Quote:
Originally Posted by yaletown_fella
The problem is dedicated LRT lanes will still be effected by road construction. It seems there's some utilities or road maintenance related construction several times a year on every given arterial in Toronto. Not to mention, road accidents.
The scarborough RT travels at 80km/hr. Im pretty sure the LRTs have to obey speed limits and travel at 60km/hour (average 50km/hour on a good day). So overall, it will be minimum 35% slower than an aboveground RT.
Not building an extensive Vancouver style automated RT system will go down as one of the biggest mistakes in Toronto's history.
|
The recent LRT project in Edmonton has become the poster child for a failed LRT project. Instead of bringing the best of two worlds together, it has brought the worst (slower than a bus, less flexibility, increased traffic congestion, and and still cost over 600 million dollars).
There are some projects that do fit at grade LRTs, but far far far to many rapid transit projects in NA recently have been built as at grade LRTs.
Like many other urban fads, I feel this one too will be reflected upon poorly in the future.
I can understand why Edmonton and Calgary used this technology for their initial lines (population was well under 1 million people) and Edmonton actually did a great job of it (underground downtown) but once cities are in the millions using a variety of grade separated metros (RT or LRT), commuter rails, and BRTs is far superior than just using LRT for everything.
Just my opinion, but i wish Canadian cities were going towards more grade separation for urban rail rather than less....
Happy the LRT bug has not bitten Vancouver....so far (watching you Surrey).