoring and concrete work.

Traffic restrictions on Rideau Street remain in effect.



Excavation for the Tunney’s Pasture Station temporary bus loop

Tunney’s Pasture, Pimisi, Lees, Hurdman, Tremblay, St-Laurent, Cyrville and Blair Stations


Tunney’s Pasture Station: backfilling and material removals occur as part of temporary bus loop work.

Pimisi Station: preliminary station excavation is ongoing.

Lees Station: crews mobilize to begin removing existing structures.

Hurdman Station: crews weld rebar and install grade beams as part of station work. Permanent bus loop work continues, including excavation and grading.

Tremblay Station: crews pour station footings and install duct banks. Concrete work occurs near the
west ring road.

St-Laurent Station: crews install grade beams, structural steel and continue backfilling. Plumbing and electrical work is ongoing.

Cyrville Station: crews continue installing the base for the integrated art. Electrical work, structural steel installation and work on the auxiliary building are ongoing.

Blair Station: Crews begin waterproofing and backfilling. Suspended slab pours are finalized and structural steel installation is ongoing. Crews continue construction of the RSS walls as part of permanent bus loop work.



Crews continue grading and install OCS foundations between Tremblay Station and Belfast Yard

Guideway Construction – Booth Street Bridge, Hurdman Station and Tremblay Station to Blair Stations


Booth Street Bridge: crews install formwork to prepare for concrete pours.

Transitway service adjustment from Lees to Laurier stations.

Hurdman Station Elevated Guideway: crews form the deck and install rebar.

Tremblay Station to Belfast Yard: crews begin pulling rail on the guideway between Tremblay Station and Belfast Yard. TPSS 6 was installed east of Tremblay Station and crews are preparing to install cabling.

St-Laurent Station to Blair Station: ballast installation and trackwork are ongoing.



Rebar and steel installations at Cyrville Station

Upcoming Construction Activities


The following construction activities are scheduled to occur:

In the coming weeks:
  • Final waterproofing and concrete work in Parliament Station cavern.
  • Final waterproofing and concrete work in Rideau Station cavern.
  • Excavation of the ramp at East Portal.
  • uOttawa Station construction.
  • Mann Avenue Bridge rehabilitation.
  • Watermain work near St-Laurent Station, along the guideway.
  • Watermain relocation at Cyrville Station.
  • Bus operators’ building construction at Blair Station

In the coming months:
  • Tunney’s Pasture Station construction.
  • Bayview Station preliminary construction.
  • Pimisi Station construction.




Did you know? Another traction power substation (TPSS) has been delivered and installed east of Tremblay Station.

O-Train Confederation Line will include 9 substations, eight of which will be distributed evenly along the alignment corridor and one at Belfast Yard, to provide power to the yard tracks. Most of the substations will be aboveground, with an underground substation servicing the three underground stations. TPSS structures are approximately four metres high by five metres wide by 15 metres long. They convert electricity from the local power sources to the levels needed by the vehicles. The LRT will operate on 1500 volts of DC power.

http://www.ligneconfederationline.ca/construction/construction-update-70/
     
     
  #3163  
Old Posted Apr 23, 2016, 7:22 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,801
How many more rounds of service cuts will there be between now and 2018? And of course, the opening of the Confederation Line will usher in 'new service', which will be a disguise for service cuts.
     
     
  #3164  
Old Posted Apr 23, 2016, 9:26 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Quote:
Originally Posted by lrt's friend View Post
How many more rounds of service cuts will there be between now and 2018? And of course, the opening of the Confederation Line will usher in 'new service', which will be a disguise for service cuts.
Or it could also be a secret code for, wait for it, new service.
It seems to me like a bit of an obvious statement since of course the old service can't stay the same because now there's LRT. As for whether there'll be service cuts, I'd actually say that it's more likely that all the buses that currently sit parked on Albert and Slater from 16h to 17h30 probably won't be sent to the scrapyard. Nor is it likely that all the bus drivers of said buses will be sacked. Nor is it likely that the pretty massive operational savings will be hoarded by a public transit agency.

It's totally possible that they'll take advantage of the opportunity to "review" some routes which are totally unrelated to the arrival of LRT, but to just say "this is clearly a front for service cuts!" is as cynical as it is unfounded.
__________________
I've always struggled with reality. And I'm pleased to say that I won.

Last edited by Aylmer; Apr 24, 2016 at 12:48 AM.
     
     
  #3165  
Old Posted Apr 23, 2016, 10:35 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
One thing I never understood; why did they go through so much trouble to completely demolish and re-configure Cyrville Station? Why didn't they just keep the side platforms and original vertical circulation?.
     
