HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    California Pacific Medical Center Van Ness Campus in the SkyscraperPage Database

• Building Data Page   • San Francisco Skyscraper Diagram

• Map Location
• San Francisco Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 10, 2015, 6:29 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 969
Quote:
Originally Posted by cv94117 View Post
They can put a Christmas tree on the top if they want, but it's a while from being topped out.
It is topped out when the highest roof steel bar is installed. It has nothing to do with the progress of the structure as a whole. The steel installation itself isn't even finished, it simply has reached its top height. It is a tradition for ironworkers to paint the this steel bar white, and to sign it.
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects Thread ∞ Oakland Projects Thread ∞ Oceanwide Center - 275M/901'
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 5:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.