  #2661  
Old Posted Dec 18, 2015, 3:50 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
Quote:
Originally Posted by jeremy_haak View Post
Are those concrete pads supposed to be the platforms? And are those rods eventually going to be part of a slab for a concourse level?
It's top secret, but RTG is going to give us a retro heritage transit system

     
     
  #2662  
Old Posted Dec 18, 2015, 4:13 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,817
I can't wait for the horse trams.
     
     
  #2663  
Old Posted Dec 18, 2015, 6:38 PM
eemy's Avatar
eemy eemy is offline
 
Join Date: Aug 2006
Posts: 4,425
I wonder how bad the greenhouse gas emissions are with horse trams.
     
     
  #2664  
Old Posted Dec 18, 2015, 10:15 PM
DarkArconio DarkArconio is offline
 
Join Date: Mar 2010
Posts: 182
Quote:
Originally Posted by jeremy_haak View Post
I wonder how bad the greenhouse gas emissions are with horse trams.
I think the methane is a pretty big issue. They put masks on sheep in New Zealand to capture it. Sheep are the biggest source of GHG emissions there.
     
     
  #2665  
Old Posted Dec 18, 2015, 10:26 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
But in a tunnel you could capture the methane and produce electricity.

The horse manure could be combined with the bull from Parliament, and used to fertilize the Experimental Farm and the Greenbelt where the horses will be kept to pasture. Totally renewable energy.
     
     
  #2666  
Old Posted Dec 19, 2015, 4:33 AM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by jeremy_haak View Post
Are those concrete pads supposed to be the platforms? And are those rods eventually going to be part of a slab for a concourse level?
Here is the construction sequence as I understand it. The station was first mined with two smaller tunnels where the concrete pads are now. Concrete pads were constructed in each tunnel and will ultimately be the base of the platforms. The middle portion was left unmined. Then holes were drilled through the unmined portion, and those huge rods run between the platform outside walls. Then the middle unmined portion was removed. This keeps the underground portion of adjacent buildings from moving around, until the rest of the station can be constructed with enough structural support so the rods can be removed.
     
     
  #2667  
Old Posted Dec 22, 2015, 6:41 PM
rocketphish's Avatar
rocketphish rocketphish is online now
 
Join Date: Feb 2009
Posts: 14,724
Residents, businesses breathe sigh of relief over Belfast Road reopening

By Erin McCracken
Ottawa South News, Dec 18, 2015


Finally.

That’s the reaction by Overbrook and Eastway Gardens residents to the reopening of Belfast Road on Dec. 18 after an 18-month wait, but five months ahead of schedule since it was originally slated to reopen in May 2016.

“I’m personally ecstatic,” said Rawlson King, president of the Overbrook Community Association “We’re very pleased because it basically reopens an important link to the Trainyards shopping district.

The road was closed for the construction of an underground light-rail line from the Belfast and Tremblay intersection to the Belfast maintenance yard where the light-rail trains will be maintained and sheltered nightly once the east-west Confederation LRT is up and running.

“We’ve had to put up with a lot of pain … with the bridge being shut down because everybody would have to detour.”

With the road’s closure in May 2014, residents living to the north of the Belfast Road overpass over Highway 417, which linked to Coventry Road in Overbrook, were forced to drive the long way around, heading south on the Vanier Parkway and cutting across via Industrial Avenue.

“Basically, it adds a lot of time to the trip, and it also put a lot of pressure on businesses in the Trainyards because it wasn’t as easy to access the Trainyards,” King said.

“A lot of people stopped going and as a result some businesses did suffer.”

The news was also welcome by Mike Ayoub, who has co-owned the White Horse Restaurant in Eastway Gardens with his wife, Rachel, for the past 17 years.

“I felt like singing and dancing the rest of the day,” he said.

The restaurant, located at the corner of Belfast and Tremblay, had been caught in the middle of the LRT construction.

“It was the most stressful two years,” said Ayoub, adding that his staff hours had to be cut because business was impacted.

