Quote:
Originally Posted by The Unknown Poster
400 Apartments. Is there parking to support this?
|
That's what I was asking SkyCity about when it was announced.
The silly little BRT we have won't be able to handle all the extra passengers.
So what is WT's medium term plan to add capacity to their routes?
If the 55 St. Anne's is chronically undercapacity now, how will it be when more and more want on the bus?
If that portion of Main St. in front of 360 is bus after bus after bus right now, how will the buses move quicker?
Functional Transit Winnipeg guestimates we'll need upwards of 200 more diesel buses to satisfy demand.
With all these new residential projects, is it the answer to just keep adding more and more buses? At what point do you say, "OK, we acknowledge that the diesel-only system cannot be the complete answer, we'll now accept that rail can be the answer too."
I've been watching CTA mass transit videos these past few days, and you know, the CTA subway mostly above ground like the Vancouver SkyTrain. So for some people here to say let's put a monorail along Portage or down Pembina Hwy, or down Main St....
Maybe that'll be absolutely necessary now.
After all, when the Trizec project was first announced in January 1974, the plan was still to build a monorail. The BRT proponents hadn't paid for any studies until a year or two later. Trizec would have assumed some sort of rail transit to serve the project as completed.
CTA Pink Line (mostly elevate)
https://www.youtube.com/watch?v=n0zZlij52oc
See, that's why I've always said rail was superior to bus.