Quote:
Originally Posted by acottawa
I'm not sure I see the crossover thing as a positive thing. It is another example of city being unable to design a project properly and we're basically relying on RTG to correct the city's mistakes. In this case they did, but they have a fixed price contract, so they are only going correct city mistakes that are cost-neutral or save them money. I wonder how many other design problems are slipping into the system (winter for example).
|
Because RTG is also responsible for maintenance expenses for the first 30 years, the price of which has already been fixed, RTG has a motivation to construct a system that's cheaper to maintain. This is probably the reason why RTG added additional crossovers (more crossovers means that emergency/maintenance closures can be far more localized making it easier to do them).
As for the winter problem, the maintenance responsibility means RTG will value ease of winter control in stations (ie: they won't pick designs where snow clearing is difficult and/or ice can accumulate such that intense saltings are required). As for the operation of the line itself, climate proofing designs are offloaded to RTG. One of the contract stipulations for the vehicles & track is that they must be capable of fully normal operation with reasonable passenger comfort in temperatures as low -38C (lower than the lowest temperature ever recorded in Ottawa history). There's also stipulations about ensuring service standards are met during blizzards, freezing rain conditions, and even earthquakes.
Personally, I think the P3 contract should have been further reaching. RTG should also have been given responsibility for operations as well (ie: staffing and running the actual trains). The city would have retained control over frequencies, schedules, and fares, and that's it. This would have also ensured RTG used designs that result in efficient, smooth operation of the line. However, it would have meant loss of union jobs as it would not be OC Transpo staffing the trains, and this would have been a political non-starter. An attempt by the provincial government to incorporate operation in the P3 for the Eglinton line in Toronto had to be cancelled for this reason.