Now the couple is anxiously waiting to see if and when business picks back up again.

“All we can do is hope,” said Ayoub.

“Maybe to get them back is going to take a while – to get back all the customers that we had,” Rachel Ayoub added.

City officials, including Mayor Jim Watson and Alta Vista Coun. Jean Cloutier, joined Antonio Estrada, chief executive of the Rideau Transit Group, along with a few local residents and project leads for a low-key ribbon cutting at the corner of Belfast and Tremblay roads on Dec. 17, the day before Belfast officially reopened.

Stephane Robert, senior engineer in the city’s rail implementation office, said the road’s early reopening can be attributed to the unseasonably warm winter, allowing paving and street-line painting to be completed in a timely manner.

The scope of the construction project was massive, with workers digging nine metres down to create an underground rail tunnel that forks east and west below the intersection. The new LRT connection also had to be constructed under a Via Rail line in the area.

“They had a big water main they had to put it under the tunnel, under the split,” Robert said. “So this was a lot of work.”

Tracks inside the tunnel will be laid beginning in January, eventually connecting to the east LRT line that will link to Blair Station and a westerly connector that will hook up the line that continues on to a stop at Tremblay Station.

The reopening of Belfast also marks the unveiling of a new paved multi-use pathway that runs along the west side of the road.

“It’s easy to get to the Adàwe Crossing,” Cloutier said, referencing a newly opened pedestrian and cycling bridge over the Rideau River that links Donald Street and Somerset Street East.

“The community has put up with a lot of disruption with this construction,” he added. “It’s just the light at the end of the tunnel for the community.”

http://www.ottawacommunitynews.com/news-...h-of-relief-over-belfast-road-reopening/
     
     
  #2668  
Old Posted Dec 27, 2015, 6:51 AM
Admiral Nelson Admiral Nelson is offline
 
Join Date: Jun 2009
Posts: 519
Workers reach final stretch in LRT tunnel

By Jon Willing, Ottawa Sun

First posted: Friday, December 25, 2015 10:49 PM EST | Updated: Friday, December 25, 2015 10:54 PM EST


Humberto Ferrer and his team can almost see the light at the end of a 2.5-kilometre tunnel in downtown Ottawa.

"The morale is very high," Ferrer, the deputy director of the Rideau Transit Group, told the Sun.

"The people are very excited. We're very close to completion. We're in the last six months of excavation and everybody is very motivated."

Just 600 metres more to go and the LRT tunnel between Lebreton Flats and the University of Ottawa will be excavated. It will be a big milestone for Ferrer and workers with RTG, which is the city's contractor on the $2.1-billion rail system, the largest infrastructure project in Ottawa's history.

The 12.5-km Confederation Line LRT is scheduled to open in spring 2018.

The last leg of tunnel to be mined is between the future Parliament and Rideau stations.

The tunnel between the west portal, just west of Bronson Ave., and Parliament station, around O'Connor St., has been carved. Workers are mining the station at Parliament. On the other side of the Rideau Canal, the tunnel between the east portal (Waller St. at Laurier Ave.) and Rideau station is excavated, with workers carving the station cavern.

Planning is already happening for the big photo opportunity, likely in June, when a roadheader tunnelling machine breaks through rock near the Sussex Dr. end of Rideau station, marking the end-to-end excavation.

There will be an earlier milestone in February when the cavern at Parliament station will be fully excavated. The tunnel machines are diving deeper under the surface as they leave the Parliament station cavern, whose roof is about 16 metres below ground. LRT passengers won't be able to fully appreciate the grandeur of the station caverns since walls, pillars and finishes will eventually fill up the cavities.

The tunnel stretch between Parliament and Rideau stations is noteworthy because mining machines will be working near the National Arts Centre and will dive below the Rideau Canal.

Gary Craig, the city's chief of LRT design and construction, said the contractor will make sure there aren't disruptions with performances at the NAC.

