  #14741  
Old Posted Mar 24, 2016, 2:22 AM
Mac Write Mac Write is offline
 
Join Date: Dec 2008
Posts: 1,423
is some of the $370M going to get us more rolling stock (aka at bare min another 7 4-car Mark III transets and 40 more rotten cars for the Canada line, and maybe even a 3rd new sea bus?
     
     
  #14742  
Old Posted Mar 24, 2016, 2:34 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
 
Join Date: Jan 2004
Posts: 3,145
Right off the bat... I agree with everyone here that the Broadway subway line should have been built yesterday.

But here, today, living in the real world, things are more complicated than that. For example, the Broadway subway line is not "shovel ready" by any means. Just a couple of reasons:

1. While the line has had various "studies" undertaken thereto... that's it. No funds have been committed, to date, for the important FEED (front-end engineering and design). That, unto itself, requires a major capital outlay and will also pin down a capex figure for the project;

2. No application has been made to the BCEAO. At all. One needs BCEAO enviro certification before any construction can commence. As an example, just look at the Evergreen Line - BCEAO enviro application was commenced on March 15, 2006. Final BCEAO enviro certification was not received until February 3, 2011 - just under 5 years later!

Unfortunately, aside from the various 3 political jurisdictions involved, which always complicates matters, the foregoing FEED and regulatory requirements have not yet even begun. Or even been contemplated.

Again, these large projects (Broadway subway line/Surrey LRT) take years before shovels eventually hit the ground. Unfortunately.
     
     
  #14743  
Old Posted Mar 24, 2016, 2:47 AM
carlos_danger carlos_danger is offline
 
Join Date: Apr 2015
Posts: 18
Quote:
Originally Posted by Mac Write View Post
is some of the $370M going to get us more rolling stock (aka at bare min another 7 4-car Mark III transets and 40 more rotten cars for the Canada line, and maybe even a 3rd new sea bus?
There are currently four seabuses in use but no operational budget to run more than two of them at once. Two of those vessels are old (1976) but are still regularly used as spares. They will need to be retired eventually, but in the interim higher frequencies could be achieved without a new build, as was done during the Olympics.
     
     
  #14744  
Old Posted Mar 24, 2016, 3:31 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Quote:
Originally Posted by Stingray2004 View Post
...

2. No application has been made to the BCEAO. At all. .
Yeah, for Canada Line a reference alignment was submitted, then when the proponent was selected, the application was revised to reflect the actual project as proposed.
     
     
  #14745  
Old Posted Mar 24, 2016, 4:36 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
 
Join Date: Jan 2004
Posts: 3,145
Quote:
Originally Posted by officedweller View Post
Yeah, for Canada Line a reference alignment was submitted, then when the proponent was selected, the application was revised to reflect the actual project as proposed.
In terms of the Canada Line, the BCEAO enviro assessment period was much shorter than the Evergreen Line - application filed February 22, 2003 with final enviro certification on June 7, 2005 - under 2 1/2 years.

So... if there's a will... there's a way. So to speak.

And news reports tonight indicate that any construction commencement on the Broadway line is at least until 2018 - "at the earliest".
     
     
  #14746  
Old Posted Mar 24, 2016, 5:25 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
 
Join Date: Aug 2010
Posts: 1,745
Quote:
Originally Posted by officedweller View Post
The whole "not ready to roll" thing kinda brings a sombre weight to the line in Surrey's LRT promotional video where there is a claim that the LRT project is "shovel ready", don't you think???

In any case, the real reason the LRT project is going to need a review was revealed just a few days ago: the cost has increased to $2.6b, something the city's representative blamed on land cost increases. It's no secret that an at-grade rail line on a street median is going to require a LOT of land acquisition...
     
     
  #14747  
Old Posted Mar 24, 2016, 7:38 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
 
Join Date: May 2010
Posts: 4,820
Quote:
Originally Posted by carlos_danger View Post
There are currently four seabuses in use but no operational budget to run more than two of them at once. Two of those vessels are old (1976) but are still regularly used as spares. They will need to be retired eventually, but in the interim higher frequencies could be achieved without a new build, as was done during the Olympics.
The major cost in running a third seabus is increasing the frequencies of all the north shore buses that are timed to meet it. A third seabus does little good if there are no buses to deliver people to it or pick up people disembarking from it.
     
