Quote:
Originally Posted by FrankieFlowerpot
In the grand scheme of things in the cost of a stadium, there's not that much difference in the cost between the two.
|
Depends how you look at it. BMO is a 180M stadium. But that canopy eats up 40M of that cost and the Argos conversion eats up another 20M (phase 2 and 3)
So take that away and you're left with a 120M stadium with 30,000 seats and 2 rows of cooperate boxes in Toronto which has the highest construction costs in all of Canada if i'm not mistaken?
So I have a hard time thinking you cant build a stadium with 5000 less seats and have the cooperate boxes in 1 shot in Halifax for 100M
Basically what you're saying is that THF is the absolute cheapest way you could build a 24,000 seat stadium and BMO is living proof that It's just not true
Think about it this way. MLSE spent 50M on the new 8000 seat west side BMO stands which also houses clubs, cooperate suites and the Argos locker room ect. So really you have 50M to remaining to build the remaining stands 17000 more seats,turf and a scoreboard. Fair enough?