"We're going to be working with their schedule a little bit to try and adjust and make sure we're not doing a lot of the heavy use of the bits on the roadheader and creating a potential impact," Craig said.

While the tunnel will pass under a heritage waterway recognized by the United Nations Educational, Scientific and Cultural Organization, the city and RTG aren't required to meet any special protection measures to protect that international status.

That's because the tunnel will be nowhere near the canal. There will be 20 metres of rock between the bottom of the canal and the top of the tunnel when a roadheader starts rumbling below the waterway in April. Ferrer expects it will take seven to 10 days to pass under the width of the canal as workers dig toward Rideau station.

At about 26 metres below the surface, Rideau station will be the deepest part of the entire tunnel.

Crews are already installing tracks east of downtown and Ferrer expects they will begin laying tracks inside the tunnel next October.

The toughest part of the tunnel construction so far has been around Lyon station, Ferrer said. Workers operating the roadheaders had to be extremely precise scraping out rock next to buildings along Queen St. The buildings were a similar depth to the upper portion of the cavern and crews had to be mindful of the load transfer to the lower levels of the buildings.

"We were really mining one metre from the parking (levels)," Ferrer said.

In fact, there was one glitch in July 2014 when a couple of rock bolts used to stabilize the excavation punctured the parking garage at the Sun Life building. There was no risk to the building's integrity and RTG made the repairs.

The only other reported problem with the tunnel construction was on Waller St. when a sinkhole happened in February 2014. No one was hurt and the city chalked it up to an undetected pit of backfill.

The tunnel work started with just seven workers at the western portal. Now there are about 120 workers on different shifts 24 hours a day. They're getting a bit of a break over the Christmas and New Year's holiday period to spend time with family and friends.

While the tunnel expertise has come from international experts, many of the work hands are from the Ottawa area.

Ferrer is from Barcelona, Spain and moved his family to Ottawa in January 2013. They will be here until at least 2018 and potentially much longer, considering the city wants to extend rail in three directions by 2023.

"It's great here," Ferrer said. "It feels like home."

Twitter: @JonathanWilling

About the Confederation Line tunnel

Total span: 2.5 km

Portals: Commissioner St. near Albert St. (west); Waller St. near Laurier Ave. (east)

Built-in stations: Lyon, Parliament, Rideau

Average depth below surface: 15 metres

Tunnelling method: Sequential excavation

Mining machines: Roadheader (3)

Ground material: Limestone (previaling), clay, sands

http://www.ottawasun.com/2015/12/25/workers-reach-final-stretch-in-lrt-tunnel
     
     
  #2669  
Old Posted Dec 27, 2015, 11:55 AM
eemy's Avatar
eemy eemy is offline
 
Join Date: Aug 2006
Posts: 4,425
I stumbled across this PDF which has some detailed information about the excavation process and the stations. It seems that the rods we see in the station photos are tension ties. They are used where the station walls fall close to adjacent buildings and there is therefore a concern about weight from the overburden being transferred into their basement levels. This means that instead of mining the upper levels and then the bench, like they are able to do where they don't need tension ties, they first had to excavate the sides at the lower level, install the ties (presumably by drilling between the two sides), and then place fill in the excavated sections to allow them to mine the upper portions. Suddenly a lot of those pictures that didn't make much sense to me are coming together!

There are also some neat 3D diagrams of how Parliament and Lyon Stations will appear, with entrances and ventilation shafts and whatnot.

http://www.tunnelcanada.ca/PDFs/2015/08%...onstruction%20Update%20(Middlebrook).pdf
     
     
  #2670  
Old Posted Dec 27, 2015, 4:20 PM
Richard Eade Richard Eade is offline
 
Join Date: Mar 2008
Posts: 2,685
Thanks for sharing that link, Jeremy_Haak. Yes, the weight pushing down tries to 'flatten' the tunnel's curved roof, pushing the sides out. When there is sufficient rock on the sides, then that mass acts to transfer/distribute/counter the outward pressure. If there is insufficient strength pushing back, then other methods must be used.