     
  #14748  
Old Posted Mar 24, 2016, 11:25 AM
Kisai Kisai is offline
 
Join Date: Jun 2014
Posts: 1,154
Quote:
Originally Posted by xd_1771 View Post
The whole "not ready to roll" thing kinda brings a sombre weight to the line in Surrey's LRT promotional video where there is a claim that the LRT project is "shovel ready", don't you think???

In any case, the real reason the LRT project is going to need a review was revealed just a few days ago: the cost has increased to $2.6b, something the city's representative blamed on land cost increases. It's no secret that an at-grade rail line on a street median is going to require a LOT of land acquisition...
By the time that LRT gets built, if Surrey City Council keeps their heads in the sand about the poor business case for light rail, it's going to cost over 5 billion. Just from the rate of land acquisition prices and construction costs. Let's just hope that interest rates don't jump back to 1980's rates or nothing is getting built.

https://www.biv.com/article/2015/10/astonishing-land-prices-skew-surrey-real-estate-ma/
Quote:
It is not uncommon for multi-family residential sites in South Surrey to sell for $2.5 million per acre, he said, up from $1.8 million to $2 million an acre just five months ago.
So 25% average every 5 months or so.
     
     
  #14749  
Old Posted Mar 30, 2016, 1:55 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
I guess the artwork at the end of the Canada Line is rotating (like at the various stations).

The SkyDam replaces another art plinth project called Cluster.


SkyDam, created by artist Nathan Lee, is part of the Art Plinth exhibition, designed to bring some vibrancy
and art to the otherwise blank and bland end of the Canada Line’s concrete guideway.

http://www.richmond-news.com/news/beaver-dam-awaits-canada-line-passengers-at-brighouse-1.2217145
     
     
  #14750  
Old Posted Mar 30, 2016, 3:14 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Looks like the "future" Canada Line Station at 57th Ave will move ahead:

Quote:
New SkyTrain station will be privately funded
by Jill Drews
Posted Mar 29, 2016 5:51 pm PDT

VANCOUVER (NEWS 1130) – There’s a rather unique feature included in one of the upcoming developments slated to transform South Vancouver. It will be the site of a new privately-funded Canada Line station.

This will be the first time a new SkyTrain station will be built in Vancouver with private funds as part of a condo development. The complex will be built on the old hospital site at Cambie and 57th. It includes a mix of market and social housing.

...

Meggs says there is a possibility for more new privately-funded stops in the future. “There are places where we’ve had SkyTrain stations put in and we haven’t seen the development that we’d like to see, so it’s good when it works the other way and the development actually pays for the SkyTrain station.”

Another possible location is Cambie and 33rd. Construction is expected to start in 2018.
http://www.news1130.com/2016/03/29/new-skytrain-station-will-be-privately-funded/
     
     
  #14751  
Old Posted Mar 30, 2016, 3:25 AM
Mac Write Mac Write is offline
 
Join Date: Dec 2008
Posts: 1,423
and the continuous construction of of Skytrain since 1998 continues.

M-Line after opening Lake City way opened a year or so later, then VCC Clark started construction, then the Canada Line. we seem to only get a year or 2 break at most between construction phases.
     
     
  #14752  
Old Posted Mar 30, 2016, 3:56 PM
CanSpice's Avatar
CanSpice CanSpice is offline
 
Join Date: Dec 2014
Posts: 2,734
Quote:
Originally Posted by officedweller View Post
Looks like the "future" Canada Line Station at 57th Ave will move ahead:


http://www.news1130.com/2016/03/29/new-skytrain-station-will-be-privately-funded/
I really wish New Westminster council had had the foresight to require development fees in Victoria Hill so the Woodlands SkyTrain Station could have been built. Sadly, they weren't forward-thinking at the time.
     
