HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #2001  
Old Posted Jan 23, 2016, 10:14 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2002  
Old Posted Jan 23, 2016, 10:33 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Wow!
__________________
Follow me on Twitter - @Fisher_Account for Calgary construction and development updates
Reply With Quote
     
     
  #2003  
Old Posted Jan 23, 2016, 10:53 PM
tomthumb2's Avatar
tomthumb2 tomthumb2 is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 682
^^^ Thanks for sharing Chad! Are those confirmed or mostly proposals?
Reply With Quote
     
     
  #2004  
Old Posted Jan 23, 2016, 11:12 PM
*Stardust* *Stardust* is offline
Registered User
 
Join Date: Apr 2012
Location: Alberta
Posts: 1,062
Wow! thank you

INK looks great. Rivertwin is awful, awful, awful. They look like they belong somewhere in Auburn bay. At least the brown building beside it is more dense and has a more urban feel to it. Too bad they are condos because they need to redo that building.
Reply With Quote
     
     
  #2005  
Old Posted Jan 24, 2016, 9:50 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
They are all official proposals or under construction. I believe Riverhouse is on hold indefinitely.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2006  
Old Posted Jan 25, 2016, 2:31 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,652
Quote:
Originally Posted by Chadillaccc View Post
They are all official proposals or under construction. I believe Riverhouse is on hold indefinitely.
I am okay with Riverhouse being on hold as long as XYC M2 parcel goes through!

The new Ink renderings are looking great!
Reply With Quote
     
     
  #2007  
Old Posted Jan 25, 2016, 3:12 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
In fact, 2 of the 5 proposals I posted there will be starting for sure this year, 1 is already under construction, and there's potential for a third (the XYC development) to start this year as well.

The way I see it, the XYC development has a chance to go through this year due to the nature of the building itself. The entire main floor will be restaurants, easy to lease in that area of the city even in a down economic climate. The 2nd and 3rd floors are boutique office space, perhaps not "easy" to lease but in this iconic location and in such a stunning building, a small firm could easily fill that space if they start leasing soon. While the 4th floor is one single condo. I'm not sure if they'd be able to sell such an expensive place in that climate but I'm sure rich people are still looking at downtown even in this climate, all it takes is one. There's definitely hope for this one, this year or next.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2008  
Old Posted Jan 25, 2016, 5:48 AM
CCF's Avatar
CCF CCF is online now
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,532
I wouldn't expect XYC to get going this year. Of course anything is possible, but don't think we will see/hear much on this moving forward in the immediate future.
Reply With Quote
     
     
  #2009  
Old Posted Jan 26, 2016, 2:56 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I'm hopeful for it just because how small it is, but yeah perhaps not this year. Not a big deal though, considering everything else EV has on the go for this year
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2010  
Old Posted Jan 26, 2016, 5:55 AM
christmas christmas is offline
Registered User
 
Join Date: Oct 2015
Location: Vancouver
Posts: 367
Quote:
Originally Posted by The Fisher Account View Post
Updated 2016 East Village overview:

Video Link
Cool video! What's the name of the project featured in between 1:16 and 1:40?
Reply With Quote
     
     
  #2011  
Old Posted Jan 26, 2016, 6:06 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by christmas View Post
Cool video! What's the name of the project featured in between 1:16 and 1:40?
There is no proposal for that block. That entire part of the video is conceptual. That is what planning has mandated that a developer put there though, like the pedestrian mall section and the plaza along the Riff.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2012  
Old Posted Jan 26, 2016, 6:25 AM
Colin's Avatar
Colin Colin is offline
Registered User
 
Join Date: Aug 2007
Location: Calgary
Posts: 364
The XYC project is actually my favourite proposal at the moment. I love the simplicity of the design and how well it fits in the location. It will be a great addition to the already changing Confluence Way and will bring lots of new activity into that area. I really hope it can start soon, but as others have mentioned, I'm not holding my breath.
Reply With Quote
     
     
  #2013  
Old Posted Jan 26, 2016, 6:58 AM
christmas christmas is offline
Registered User
 
