HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #1261  
Old Posted Apr 8, 2016, 12:59 AM
biguc's Avatar
biguc biguc is offline
Registered User
 
Join Date: Mar 2003
Location: pinkoland
Posts: 11,884
The future is in per-km pricing, probably with higher charges for peak times and congested routes. But we could throw up automatic tolling stations at every road into the city tomorrow.
__________________
no
Reply With Quote
     
     
  #1262  
Old Posted Apr 8, 2016, 1:07 AM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Quote:
Originally Posted by NK59 View Post
None of these other developments are getting any money for a public square... surprised they don't at least try and design something for "public space" near the base of the tower on True Norths precedent and ask for some cash to make it happen.

Where is Centre Venture in all this? Why not support all these hi rises and somehow link them together with public space, or at the least a face lift of Graham Ave. What is happening in Winnipeg is a exciting and they should be finding ways to encourage sales of these condos, commercial development, office space commitments, etc. RIDE THE EXCITEMENT! It's all tax dollars. If private companies invest a 700 million in new buildings in the next 5 years, why not 50 million of public money into downtown.

Ohh, and start charging tolls for suburbanite that drive to work in the city every day! $1 to enter the city every morning between 7am-9am.
I do want to see more investment in tree lined boulevards, paving stones, wider side walks, nice curbs, fountains, etc.

Last edited by Urban recluse; Apr 8, 2016 at 1:26 AM.
Reply With Quote
     
     
  #1263  
Old Posted Apr 8, 2016, 1:10 AM
Tinkertaylor Tinkertaylor is offline
Registered User
 
Join Date: Sep 2015
Posts: 8
My two cents

I could be wrong but I think the plan is for this to be connected to the inside walkway system downtown. And some sort of enclosed bus tunnel thing?

Based on those two factors, I think that would make a grocer in this location quite handy for people bussing home and living downtown. And in this climate? Call me a whimp but I dislike walking outside in -20 carrying grocery bags for any length of time.

Something like the family foods or a whole foods that sells produce in smaller portions and I can cut down or eliminate the amount of time facing a windchill? Sign me up. 🖊
Reply With Quote
     
     
  #1264  
Old Posted Apr 8, 2016, 2:55 PM
The Unknown Poster The Unknown Poster is offline
Registered User
 
Join Date: Mar 2012
Posts: 1,024
Is there any issue with having the man power and equipment to handle this much construction at the same time? Good problem to have. Know nothing about construction...just wondering how all these towers can be under construction at the same time.
Reply With Quote
     
     
  #1265  
Old Posted Apr 8, 2016, 3:48 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Lots of unemployed coming from Alberta??
Reply With Quote
     
     
  #1266  
Old Posted Apr 8, 2016, 4:07 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,312
I don't think there should be much of an issue. EllisDon is building SkyCity. PCL is building TNS. Not sure who Artis has engaged. If they're short staffed locally, they can go to other provinces to get workers. Happens quite often in that industry anyways. People move around, go where the work is.
Reply With Quote
     
     
  #1267  
Old Posted Apr 8, 2016, 4:16 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by bomberjet View Post
I don't think there should be much of an issue. EllisDon is building SkyCity. PCL is building TNS. Not sure who Artis has engaged. If they're short staffed locally, they can go to other provinces to get workers. Happens quite often in that industry anyways. People move around, go where the work is.
Yeah, these projects aren't that huge in the grand scheme of things. Centrepoint had crews from Quebec, they made it work.
Reply With Quote
     
     
  #1268  
Old Posted Apr 8, 2016, 4:18 PM
The Unknown Poster The Unknown Poster is offline
Registered User
 
Join Date: Mar 2012
Posts: 1,024
How about equipment? Tower cranes and the like?
Reply With Quote
     
     
  #1269  
Old Posted Apr 8, 2016, 4:32 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,312
Maybe on tower cranes. Those companies, again, will draw on resources they have and should be scheduling all this now. 1-2 tower cranes per location. Maybe if there's a shortage, they'll bring in crawler cranes. Similar to what 300 Ass did. I would think they could find the cranes somewhere. I don't think there's much else in the way of specialized equipment.
Reply With Quote
     
