  #1721  
Old Posted Dec 19, 2015, 4:18 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,022
Thanks for the updates as always!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #1722  
Old Posted Dec 21, 2015, 9:07 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Great pics, thanks!
Reply With Quote
     
     
  #1723  
Old Posted Dec 21, 2015, 11:36 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,724
Thanks for the thorough update, McMinsen.

I had to chuckle at this photo, as it looks like the guy in blue in the staircase is looking straight at you.

Quote:
Originally Posted by mcminsen View Post
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #1724  
Old Posted Dec 30, 2015, 3:23 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
Metrotown Station progress from earlier today.
Reply With Quote
     
     
  #1725  
Old Posted Jan 4, 2016, 9:42 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Thanks, here's a couple pics by me January 2nd:



Reply With Quote
     
     
  #1726  
Old Posted Jan 5, 2016, 7:13 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
Quote:
Originally Posted by Katherine S View Post
I don't know if this has already been discussed, but I thought I'd add it in case; Surrey has a proposal out now for the north end of the Surrey Central SkyTrain station. This has come out of their December planning reports

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0361-00.pdf

Also if you take a look at the overall site plan, they have listed on the right side "Future South Station-House" with a similar outline to the new North House at Surrey Central.

So they will eventually be redoing that side near the current bus-loop. They also have "future development" building attached to the Station looking like the new station will be more integrated with whatever building is put in place of the North Surrey Rec Center once they start to bring down the ice sheets and building in the next 5-10 years.

Page L1.1 in the above planning report.

Also of note from the project architect:

Quote:
The project aims to formalize a new north station house and the long term plan is to have a south station service in from buses dropping people off and the north station for people transferring out on to buses.
So the idea is to redesign Surrey Central station eventually to have 103 AVE act as a bus route pickup so people from SkyTrain -> Buses, and the 103A Ave to South where the currnet bus loop is eventually be designed to be Buses -> SkyTrain drop off.
Reply With Quote
     
     
  #1727  
Old Posted Jan 5, 2016, 9:31 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
I wonder if that would work in practice, though, since buses may bunch up (i.e. the 2nd bus in line offloads faster than a more crowded bus that's 1st in line. So the 2nd bus has to wait before it can pull ahead to load?)
Reply With Quote
     
     
  #1728  
Old Posted Jan 5, 2016, 10:41 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
no surprise here but looks like the Metrotown project is behind schedule already.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #1729  
Old Posted Jan 6, 2016, 5:45 AM
tonyvan tonyvan is offline
Registered User
 
Join Date: May 2013
Posts: 16
Any progress or news about Joyce Station?
Reply With Quote
     
     
  #1730  
Old Posted Jan 7, 2016, 2:35 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,110
Last I saw about two weeks ago nothing had changed at the station besides some blue fencing.
Reply With Quote
     
     
  #1731  
Old Posted Jan 7, 2016, 3:21 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
The construction happening right now is strictly drainage. They have removed the wooden retaining wall, installed some drainage, and built a concrete wall. Work is progressing slowly, but it will probably be done by the end of January. Hopefully there is no overlap and demolition of this latest work required when they re-do the station. Although knowing bureaucracy, the odds of this happening are pretty high.
Reply With Quote
     
     
  #1732  
Old Posted Jan 7, 2016, 5:07 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,110
Drainage on that end has always been awful. There's basically a swamp where the old rail ROW is.
Reply With Quote
     
     
  #1733  
Old Posted Jan 8, 2016, 7:26 AM
tonyvan tonyvan is offline
Registered User
 
Join Date: May 2013
Posts: 16
Quote:
Originally Posted by Spork View Post
The construction happening right now is strictly drainage. They have removed the wooden retaining wall, installed some drainage, and built a concrete wall. Work is progressing slowly, but it will probably be done by the end of January. Hopefully there is no overlap and demolition of this latest work required when they re-do the station. Although knowing bureaucracy, the odds of this happening are pretty high.
Thanks for the updates. So any idea of when the actual station upgrade will begin? Translink's website still says a 2016 completion date....
Reply With Quote
     
     
  #1734  
Old Posted Jan 9, 2016, 6:03 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
Quote:
Originally Posted by MIPS View Post
Drainage on that end has always been awful. There's basically a swamp where the old rail ROW is.
Biodiversity?

No idea when construction will begin, let alone end. They only just finished consultations embedded in the Joyce Station area plan in mid-December. Strikes me as odd that all of that work could be completed within 12 months (including second elevator, platform roof extension, extended east station house).
Reply With Quote
     
     
  #1735  
Old Posted Jan 9, 2016, 6:48 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
I think 18 months to 2 years is a better estimate.
I believe the federal government funding deadline is 2017. So I would be very happy if the project is completed by end of 2017.

From Translink's FAQ

Quote:
What is the schedule for the project?

The overall project schedule is determined by government funding deadlines, and includes the following milestones for the upgrades to the east stationhouse:

Design – complete by summer 2015
Construction Phase – summer 2015 to winter 2016 (under two years)

The project schedule is subject to change.
Reply With Quote
     
     
  #1736  
Old Posted Jan 11, 2016, 12:04 AM
tonyvan tonyvan is offline
Registered User
 
Join Date: May 2013
Posts: 16
Quote:
Originally Posted by Waders View Post
I think 18 months to 2 years is a better estimate.
I believe the federal government funding deadline is 2017. So I would be very happy if the project is completed by end of 2017.

From Translink's FAQ
Oh I saw a new board today at Joyce saying construction time is Early 2016 to Fall 2017. I will take a picture next time.
Reply With Quote
     
     
  #1737  
Old Posted Jan 11, 2016, 3:23 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by tonyvan View Post
Oh I saw a new board today at Joyce saying construction time is Early 2016 to Fall 2017. I will take a picture next time.
Yup, I saw that too today. The board advertises the project federal funding source, Canada's Economic Action Plan. It must have been erected only in the last few days.

Photo I took today.

Last edited by Waders; Jan 11, 2016 at 3:50 AM.
Reply With Quote
     
     
  #1738  
Old Posted Jan 11, 2016, 3:54 AM
tonyvan tonyvan is offline
Registered User
 
Join Date: May 2013
Posts: 16
Quote:
Originally Posted by Waders View Post
Yup, I saw that too today. The board advertises the project federal funding source, Canada's Economic Action Plan. It must have been erected only in the last few days.

Photo I took today.
Thanks for the photo. This is great!
Reply With Quote
     
     
  #1739  
Old Posted Jan 11, 2016, 6:18 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
Quote:
Originally Posted by officedweller View Post
I wonder if that would work in practice, though, since buses may bunch up (i.e. the 2nd bus in line offloads faster than a more crowded bus that's 1st in line. So the 2nd bus has to wait before it can pull ahead to load?)
They'll have their own bays and I'd imagine the schedules should be staggered enough such that this would be a rarity. That said I guess we'll see how it actually turns out. We're still a ways away from them building the South portion, probably 5+ years in my estimate.
Reply With Quote
     
     
  #1740  
Old Posted Jan 14, 2016, 3:54 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
As part of the station upgrades at Metrotown station, work needs to be done to strengthen the platform.

Because of this, SkyTrain will be single tracking at this station as well as Patterson.

Work is scheduled for January 17 to January 28, Sundays through Thursdays from 9pm until the end of service.
Buzzer Blog

Strengthen the platform?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.