Ancient cathedrals, which are build above the ground, and therefore have no natural restraints to the walls being pushed out, often used buttresses.



These ‘props’ prevented the tops of the walls from being pushed out by the force of the roof trying to flatten. Buttresses were a great way of supporting the walls while leaving the inside volume ‘clear’.

In cases where the building’s inside can have them, collar ties are used to strap the tops of opposite walls together.



These tension members counter the widening force from a domed or peaked roof. The strength of the building is now internal and requires no added width from buttresses; at the expense of internal obstruction. In the case of houses and many buildings, these collar ties are used to mount a ceiling or maybe support an additional floor.

In the tunnel, where there are foundations close to the stations, there is insufficient external rock to buttress the walls, therefore, collar ties are needed. I'm not entirely sure why this is considered an innovation in tunneling; but maybe it is new for tunneling - just not for the rest of the construction world. I expect that those ties will be permanent fixtures in the stations, perhaps used to support the upper level of the station, or a false ceiling.
     
     
  #2671  
Old Posted Dec 30, 2015, 9:39 PM
MoreTrains MoreTrains is offline
 
Join Date: Oct 2014
Posts: 858
So, does that mean they are ahead of schedule in the tunneling?
     
     
  #2672  
Old Posted Dec 30, 2015, 9:44 PM
DarthVader_1961 DarthVader_1961 is offline
 
Join Date: Jun 2009
Posts: 481
Old Subwat tunnel found

     
     
  #2673  
Old Posted Dec 30, 2015, 9:51 PM
MoreTrains MoreTrains is offline
 
Join Date: Oct 2014
Posts: 858
Damn satire. Makes sense in the context of the Cold War, but the reality is there would never have been enough money to build something like this.
     
     
  #2674  
Old Posted Dec 30, 2015, 10:47 PM
DarthVader_1961 DarthVader_1961 is offline
 
Join Date: Jun 2009
Posts: 481
Quote:
Originally Posted by MoreTrains View Post
Damn satire. Makes sense in the context of the Cold War, but the reality is there would never have been enough money to build something like this.
So its not real?
     
     
  #2675  
Old Posted Dec 31, 2015, 1:58 AM
Hybrid247 Hybrid247 is offline
 
Join Date: Oct 2009
Posts: 1,320
Quote:
Hours after the discovery, municipal workers were able to map out part of the system, which is believed to extend as far as Carp and Rockland.
LOL! Ya this is definitely bs
     
     
  #2676  
Old Posted Dec 31, 2015, 2:37 AM
concrete06 concrete06 is offline
 
Join Date: Aug 2006
Posts: 81
They took a photo from the abandoned LA subway

http://desertedplaces.blogspot.com/2013/04/the-abandoned-la-subway.html
     
     
  #2677  
Old Posted Dec 31, 2015, 2:56 AM
DarthVader_1961 DarthVader_1961 is offline
 
Join Date: Jun 2009
Posts: 481
Quote:
Originally Posted by concrete06 View Post
Ok, i got fooled
     
     
  #2678  
Old Posted Jan 8, 2016, 3:17 AM
rocketphish's Avatar
rocketphish rocketphish is online now
 
Join Date: Feb 2009
Posts: 14,724
Construction Update
Week of January 4




Utility installation in Lyon Station cavern

Lyon Station


Crews continue the installation of electrical/communication conduits, as well as the concrete pour for pre-slab.



Utility removals and general relocations at Lyon Station east entrance

Lyon Station West and East Entrance


West Entrance: soft ground excavation and lagging occur, along with line drilling. Initial work begins on the HVAC shaft with traffic control, watermain capping and piling.

East Entrance: utility relocations continue, along with general removals and preparations for concrete pouring.



Guide points for roadheader in Parliament Station cavern

Parliament Station Cavern


Chewrocka continues to mine the north drift bench and prepares for further excavation.