Join Date: Oct 2015
Location: Vancouver
Posts: 367
Quote:
Originally Posted by Chadillaccc View Post
There is no proposal for that block. That entire part of the video is conceptual. That is what planning has mandated that a developer put there though, like the pedestrian mall section and the plaza along the Riff.
That would be very nice. Looking forward to what they will propose there. Thanks for the info!
Reply With Quote
     
     
  #2014  
Old Posted Jan 26, 2016, 5:28 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Glass going up at the EV Hilton:

__________________
Follow me on Twitter - @Fisher_Account for Calgary construction and development updates
Reply With Quote
     
     
  #2015  
Old Posted Feb 23, 2016, 9:36 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Looks like phase 2 of N3 might start this yr too. Ink by Batistella should break ground too but i believe they're not part of the CMLC managed areas.

Quote:
We will continue to work with our media and community partners to keep
stakeholders well informed about all of our new and ongoing projects. This
will include updates on the many East Village projects expected to break
ground in 2016: RioCan’s Shops at East Village; the ALT Hotel by Groupe
Germain Hospitalité and Homes by Avi; ‘The Hat’ by Cidex Developments;
FRAM+Slokker’s Verve 1; and, pending successful permitting, phase 2 of
Knightsbridge Homes’ N3 project, Velo
.
http://static1.squarespace.com/static/54...BusinessPlan_update2016_Single+Pages.pdf
Reply With Quote
     
     
  #2016  
Old Posted Feb 24, 2016, 2:47 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
That's awesome. I'm anxious to see if they've improved on the design of N3.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2017  
Old Posted Feb 24, 2016, 4:07 PM
Cyric Cyric is online now
Registered User
 
Join Date: Apr 2014
Location: Calgary
Posts: 89
Quote:
Originally Posted by Spring2008 View Post
Looks like phase 2 of N3 might start this yr too. Ink by Batistella should break ground too but i believe they're not part of the CMLC managed areas.
You're right about Ink not being part of the CMLC managed areas. I was happy to see though that per page 44 of the report that they are working with the other developers in the East Village to work towards a complete neighbourhood.


Quote:
In 2016, CMLC will seek to engage with developers of nearby projects to
understand their impacts, if any, on the East Village master-plan vision and
land strategy; to seek alignment of philosophy and continuity of messaging;
and to identify synergies and opportunities for mutual benefit.
Our targets include Great Gulf – developer of two condominium towers at
4th Avenue and Macleod Trail SE and the new owner of an entire city block
at 320 5th Avenue SE (purchased from YWCA of Calgary in November 2015)
– and private land owners within East Village who are now activating their
parcels with mixed-use projects: Copez Properties Ltd., which owns Block 38;
Calgary Board of Education, which owns land at 6th Street and 7th Avenue
SE; and Battistella Developments at 535 8th Avenue SE.
Reply With Quote
     
     
  #2018  
Old Posted Feb 25, 2016, 12:22 AM
J-D J-D is offline
Registered User
 
Join Date: Mar 2010
Posts: 231
Loblaws site will likely be happening soon, monthly parking terminated as of March 31.
Reply With Quote
     
     
  #2019  
Old Posted Feb 25, 2016, 12:47 AM
O-tacular's Avatar
O-tacular O-tacular is offline
Fake News
 
Join Date: Jul 2008
Location: Calgary
Posts: 26,213
Ink looks a lot better in those newest images. Not sure if it's changed at all or if it's simply different angles and colour.

I was actually in EV today and noticed a building I'd never seen before. It's nothing fancy but there is a white Art Deco building that looks about 2 floors right beside that fugly concrete parkade right next to the lrt tracks. Anyone know what it is? Hopefully they manage to keep it as these small character buildings add a bit of grit and interest to all the shiny new glass towers,
Reply With Quote
     
     
  #2020  
Old Posted Feb 25, 2016, 5:19 AM
CCF's Avatar
CCF CCF is online now
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,532
Quote:
Originally Posted by J-D View Post
Loblaws site will likely be happening soon, monthly parking terminated as of March 31.
Rio Can will begin construction this spring.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.