HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario


Reply

 
Thread Tools Display Modes
     
     
  #361  
Old Posted Dec 21, 2015, 3:06 AM
manny_santos's Avatar
manny_santos manny_santos is offline
Registered User
 
Join Date: Jul 2006
Location: New Westminster
Posts: 5,145
Quote:
Originally Posted by haljackey View Post
Tackling the 400/401 interchange in SimCity 4. Still some work to do but I got the connections done.

Location: https://www.google.ca/maps/@43.7169943,-79.5163695,16.63z

I've never used any SimCity version newer than 2000 - can you also build an interchange like the 401 at Allen, where a TTC line runs right through the interchange?
Reply With Quote
     
     
  #362  
Old Posted Dec 21, 2015, 3:49 AM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,489
Quote:
Originally Posted by manny_santos View Post
can you also build an interchange like the 401 at Allen, where a TTC line runs right through the interchange?
Yep it's certainly possible, might be another project down the road, along with 401/427 and 401/404/DVP
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #363  
Old Posted Dec 21, 2015, 2:05 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,825
How long does it take you to do one of these?
Reply With Quote
     
     
  #364  
Old Posted Dec 21, 2015, 8:33 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,489
Quote:
Originally Posted by sonysnob View Post
How long does it take you to do one of these?
On and off maybe about 4 hours. I still have some 'eyecandy' work to do such as lane markings, signs, lighting, beautification, etc.

Edit: here's my first session sped up of course
• Video Link


Edit 2: it's done:


Full size:
https://c1.staticflickr.com/1/779/23269149944_398dc3de30_o.jpg
__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Dec 22, 2015 at 4:22 AM.
Reply With Quote
     
     
  #365  
Old Posted Dec 27, 2015, 3:47 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
Just finished a trip to New Brunswick, which involved plenty of 401 driving.

The widening project in Kingston to the Caterqui River Bridge appears 100% complete now.

The Cobourg construction has wrapped up for the winter, with few signs of construction. All lanes have returned to a regular white, with all embankment work complete as far as I can tell. It looks like work is still going on for the interchange reconfigurations though.
Reply With Quote
     
     
  #366  
Old Posted Jan 1, 2016, 8:15 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,825
Construction continues to widen the eastbound collectors through Avenue Road. The principal work that remains is rehabilitation of both the Bathurst Street and Wilson Avenue underpasses.





Reply With Quote
     
     
  #367  
Old Posted Jan 2, 2016, 2:30 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,884
I love how quiet MTO is about their small widening projects along the central 401.. its almost like they stick them under rehabilitation work to not arouse suspicions of journalists and environmentalists, and politicians don't say anything about it. Adding a lane to any other highway in ontario, and a big deal is made.
Reply With Quote
     
     
  #368  
Old Posted Jan 2, 2016, 3:17 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,825
^ Yeah, for the same reasons, it's easy to forget just how much has been done to the 401 over the years as well.
Reply With Quote
     
     
  #369  
Old Posted Jan 3, 2016, 4:35 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,489
So 401 EB collectors will have 4 lanes through here? Odd how the WB collectors only have 2 just a little east of here, yet the WB 401 typically moves better than EB 401.

I guess squeezing in an extra lane on a 12+ lane highway isn't a huge cause for concern. No additional right of way is being required, and if construction is underway, you may as well kill two birds with one stone by rehabilitating and widening the road within one project.

I was under the assumption that any additional widening work on highways with more than 4 lanes in each direction also need a HOV lane built, but I guess the 401 is a special exception since building one would mean overpasses with support coulombs between the express and collector lanes would have to be rebuilt, not to mention the median separating collector/express would have to be moved/rebuilt.

-----

I have a few ideas of where an additional lane to the 401 could be squeezed in and could really help traffic.

-EB express between the 400 exit and the basketweave exit. 4 WB express lanes were squeezed through the 400 interchange, and I think 4 EB lanes get under the structures too.

-EB between Dixon Road and express/collector split at 409. Widening to 6 lanes will allow 3 lanes to go to collectors instead of 2. This is a big choke point for the highway. The new collector lane would run to Weston Road where it becomes a dedicated exit lane. It could continue if the EB collector bridge over the Humber River is expanded/replaced.

-WB collectors between Yonge Street and Avenue Road. There are only 2 'through lane' collectors here. Cannibalizing the left shoulder can squeeze in an additional lane.