     
  #1270  
Old Posted Apr 8, 2016, 4:36 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ I would think all that gets factored into the cost of the project up front, I mean there are certainly a good number of tower cranes across the country and for the right price they can be had.
Reply With Quote
     
     
  #1271  
Old Posted Apr 8, 2016, 5:53 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,312
http://www.winnipegsun.com/2016/04/07/sk...oo?utm_source=dlvr.it&utm_medium=twitter

Bit of an article here in the Shun. Not much really new there. Myers confirming 2017 construction date and the 200 condo sold by end of year number.
Reply With Quote
     
     
  #1272  
Old Posted Apr 8, 2016, 6:20 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,904
Quote:
Originally Posted by esquire View Post
^ I would think all that gets factored into the cost of the project up front, I mean there are certainly a good number of tower cranes across the country and for the right price they can be had.
If I recall my projects right, the tower crane for Alt and Glasshouse came from Minnesota.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1273  
Old Posted Apr 8, 2016, 10:00 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,825
The large crawler cranes that Sterling crane used to lift the roof trusses for MTS center (and take down the tower cranes) came from out of Manitoba (I'm thinking Ontario) and were re-assembled on site. It was interesting watching them put one together with smaller truck mounted cranes.
Reply With Quote
     
     
  #1274  
Old Posted Apr 8, 2016, 11:11 PM
LilZebra LilZebra is offline
Orig. frm Alpha Pectaurus
 
Join Date: Nov 2004
Location: Assiniboia, Man.
Posts: 2,873
Quote:
Originally Posted by bomberjet View Post
http://www.winnipegsun.com/2016/04/07/sk...oo?utm_source=dlvr.it&utm_medium=twitter

Bit of an article here in the Shun. Not much really new there. Myers confirming 2017 construction date and the 200 condo sold by end of year number.


I'd love a living room like that...
__________________
Buh-bye
Reply With Quote
     
     
  #1275  
Old Posted Apr 9, 2016, 12:50 AM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
It's the lobby hahaha
Reply With Quote
     
     
  #1276  
Old Posted Apr 25, 2016, 4:11 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Nice to here, @TheHIDIGroup, @RJC_Engineers are onboard with this one..Let's turn some sod early in 2017..
Reply With Quote
     
     
  #1277  
Old Posted Apr 25, 2016, 4:37 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,270
Anyone know the latest sales figures?
Reply With Quote
     
     
  #1278  
Old Posted Apr 25, 2016, 5:18 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,312
Still at 150+ on the billboards.
Reply With Quote
     
     
  #1279  
Old Posted Apr 26, 2016, 3:41 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by bomberjet View Post
Still at 150+ on the billboards.
But do we know that for sure?

I've heard anywhere from "they're not even at 100 yet" all the way to "slow, yet steady/reliable momentum". I hope it's the latter.



Regarding the grocer, no major chain (which is exactly what everyone is implying with "grover") would come into town for less than 20,000. There certainly is a market for such a store, especially is SkyCity/TNS/Artis can accommodate a format allowing for online ordering and a pickup window. Daily foot traffic would be strong for sure.

I already regret the fact that my wife will almost certainly make me bring the groceries home all the time if that happens (she has been kind enough to do that all herself so far).
Reply With Quote
     
     
  #1280  
Old Posted Apr 26, 2016, 3:43 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,312
Well all we have to go off is the billboard and this post from their Twitter, from a couple months ago. I don't think we're going to get a for sure, for sure, for sure answer from anyone. As in, they're not going to show you the signed papers for each sale. So we'll just have to trust the numbers. I also don't think they'd fudge the sales chart, then have people come in and say "well actually we have all these other units for sale, too."

https://twitter.com/SkyCityWinnipeg/status/700388394724032512
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 6:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.