  #1941  
Old Posted Mar 30, 2016, 3:41 PM
Sandbagger Sandbagger is offline
Registered User
 
Join Date: Sep 2015
Posts: 225
With the center now under construction, I would anticipate an increase in larger vehicle traffic passing through downtown not just during but also after completion. You'd have transport trucks, taller charter busses etc. Has there been any discussion about fixing the height of the subway? It would be deceivingly complex I would think.
Reply With Quote
     
     
  #1942  
Old Posted Mar 30, 2016, 4:00 PM
NBNYer's Avatar
NBNYer NBNYer is offline
Registered User
 
Join Date: Mar 2010
Location: Moncton
Posts: 1,269
Quote:
Originally Posted by Sandbagger View Post
With the center now under construction, I would anticipate an increase in larger vehicle traffic passing through downtown not just during but also after completion. You'd have transport trucks, taller charter busses etc. Has there been any discussion about fixing the height of the subway? It would be deceivingly complex I would think.
With Assumption blvd just 1 block away, I can't see the city pouring a lot of resources in replacing and elevating the subway.
Reply With Quote
     
     
  #1943  
Old Posted Mar 30, 2016, 4:54 PM
Sunnybrae's Avatar
Sunnybrae Sunnybrae is offline
Registered User
 
Join Date: Jun 2010
Posts: 748
Quote:
Originally Posted by Sandbagger View Post
With the center now under construction, I would anticipate an increase in larger vehicle traffic passing through downtown not just during but also after completion. You'd have transport trucks, taller charter busses etc. Has there been any discussion about fixing the height of the subway? It would be deceivingly complex I would think.
I always thought that when CN closed the shops and moved work to Montreal, part of that restructure should have included the removal of the tracks through the downtown of the city. They only removed the lines that went up Vaughan Harvey to the shops. Being a crown corporation at the time, the government should have acted but instead left us with a mess.
Reply With Quote
     
     
  #1944  
Old Posted Mar 30, 2016, 5:23 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,109
Quote:
Originally Posted by Sunnybrae View Post
I always thought that when CN closed the shops and moved work to Montreal, part of that restructure should have included the removal of the tracks through the downtown of the city. They only removed the lines that went up Vaughan Harvey to the shops. Being a crown corporation at the time, the government should have acted but instead left us with a mess.
It might be a god idea to get the freight trains out of the core, but removing the trackage would mean abandoning the downtown passenger train station in favour of a suburban station somewhere north of the TCH.

I don't know if we want to go down that particular path. There may be a resurgence in passenger rail, with the VIA President muttering about increased local train service to Halifax and the north shore. Also, in 50-60 years, with the demise of the gasoline economy, we might be happy we maintained the ROW through downtown......
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1945  
Old Posted Mar 30, 2016, 5:41 PM
Sunnybrae's Avatar
Sunnybrae Sunnybrae is offline
Registered User
 
Join Date: Jun 2010
Posts: 748
Quote:
Originally Posted by MonctonRad View Post
It might be a god idea to get the freight trains out of the core, but removing the trackage would mean abandoning the downtown passenger train station in favour of a suburban station somewhere north of the TCH.

I don't know if we want to go down that particular path. There may be a resurgence in passenger rail, with the VIA President muttering about increased local train service to Halifax and the north shore. Also, in 50-60 years, with the demise of the gasoline economy, we might be happy we maintained the ROW through downtown......
You keep the station where it is, but that would be the end of that line coming from the west. The train would reverse back to the rail yard in the industrial park. The new main line should have ran parallel to the TCH north of the city. I'm also talking about what they should have done in the 80's. Now they are screwed.
Reply With Quote
     
     
  #1946  
Old Posted Mar 30, 2016, 5:51 PM
Scarface Scarface is offline
Registered User
 
Join Date: Jun 2015
Posts: 1,514
Does anyone know the year built for 50 King Street?

I was looking at how far back the talks about Downtown, and the convention had gone on for, and found out it has been going on over 10 years not necessarily on this site.

I found some lets say strange information there is a man who stated on his own website that in 2011 he had talked to city council Members about the new Convention center on Main Street, and also about making Main St. Between Vaughan Harvey, and King Street Pedestrian only, having St George, and Assomption Blvd as the vehicle routes, and having the city turn Gordon/Queen Street into the designated Transit route. (If I find the site again I'll post the link to the post here.)