-3 WB exit lanes to 400. Not adding a through lane here, but would help minimize weaving for cars trying to get from the express lanes to the 400 via the basketweave. The third exit lane would become the default lane for the 400 SB connection. (For an example see my image of the 400/401 junction in SimCity 4 in an earlier post on this page or click HERE.)

-EB express between 'the transfer' and Eglinton Avenue. This would be a tight squeeze and would cannibalize the left shoulder. Widening this from 4 to 5 lanes would give traffic more space to eventually merge under the 427 (4 lanes), and the new lane would be a dedicated exit at Elginton.

-Both directions between Brock Road and Westney Road. For now it would be a an auxiliary lane running between the on and off ramps, and later it could become a third collector lane if the Brock Road overpass is expanded or replaced.
__________________
My Twitter

My Simcity Stuff

Last edited by haljackey; Jan 3, 2016 at 4:57 PM.
Reply With Quote
     
     
  #370  
Old Posted Jan 7, 2016, 12:51 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,825
More reconstruction work is scheduled for the 401 in western Chatham Kent in the coming years:

Quote:
5. MTO District/Highway/Bridge Site #:
District:
Highway: 401
Bridge Site #: 6-51/1, 13-398/C, 13-187/1, 13/188-1, 13-190/1, 13-55/1, 13-55/2, 13-400/C, 13-152/2, 13-227/2, 13-228/2, 13-229/2
Other:


6. Project Length/Location:
from Merlin Road, easterly to 0.68 km east of Bloomfield Road, Westbound lanes) and from 1.0 km east of Essex Road 42 to 0.16 km east of Drake Road (eastbound lanes)


7. Project Type (Category):

Construction Administration


8. Specialties Required:

Construction Administration - High Complexity


9. Description of Project:
This assignment is for Construction Administration Services, including Quality Assurance Field Testing, for Contract 2016-3001. The work on the project includes reconstruction of highway 401 westbound and eastbound lanes and rehabilitation of bridges and culverts. The work also includes grading, concrete paving, hot mix paving, granular base and electrical.


10. Assignment approximate start and completion dates:
Pre-contract engineering phase: N/A
Construction administration phase: (tentative timing) April 2016 to May 2018
Reply With Quote
     
     
  #371  
Old Posted Jan 11, 2016, 2:48 AM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,649
Thanks for all the updates. This thread may very well be the best 401 information resource on the web.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #372  
Old Posted Jan 13, 2016, 4:24 AM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,489
Highway 401 - virtually empty on New Years morning

• Video Link
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #373  
Old Posted Jan 13, 2016, 2:06 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,649
Quote:
Originally Posted by haljackey View Post
Highway 401 - virtually empty on New Years morning

• Video Link
what a joy it is to drive the 401 on .001% of occasions when the highway is like this.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #374  
Old Posted Jan 13, 2016, 2:09 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,649
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #375  
Old Posted Jan 18, 2016, 1:19 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,825
MTO is in the process of initiating preliminary design for the replacement of the Grand River Bridges along Highway 401 in Kitchener. This work would be done as a pre-cursor to any further interchange improvements at the nearby Hwy 8 interchange:

Quote:
Section 11: Terms of Reference – Project Specific
11.1 Intent of this Assignment
This Assignment includes the preliminary and detail design and environmental assessment for the
structural replacement of the Grand River Bridges on Highway 401 located west of Highway 8 in the
Regional Municipality of Waterloo. The Assignment also includes preliminary and detail design and
environmental assessment of the design of structural rehabilitation of King Street Overpass structure and
adjacent highway widening work to accommodate traffic staging.
The Study Limit of the assignment is within Highway 401 corridor between Station 10+800, which is
located (1) km west of Highway 401 and Homer Watson Blvd Interchange to Station 16+400, which is
located 1.5 km east of Highway 401 and Highway 8 N-E Ramp intersection. However, the construction
limit of the project can be shorter in length between the above stated limits.
A more detailed description of the project scope and related requirements are set out in Section 16 and
Section 17 of this RFP.
The project data/plans are posted with the RFP which constitute part of the Reference documents and
consist of the documents listed within Section 16 and Section 17 of this RFP.
This Assignment is open to firms approved in RAQS under Bridge Engineering Specialty.
Quote:
Section 12: Project Scope
The Terms of Reference for the Project Description shall become Schedule 1 to the TPMA.
This Assignment involves Preliminary Design, Detail Design, Environmental Assessment and Design
Support during tendering and Construction for the Grand River Bridge Replacement project. The following
table summarizes the structural replacement, rehabilitation and highway widening works:

