Quote:
Originally Posted by markbarbera
This scathing column on the new Edmonton LRT line should be required reading for anyone at Metrolinx planning out LRT for Hamilton.
http://news.nationalpost.com/full-commen...wn-transit-times-and-increases-emissions
We really need to learn from Edmonton's experience. I am particularly concerned because, thus far, preliminary design elements for Hamilton's A-Line are hauntingly similar to what Edmonton has put in place. There is a lesson-learned opportunity here that I hope Hamilton does not squander.
|
We knew this concern would happen....
This is part of why our new Hamilton LRT citizen advocacy run by local residents started up recently;
Make sure it stays on track -- get best economic/social benefits -- and avoid big mistakes.
Concerned residents wanting the best possible LRT system (efficient ones in other cities than Edmonton), including myself, have started up a new Hamilton LRT advocacy this September 2015 precisely to help avoid this type of situation. We advocate for the best possible LRT system -- as well as best social/economic benefits.
Since we started up a mere few months ago, we now got highly active
Twitter and
Facebook accounts. Website (
www.hamiltonLRT.ca) is coming soon.
Several members of the original hamiltonlightrail.ca advocacy ("help get LRT funded") are also currently involved with us, with our advocacy ("help keep LRT on track").
We've been sending a delegation of multiple members to the City Hall LRT subcommittee meeting, and made a
PowerPoint presentation in front of city council and mayor Fred at their previous LRT sub-committee meeting (from
meeting agenda at City Hall document storage website, click on my name "Mark Rejhon"):
We also have a different upcoming presentation planned for the Sherman Hub neighborhood community meeting we've been invited to (and other hubs we get invited to), including a workshop where residents are able to crayon comments/suggestions onto
2011 LRT plan printouts which also has parallel neighborhood revitalization initiatives along the LRT corridor such as sidewalk trees, wider sidewalks, curb bumpouts, etc.
Other groups are doing parallel work (e.g. Keanin Loomis, for businesses) and we collaborate with them too; for example businesses that expressed construction concern along the corridor, etc.
There are many other things we are currently doing, reaching out to new groups, plus having attended every single
Hamilton Citizen Jury public event (while we are not Jury members, we have attended their events and engaged). We were also invited to man the extended demo LRT exhibit in front of city hall, for one day, with our custom Hamilton LRT T-Shirts with our logo, etc.
Feel free to join by following us on Twitter/Facebook.
Retweet, share, contact us, link us with other people, etc.
We now have many connections to both City of Hamilton and Metrolinx, so we're able to pass information to them via multiple channels now for due consideration. And we are always recruiting new additional volunteers too, ranging from artwork, web designers, brainstorming, flyer deliveries, new connections, etc. Get familiar with us;
plus read my massive GO train articles on RaiseTheHammer -- big-time transit enthusiasts are welcome to get in touch!
As residents, let's prevent costly mistakes in the construction of Hamilton LRT. Join us!
Cheers
Mark Rejhon
Leader, Hamilton LRT citizen advocacy run by local residents.
Twitter:
@ham_LRT / Facebook:
HamiltonLRT