     
  #3166  
Old Posted Apr 24, 2016, 11:57 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by Aylmer View Post
Or it could also be a secret code for, wait for it, new service.
It seems to me like a bit of an obvious statement since of course the old service can't stay the same because now there's LRT. As for whether there'll be service cuts, I'd actually say that it's more likely that all the buses that currently sit parked on Albert and Slater from 16h to 17h30 probably won't be sent to the scrapyard. Nor is it likely that all the bus drivers of said buses will be sacked. Nor is it likely that the pretty massive operational savings will be hoarded by a public transit agency.

It's totally possible that they'll take advantage of the opportunity to "review" some routes which are totally unrelated to the arrival of LRT, but to just say "this is clearly a front for service cuts!" is as cynical as it is unfounded.
A bunch of those drivers could be siphoned off for the new LRT (drivers, attendants, security, etc).
     
     
  #3167  
Old Posted Apr 24, 2016, 2:11 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Yes, but there'll still be a very large reduction in staffing costs per passenger; The City estimates that the operational savings by 2030 will be of the order of $100 000 000 per year compared to the bus-only scenario. It's unlikely that 100% of those savings will be redirected back into the system, but even if only half of it is put towards better service, that's a lot of new frequencies and routes.

And in the short run, I'm optimistic that there will be some pleasant surprises in OC's bus network for the reasons I outlined in my last post: all the buses and bus drivers probably won't be scrapped and sacked.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #3168  
Old Posted Apr 24, 2016, 3:47 PM
Mr.Flintstone Mr.Flintstone is offline
Registered User
 
Join Date: Mar 2014
Posts: 76
Quote:
Originally Posted by J.OT13 View Post
One thing I never understood; why did they go through so much trouble to completely demolish and re-configure Cyrville Station? Why didn't they just keep the side platforms and original vertical circulation?.
I was asking the same thing when I took the picture of the station.

Quote:
Originally Posted by Mr.Flintstone View Post
Here a few Picture I took of Cyrville station



If you look on the left side of the picture you can see where the stairs are going to be but also redid the whole structure on the left. Then they seem to be building a centre stairs and centre platform. Don't know whats going on there
     
     
  #3169  
Old Posted Apr 24, 2016, 4:28 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by J.OT13 View Post
One thing I never understood; why did they go through so much trouble to completely demolish and re-configure Cyrville Station? Why didn't they just keep the side platforms and original vertical circulation?.
Because the original configuration was too tight to allow trains to turn, and it would have limited the platform length for future longer trains.

If you've ever been on the TTC subway between King and Union, you'll know what I mean. It's a really tight corner that trains have to slow down for, and you hear metal wheels grinding and squealing.
     
     
  #3170  
Old Posted Apr 25, 2016, 1:16 AM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
I'm thinking tomorrow will be an absolute mess, and the worst will be in the afternoon rush hour with all the turns necessary and buses entering town to start runs.

There are no obvious large-scale solutions either as that is the highest capacity entrance into downtown. However, I see a few small solutions:

1) Move Routes 5 and 16 to Rideau Street, allowing a few more spaces for peak period buses

2) Deadheading buses to Lebreton from the east should use 417 to the Bronson exit then up any of Bronson, Booth or Preston, reducing the strain at Mackenzie King and Laurier

3) Deadheading buses leaving downtown, if empty at Mackenzie King, should use the Laurier Avenue Bridge

4) Reallocate some Transitway buses to/from the west end so that they operate to and from Gatineau instead of through downtown, where they can then deadhead via St. Patrick and the Vanier Parkway
     
     
  #3171  
Old Posted Apr 25, 2016, 3:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
Quote:
Originally Posted by MaxHeadroom View Post
Because the original configuration was too tight to allow trains to turn, and it would have limited the platform length for future longer trains.

If you've ever been on the TTC subway between King and Union, you'll know what I mean. It's a really tight corner that trains have to slow down for, and you hear metal wheels grinding and squealing.
Thank you! I did not realize that.
     
     
  #3172  
Old Posted Apr 25, 2016, 4:29 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Quote:
Originally Posted by MaxHeadroom View Post
Because the original configuration was too tight to allow trains to turn, and it would have limited the platform length for future longer trains.

If you've ever been on the TTC subway between King and Union, you'll know what I mean. It's a really tight corner that trains have to slow down for, and you hear metal wheels grinding and squealing.
Also because the old station was not accessible since there was only one elevator per platform and there was no safe way to cross Cyrville. With the new station layout (middle platform) you only need two elevators, two sets of stairs and one platform. No need to cross Cyrville at all. Plus there is now space for a new MUP on the north side of the station passing under Cyrville - this connection will eventually be extended to the east.
     
     
  #3173  
Old Posted Apr 25, 2016, 4:30 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,076
Quote:
Originally Posted by Aylmer View Post
Or it could also be a secret code for, wait for it, new service.
It seems to me like a bit of an obvious statement since of course the old service can't stay the same because now there's LRT. As for whether there'll be service cuts, I'd actually say that it's more likely that all the buses that currently sit parked on Albert and Slater from 16h to 17h30 probably won't be sent to the scrapyard. Nor is it likely that all the bus drivers of said buses will be sacked. Nor is it likely that the pretty massive operational savings will be hoarded by a public transit agency.