LOCATION:
Grand River Bridge EBL Structural Replacement
3080-12-02 13+800 164-401/17-0 14+500 164-401/17-0 700 m

Grand River Bridge WBL Structural Replacement
3080-12-03 13+800 164-401/17-0 14+500 164-401/17-0 700 m

King Street Overpass Structural Rehabilitation
3080-12-04 17+300 164-8/31-0 17+900 164-8/31-0 600 m

Highway 401 WBL Highway Widening
10+800 164-401/7-0 16+400 164-401/23-0 5600 m

Highway 401 EBL Highway Widening
10+800 164-401/7-0 16+400 164-401/23-0 5600 m

All aspects of this project will be divided into two phases, Preliminary Design and Detail Design. The TPM
Service Provider shall not proceed to Detail Design phase of the project without the written approval from
the Ministry’s TPM Service Administrator.

In addition, the scope of work shall also include:
  • Review of traffic operations of Highway 401 for the existing and interim condition
  • Prepare the Highway Occupancy Vehicle (HOV) Lane needs and implementation strategy through project limits
  • Determine the need for various entry and exit ramp alignment modifications to and from Highway 401 to Highway 8 and King Street
  • Utility relocations and utility management plans
  • Design and plans for temporary utility supports
  • Traffic staging and detours to facilitate construction staging
  • Enhanced stakeholder and public consultation
  • Temporary construction access plans
  • Permanent illumination and traffic signal plan
  • Temporary illumination and traffic signals for construction staging as required
  • Temporary and Permanent erosion and sediment control measures through all stages of construction
This work is scheduled to be completed at the end of November 2018, with tendering for construction to follow.
Reply With Quote
     
     
  #376  
Old Posted Jan 19, 2016, 2:41 AM
manny_santos's Avatar
manny_santos manny_santos is offline
Registered User
 
Join Date: Jul 2006
Location: New Westminster
Posts: 5,145
What's happening with the 401 eastbound in Mississauga? I've noticed since sometime last year it has been 2 lanes eastbound in the express lanes for one section. I sure hope it's meant to be temporary but it looks kind of permanent. It's a real bottleneck the times I've used it and at least one time I've used the 407 just to avoid it.
Reply With Quote
     
     
  #377  
Old Posted Jan 19, 2016, 4:28 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Briefly crossed the Montreal Street overpass of Highway 401 in Kingston the other day. It looks like the 6-laning between Montreal Street and Highway 15 is now complete. If so, it's over a year before the signs claimed it would be finished.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
Reply With Quote
     
     
  #378  
Old Posted Jan 20, 2016, 3:07 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by 1overcosc View Post
Briefly crossed the Montreal Street overpass of Highway 401 in Kingston the other day. It looks like the 6-laning between Montreal Street and Highway 15 is now complete. If so, it's over a year before the signs claimed it would be finished.
Nope, stops short of 15. The bridge over the Cataraqui is where is stops. So they still have to rehab/replace that bridge before they can go 6 to 15. Then they will have the issue of widening the underpass of 15. Probably do the same thing that they did for Montreal road.
Reply With Quote
     
     
  #379  
Old Posted Jan 21, 2016, 3:23 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by MoreTrains View Post
Then they will have the issue of widening the underpass of 15. Probably do the same thing that they did for Montreal road.
Is that actually happening? I was under the impression that going east, the third lane will exit at the 15 offramp, and going west, the third lane will start right after the overpass, thus needing no replacement of the 15 overpass.

Just like how when the 417 was widened in Ottawa last year from 174 to Nicholas, the Nicholas overpass wasn't touched as the widening stopped just short of it.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
Reply With Quote
     
     
  #380  
Old Posted Jan 21, 2016, 3:29 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by 1overcosc View Post
Is that actually happening? I was under the impression that going east, the third lane will exit at the 15 offramp, and going west, the third lane will start right after the overpass, thus needing no replacement of the 15 overpass.

Just like how when the 417 was widened in Ottawa last year from 174 to Nicholas, the Nicholas overpass wasn't touched as the widening stopped just short of it.
I was more trying to say the widening hasnt been done all the way to the on/off ramps at 15.

But I am assuming in the future the 15 bridge will be replaced and widened to widen the 401 to the Husky at least.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 10:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.