As for the potential redevelopment of the empty building between Lutz, and the Subway it does not seem to be a go ahead with the developers that where first talking about it unfortunately. For 2 reasons 1. while they talked about a potential hotel. 2 Buildings 869 Main Street, and 883 Main where not for sale, and not likely to be sold cheaply if they would have been sold at all.
2. The Companies that where to join together in this potential project seem to have sold off all there assets, to other companies. This was in an attempt to avoid having to claim bankruptcy. I know the original owners personally so this is information I got from them.
Reply With Quote
     
     
  #1947  
Old Posted Mar 30, 2016, 6:33 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,109
Quote:
Originally Posted by Scarface View Post
As for the potential redevelopment of the empty building between Lutz, and the Subway it does not seem to be a go ahead with the developers that where first talking about it unfortunately. For 2 reasons 1. while they talked about a potential hotel. 2 Buildings 869 Main Street, and 883 Main where not for sale, and not likely to be sold cheaply if they would have been sold at all.
2. The Companies that where to join together in this potential project seem to have sold off all there assets, to other companies. This was in an attempt to avoid having to claim bankruptcy. I know the original owners personally so this is information I got from them.
Thanks for the info. I must admit I always thought the subway block would be a strange place for a hotel anyway. The block is oddly shaped and cheek by jowl next to the CNR mainline. I imagine any patrons would be displeased with a 150 car freight train passing by at 3:30 in the morning......
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1948  
Old Posted Mar 30, 2016, 6:49 PM
L'homard L'homard is offline
Registered User
 
Join Date: Jun 2013
Posts: 1,055
Re moving the tracks, old guys like me will recall this has been talked about for many decades and almost came to pass many years ago, with the site chosen for a new train station in the then-new Caledonia Industrial Estates, where it would have been easy to run a new line from the area of Shediac Road, circumventing the city, and reconnecting near Berry Mills.
Of course this never came to be. I don't remember why but I would bet money this would have been a hard sell to CN which no doubt would have been on the hook for at least 1/3rd and more likely 1/2 or more of the cost.
Reply With Quote
     
     
  #1949  
Old Posted Mar 31, 2016, 2:14 PM
J81 J81 is offline
Registered User
 
Join Date: Dec 2013
Posts: 828
Quote:
Originally Posted by L'homard View Post
Re moving the tracks, old guys like me will recall this has been talked about for many decades and almost came to pass many years ago, with the site chosen for a new train station in the then-new Caledonia Industrial Estates, where it would have been easy to run a new line from the area of Shediac Road, circumventing the city, and reconnecting near Berry Mills.
Of course this never came to be. I don't remember why but I would bet money this would have been a hard sell to CN which no doubt would have been on the hook for at least 1/3rd and more likely 1/2 or more of the cost.
It didnt make sense because all of the businesses that the railway serviced were downtown or in the MID. Also you cant just build a railway next to a highway. Look at the change in elevation of the TCH from Harrisville blvd west to Berry Mills road. The amount of fill they would have had to dump to even that out enough to run a freight train over would be ridiculous! And for what? What would it accomplish? Are we really that inconvenienced by a few freight trains passing through each day? I bet not one of you could tell me how many per day pass through the downtown?

This argument to move the tracks outside the city makes as much sense as the one for closing the 3 major airports in NB to build one in Sussex! It makes zero sense!
Reply With Quote
     
     
  #1950  
Old Posted Mar 31, 2016, 5:45 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
One west bound intermodal, one east bound, one west bound freight, one east bound and one road switcher to the Caledonia Industrial Park every 2 days. Plus VIA so your looking at about 6 to 12 minutes of train per day considering that the speed limit there is 30MPH which isn't the fastest for a train but that's the speed the city imposed, either way it doesn't take long for a train to clear a crossing. CN is willing to reroute the mainline to Halifax that everyone is talking about which is a very important corridor and is advertised quite a bit to the Halifax ports, but the city would have to pay the bill. Every penny and we're talking hundreds of millions here, not even worth thinking about for 6-12 minutes of train per 24 hour cycle. You'd be surprised at how many people actually enjoy seeing the train run by. I'm pretty sure Moncton taxpayers can't afford that and besides its why the city is called the hub because of the railway infrastructure.
Reply With Quote
     
     
  #1951  
Old Posted Apr 1, 2016, 8:55 PM
J81 J81 is offline
Registered User
 
Join Date: Dec 2013
Posts: 828
And rarely would anyone ever see the intermodal trains because they pass through during the wee hours of the morning.

Im not sure why you think CN would be okay with moving the tracks? It benefits the company in no way. It complicates operations and it accomplishes nothing! And then you have the issue of VIA rail. Passenger rail works when the stations are in the middle of cities and towns. Take a ride on the Ocean to Montreal and tell me how many stations are on the outskirts of town! Zero! And in some cases while the train is in station there are multiple crossings blocked in the downtown core for up to 10 minutes. Drummondville comes to mind especially. So I just dont understand people who are clamouring for this to happen.
Reply With Quote
     
     
  #1952  
Old Posted Apr 2, 2016, 12:33 AM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
To loop the tracks around the city and into the yard wouldn't complicate operations as far as I see and train speed would be kept higher rather than slowing them down and going through the city plus there would be less crossings but who knows. Either way the city will never have the funds to do such a thing and I wouldn't worry about it. It's not as if it's going to happen. But the reason why I said that is because they said in a article a few years back in the Times & Transcript that they would be willing to entertain that ideal if the city pays. But the station is another problem all together like you said. But as far as looping around the city it would only be a matter of time until the city would grow out to meet the tracks and then we have the same problem all over again, it just doesn't make much sense to move them.
Reply With Quote
     
