Construction should start in 2021! WOW
With all the normal delays, expect to move in no sooner than 2026.

|
It looks like what was written in the article was a poor intrepretation of the report, which says:
Phase 1A– 155 residential units consisting of singles, towns and apartment dwellings; start in 2016.
Phase 1B – 28 residential units consisting of single, towns; start in 2018.
Phase 2 – 464 residential units consisting of towns, back to back towns and apartment dwellings along with approximately 3,395 square metres of retail space; start in 2021.
Phase 3 –120 residential units consisting of towns and apartment dwellings
and the partial demolition of the existing Deschâtelets building and rehabilitation of remaining into approximately 149 apartment dwellings/seniors housing; start in 2020.