     
  #14753  
Old Posted Mar 30, 2016, 5:11 PM
Express691 Express691 is offline
 
Join Date: Aug 2015
Posts: 650
     
     
  #14754  
Old Posted Mar 30, 2016, 5:32 PM
go_leafs_go02 go_leafs_go02 is offline
 
Join Date: Dec 2007
Posts: 2,406
Transit Network Consultation Report is up:

http://www.translink.ca/tnc

Quote:
Recommendation highlights

Create a B-Line along Hastings
Improve travel time and reliability along the 49
Implement a number of changes to provide new connections to the Evergreen Extension
Increase reliability and travel time for passengers travelling to and from ferry services
Introduce new service areas in South of Fraser on the 501 and 595
Improve the efficiency of NightBus services
     
     
  #14755  
Old Posted Mar 30, 2016, 9:58 PM
Kokkei Mizu's Avatar
Kokkei Mizu Kokkei Mizu is offline
 
Join Date: Aug 2010
Posts: 447
Hey there. First time posting in the Vancouver subforum. Just travelled to Vancouver recently and loved it. I took footage of all of the open SkyTrain lines. (Too bad Evergreen wasn't open yet). Anyway, I have uploaded all of the Expo Line so far. Looking for some feedback

Here's a playlist that will play all videos automatically:
https://www.youtube.com/playlist?list=PLkL0xkcZrNxDOb5Y7jmwC3q3okm26bGOB

And here's the first video as a taste:
• Video Link
     
     
  #14756  
Old Posted Mar 30, 2016, 10:40 PM
finalcoolman finalcoolman is offline
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by CanSpice View Post
I really wish New Westminster council had had the foresight to require development fees in Victoria Hill so the Woodlands SkyTrain Station could have been built. Sadly, they weren't forward-thinking at the time.
Eww hell no. More stations is not a good thing. The travel times are already slow enough and I wish Lake City was never built.
     
     
  #14757  
Old Posted Mar 30, 2016, 10:49 PM
idunno idunno is offline
 
Join Date: Feb 2010
Posts: 957
Quote:
Originally Posted by finalcoolman View Post
Eww hell no. More stations is not a good thing. The travel times are already slow enough and I wish Lake City was never built.
Don't worry about it, the Canada Line was built to maintain its 25/26 minute end-to-end time, even with all of the additional 'future' stations put in. This is why it seems so slow right now (apparently).
     
     
  #14758  
Old Posted Mar 30, 2016, 10:56 PM
Aroundtheworld Aroundtheworld is offline
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by Kokkei Mizu View Post
Hey there. First time posting in the Vancouver subforum. Just travelled to Vancouver recently and loved it. I took footage of all of the open SkyTrain lines. (Too bad Evergreen wasn't open yet). Anyway, I have uploaded all of the Expo Line so far. Looking for some feedback

Here's a playlist that will play all videos automatically:
https://www.youtube.com/playlist?list=PLkL0xkcZrNxDOb5Y7jmwC3q3okm26bGOB

And here's the first video as a taste:
• Video Link
Welcome to the subforum! Thanks for posting the video.
     
     
  #14759  
Old Posted Mar 30, 2016, 11:22 PM
finalcoolman finalcoolman is offline
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by idunno View Post
Don't worry about it, the Canada Line was built to maintain its 25/26 minute end-to-end time, even with all of the additional 'future' stations put in. This is why it seems so slow right now (apparently).
Yes I know that but this is regarding the Millennium Line not the Canada Line.
     
     
  #14760  
Old Posted Mar 31, 2016, 4:25 PM
CanSpice's Avatar
CanSpice CanSpice is offline
 
Join Date: Dec 2014
Posts: 2,734
Quote:
Originally Posted by finalcoolman View Post
Eww hell no. More stations is not a good thing. The travel times are already slow enough and I wish Lake City was never built.
Woodlands / Victoria Hill has a whole whack of townhouses and towers, with only one community shuttle route to service the entire thing. It's the ideal location for a SkyTrain station to help reduce the car-dependent nature of that neighbourhood, especially in New Westminster, and even more especially because of its proximity to the north end of the Pattullo Bridge and all the traffic associated with it.

I'm not asking for six more stops, I'm asking for one in a location that sorely needs better transit access. If it increases your commute by a minute or two, well, too bad.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:17 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.