     
  #1953  
Old Posted Apr 3, 2016, 2:28 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,109
K-CupBop (Korean restaurant) has apparently now opened on Main Street
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1954  
Old Posted Apr 3, 2016, 4:12 PM
NBNYer's Avatar
NBNYer NBNYer is offline
Registered User
 
Join Date: Mar 2010
Location: Moncton
Posts: 1,269
Quote:
Originally Posted by MonctonRad View Post
K-CupBop (Korean restaurant) has apparently now opened on Main Street
I noticed it too, but have yet to try it. This is already their second location in the region. The other one, located across from Mathieu-Martin high school on Champlain street in Dieppe, open recently as well.
Reply With Quote
     
     
  #1955  
Old Posted Apr 3, 2016, 4:35 PM
CodiacRon CodiacRon is offline
Registered User
 
Join Date: Apr 2016
Posts: 3
Subway Replacement

The present subway provides a barrier between the New Events Centre and
the rest of the Downtown. It's time this ugly eyesore is replaced. The
present railway bridge was built for three sets of tracks but at present
only 1 set of tracks cross it. This means that 2/3rd's of it could be
removed to make way for a new ridge. If the railbed were raised slightly
and a thin deck design were used, much of the dip in Main Street could
be eliminated. Perhaps a design competition could be held to come up
with a economical solution to the problem. Whether or not a new railway
bridge is built, removing 2/3rd's of the present structure would be a
major improvement.
Reply With Quote
     
     
  #1956  
Old Posted Apr 3, 2016, 6:44 PM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,102
Welcome to the forum, CodiacRon!

There's no denying the subway has seen better days. It definitely needs some maintenance and I don't imagine CN is terribly interested in doing anything to it provided it stays structurally sound. That said, I disagree that we'd be better off with it gone. Personally, I think it adds a lot of character to that end of downtown. It's the most visible piece of railroad heritage left in the city and I think it would be a shame to replace it.
__________________
"When you go home tonight, there's gonna be another story on your house! "
Reply With Quote
     
     
  #1957  
Old Posted Apr 5, 2016, 2:01 PM
tmacdougall tmacdougall is offline
Registered User
 
Join Date: Jun 2014
Posts: 246
subway and foot traffic

I have to agree with CodiacRon! I'm a lifer here in Greater Moncton and I have always seen the subway as something that breaks up the downtown in two pieces.

Ideally, I would like to see a more natural flow for foot traffic before and after games/events.

Quote:
Originally Posted by mylesmalley View Post
Welcome to the forum, CodiacRon!

There's no denying the subway has seen better days. It definitely needs some maintenance and I don't imagine CN is terribly interested in doing anything to it provided it stays structurally sound. That said, I disagree that we'd be better off with it gone. Personally, I think it adds a lot of character to that end of downtown. It's the most visible piece of railroad heritage left in the city and I think it would be a shame to replace it.
Reply With Quote
     
     
  #1958  
Old Posted Apr 5, 2016, 4:31 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
When CN replaced the bridge over Halls Creek in front of Taylor Ford they reduced the width of the bridge. It used to be a 2 track bridge for both tracks all the way to Painsec Junction at Shediac road. Now with only 1 track there they installed a new 1 track bridge. It's more than likely they'll do the same for the subway once the bridge needs to be replaced. I'm sure they'll only replace the bridge when it needs to be replaced though and not earlier. As far as the subway dividing downtown into 2, that's probably because you can't see over the hill which won't change in my opinion because of a thinner bridge.
Reply With Quote
     
     
  #1959  
Old Posted Apr 12, 2016, 3:05 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,109
Alexandra's Pizza on Main Street has now closed, but will soon reopen as "Moncton Pizza & Grill"
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1960  
Old Posted Apr 12, 2016, 3:22 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,109
There is a Facebook page devoted to the MH35 project proposed for the old Moncton High School site.

https://www.facebook.com/mh35moncton/?fref=ts

Here's the URL for an interesting video by Jim Lockyer talking about the project. It includes a couple of flyby animations and some floor plans:
https://www.facebook.com/mh35moncton/videos/978311162222544/

Here are screen captures of the floor plans from the video (hence blurry).

Level 1 - you can see how the planned library space wraps around the central courtyard of the old school on three sides. I think this shows a lot of potential. Note that the library entrance is off the parking lot, and not off the main atrium of the building. The "centre of excellence" refers to space for the performing arts, and particularly the Atlantic Ballet Company of Canada.


Level 2 - you can see the auditorium on this level, as well as adjacent studios (created from the old gymnasium) which could also be used by the Atlantic Ballet Company, or for other theatrical rehearsal spaces. I think the area marked "cultural space" could be used for the proposed modern art gallery. The main atrium is on this level and will serve the auditorium and the "cultural space". You can also see that one wing of the building on this level is proposed to be rented out to the province, presumably for office space.


Level 3 - is mostly given over to a "learning centre". I'm not entirely sure what this means, but I imagine this space could be used for a variety of cultural purposes such as small studios, or for classrooms for night courses etc.
__________________
Go 'Cats Go

Last edited by MonctonRad; Apr 12, 2016 at 3:53 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 3:08 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.