It's totally possible that they'll take advantage of the opportunity to "review" some routes which are totally unrelated to the arrival of LRT, but to just say "this is clearly a front for service cuts!" is as cynical as it is unfounded.
The last time I spoke to a transit planning official at one of the public consultations, I was told, point blank, their goal is to get as many buses off the roads as possible.

"You mean transitway buses, right, not local routes?"

Nope. Across the board.

Perhaps thinking has changed since then. But at least at that time, the plan was to remove as many locals as they could, because LRT.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #3174  
Old Posted Apr 25, 2016, 4:33 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,076
Quote:
Originally Posted by eternallyme View Post
I'm thinking tomorrow will be an absolute mess, and the worst will be in the afternoon rush hour with all the turns necessary and buses entering town to start runs.

There are no obvious large-scale solutions either as that is the highest capacity entrance into downtown. However, I see a few small solutions:

1) Move Routes 5 and 16 to Rideau Street, allowing a few more spaces for peak period buses
You mean, move them BACK to Rideau Street, where they used to be before The People Who Don't Ride Their Own Buses decided, for no obviously good reason, to put them on the bridge instead.

Every so often a 5 or 16 driver messes up and goes to Rideau by accident. It is usually welcomed by the passengers.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #3175  
Old Posted Apr 25, 2016, 5:00 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,801
Quote:
Originally Posted by Uhuniau View Post
The last time I spoke to a transit planning official at one of the public consultations, I was told, point blank, their goal is to get as many buses off the roads as possible.

"You mean transitway buses, right, not local routes?"

Nope. Across the board.

Perhaps thinking has changed since then. But at least at that time, the plan was to remove as many locals as they could, because LRT.
I was in Calgary a week ago. I met up with an old friend and his wife. They told me that the C-Train is great, but only if you live near it or you Park n Ride and your destination is downtown. Calgary Transit's bus network is awful according to them.

I believe what the planner was referring to was local downtown buses not suburban locals. Regardless, relaying centre town routes to the closest Confederation Line station is not always in the best interest of riders. For example, it was previously proposed that the former Route 3 on Preston would no longer go downtown. This would be Route 85 today. Similarly Route 86 would end at Tunney's Pasture.

I think it is very unhealthy for our transit system to be over dependant on the Confederation Line. The primary goal is to serve the public better, not to get buses off of downtown streets. You have to wonder what we are doing. Making streets available for more cars or for STO buses, the latter which will never be moved off of downtown streets, at least until interprovincial rapid transit finally becomes important to somebody who has some power to do something about it.
     
     
  #3176  
Old Posted Apr 25, 2016, 8:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,971
Quote:
Originally Posted by hwy418 View Post
Also because the old station was not accessible since there was only one elevator per platform and there was no safe way to cross Cyrville. With the new station layout (middle platform) you only need two elevators, two sets of stairs and one platform. No need to cross Cyrville at all. Plus there is now space for a new MUP on the north side of the station passing under Cyrville - this connection will eventually be extended to the east.
I can definitely see now why it made sens to rebuild with a center platform.
     
     
  #3177  
Old Posted Apr 25, 2016, 10:07 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by Uhuniau View Post
You mean, move them BACK to Rideau Street, where they used to be before The People Who Don't Ride Their Own Buses decided, for no obviously good reason, to put them on the bridge instead.

Every so often a 5 or 16 driver messes up and goes to Rideau by accident. It is usually welcomed by the passengers.
It seemed to go quite well today actually...they seemed to plan it fairly well. But will it stay that way? September will be the biggest test though, since the number of bus trips naturally rises in the fall and drops in the spring and summer.
     
     
  #3178  
Old Posted Apr 26, 2016, 12:12 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
I got on at Mackenzie King and got off at St Laurent this morning in 9 minutes on the 94. For me, this new setup is fantastic!
     
     
  #3179  
Old Posted Apr 26, 2016, 9:12 PM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
Quote:
Originally Posted by Uhuniau View Post
You mean, move them BACK to Rideau Street, where they used to be before The People Who Don't Ride Their Own Buses decided, for no obviously good reason, to put them on the bridge instead.

Every so often a 5 or 16 driver messes up and goes to Rideau by accident. It is usually welcomed by the passengers.
Not sure about the 5, but 16 Westbound makes a lot of sense going to Mackenzie King. The route parallels the transitway all the way to Holland. Anyone traveling to anywhere between Carlingwood and Lincoln Fields also has multiple options to get there, and do not need to decide halfway through the Rideau Centre which stop they should wait at.
     
     
  #3180  
Old Posted Apr 27, 2016, 1:41 AM
ortelius ortelius is offline
Registered User
 
Join Date: Aug 2012
Posts: 89
Amazing video of construction in the east.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.