Reinforcing columns at Parliament Station east entrance

Parliament Station West and East Entrance


Work continues on the winter enclosures, along with utility relocations on the parking levels. Initial work on reinforcing columns begins on the parking levels.

Traffic restrictions on Queen and O’Connor streets are in effect.



Excavation of the bench in Rideau Station cavern

Rideau Station


Crocodile Rouge continues to excavate the bench at the south side of the cavern.



Formwork for concrete pours at Rideau Station east entrance

Rideau Station West and East Entrance


West Entrance: crews continue shoring micro-pile installation. Shoring is expected to continue during the next few months.

East Entrance: whaler beam pouring, curing of concrete and tensioning of support are ongoing.

Traffic restrictions on Rideau Street remain in effect.



Concrete work at Blair Station

Hurdman, Tremblay, St-Laurent, Cyrville and Blair Stations


At Hurdman Station, crews resume the installation of electrical duct banks.

At Tremblay Station, crews install rebar and pour footings.

At St-Laurent Station, work on the mudslab and concrete pours occur.

At Cyrville Station, formwork on the auxiliary building and waterproofing continue.

At Blair Station, work resumes on foundation walls including pouring.



Concrete work at Blair Station

Guideway construction – Tremblay Station


Formwork and abutment wall concrete pours continue.



Trackwork activities west of St-Laurent Station

Guideway construction – St-Laurent, Cyrville and Blair Stations


Installation of duct banks and OCS foundations resumes west of St-Laurent Station.



Exterior panel installation at Belfast Yard

Belfast Yard Administration and Maintenance Building and Yard


Crews continue working to completion. Trackwork activities occur onsite. Alstom vehicle tooling is ongoing.



Installing final sections of the connector roof

Belfast Yard Vehicle Storage Shed and Connector Works


In the connector, trackwork resumes. Crews continue installing the final sections of the roof, and working on slopes and fencing. Duct banks are being completed in the connector.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Pimisi Station mobilization.
  • West Transitway Service Adjustment on Scott Street on January 17, 2016.
  • Booth Street Bridge girder installation and deck work.
  • Lyon Station west entrance excavation including blasting.
  • Lyon Station east entrance and west shaft construction.
  • Preliminary work at Lees Station and Rideau River Bridge rehabilitation.
  • Hurdman Station permanent bus loop construction.
  • Assembly of Alstom Citadis light rail vehicles.

In the coming months:
  • Deck work at the Hurdman elevated guideway.
  • Deck pours at the Tremblay guideway.

http://www.ligneconfederationline.ca/construction/construction-update-54/
     
     
  #2679  
Old Posted Jan 13, 2016, 7:33 PM
Horus's Avatar
Horus Horus is offline
 
Join Date: Jul 2013
Posts: 1,214
On time and on budget!

http://www.1310news.com/2016/01/13/confederation-line-work-on-schedule-and-on-budget/
From 1310News

Quote:
Confederation Line work on-schedule and on-budget

by melanieadams
Posted Jan 13, 2016 2:03 pm EST

OTTAWA — A progress report Wednesday on the Confederation Line paints a picture of work that’s on-schedule and a budget that’s being met.

The expectation is that the Confederation Line will be fully in-use in the spring of 2018.

Speaking at the future site of Tremblay Station, Mayor Jim Watson says three station caverns are needed for the downtown tunnel. He says Lyon Station is complete, and Rideau and Parliament Stations are 70 per cent complete.

He adds that the LRT tunnel will be fully-excavated by this summer.

Watson says all 13 stations will be under construction before the end of the year, more than 3.5km of track have been laid so far, and the trains are now being assembled.

“2016 will be the year you will start seeing Confederation Line trains running and being tested right here in the Nation’s Capital,” Watson said Wednesday.
     
     
  #2680  
Old Posted Jan 13, 2016, 9:26 PM
Radster Radster is offline
 
Join Date: Oct 2007
Posts: 997
was hoping to hear AHEAD OF SCHEDULE and on-budget.....
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.