Quote:
Originally Posted by 65MAX
How is it possible that the Yard didn't do an energy code analysis? BDS requires that for every new building, including SFRs. Even if it's just a simple prescriptive path analysis, you still can't get a permit without it.
Also, FWIW, I think this building is turning out great. Will it look EXACTLY like the renderings all of the time? Probably 99% of the time, no. But you can say that for ANY new building. The renderings are created with the best possible lighting and the optimum vantage points to sell the product to the lenders and future tenants. And quite frankly, a few of the pics posted by photogeric and Marling look amazing. Thanks for those. I think that having a building that changes with different lighting conditions is a good thing, but I must be in the minority here.
|
I have been resisting commenting, but I have been through the process being discussed here. Yes you could make it through design review without having completed an energy study. BUT you shouldn't be showing the design commission WHAT you are not certain you could build(.) slight changes are expected and can be worked out with staff. Big changes to the fienestration pattern with this building would have certainly caused an additional hearing...especially with this building being so relient on the solid and void patterning of the facade to make it less than a dark slab rotated on the grid.
So one of two scenarios happened here...neither which is great for the architect or owner.
You changed the drawings submitted for permit and the plans examiner did not pick up the discrepancy between the approved DR set and the permit set. Is possible given all the movement in the facade patterning. What a job to have to cross check that. The examiner would not have signed off without resolving the discrepancy.
Second option is you are building off drawings that does not match your permit documents being held in the job office. Less likely and ultimately would require some set to facilitate coordination. It also assumes that the on site inspector does not pick it up.
So what is the stick the city would have if they sidestepped the system? Nothing that I am aware of. The least should be that of the reputation of the ones responsible from trying to doup the system. I think this in the end could show serious negligence from the architect. Such a prime gateway site. The city should be pretty upset to have let this happen. Maybe too much reliance on an eager design firm without the record of experience in more complicated building types. A shame..we can wait and hope the building weathers into something pleasing. It will set up a nice backdrop for the quirky dumb bell project.