Quote:
Originally Posted by Future Mayor
One issue with the 9-line Streetcar or Trax is the tracks that run adjacent to I-15 on the east side. A Trax line or Streetcar line cannot cross those at grade, so a tunnel would have to be constructed to cross those. That is a huge expense, most likely more than the entire cost to construct the remainder of the line from W 9th/9th to 9th/9th.
To get under those tracks would involve not only going under the UP/FR tracks, but going under I-15, and there is a vast amount of I-15 bridge supports in that section. So while I'd love to see it, I don't see it happening for a very very long time, and I would estimate that the allowable densities at W 9th/9th would have to be really high in order to even come close to justifying the expense. 
|
While it could be expensive, I think it would be worth the cost to connect the East and West sides of the city together.
It would be good if there were connections at 6th North, North Temple (Existing), 8th/9th South (9th South until 5th East then north to 8th South to continue west), and 17th South.
The lines would go East/West as follows:
6th North - 2200 West to 4th West (Loops to North Temple E/W Trax)
North Temple - Existing
8th/9th South - Redwood Road (Indian Ave) on the west to 13th East (9th South).
17th South - Redwood on the west to Foothill on the East. This could also be extended north and then east on Sunnyside.
For the lines that end at Redwood, they could be extended North to meet at 6th North. This would create multiple loop options.
There would be multiple North South connections but these could be the main East/West routes outside of downtown.
It would also take 50 years I think for the densities to increase to the point where some of these would be worth the expense.
I do think an 8th/9th south line would be worth the expense now though as it would be a great bridge for the community.
My estimate for total cost for all 3 lines as a streetcar is around $1.5 Billion (includes multiple tunnels/bridges for rail crossings).
My estimated ridership breakdown is based on all lines being complete:
Opening (2025 est): 12,000 daily
5 years (2030): 15,000 daily
10 years (2035): 25,000 daily
20 years (2045): 45,000 daily
30 years (2055): 55,000 daily
These numbers allow for gradual density increases along the lines to account for population growth and economic growth along the lines.
Just a dream for now but a dream within the realm of reality.