  #1701  
Old Posted Dec 9, 2015, 5:16 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by officedweller View Post
I really hope they would leave enough room in the Cut to put in another railroad track (BSFR) in order to permit expanded and more efficient WCE service to Abbotsford and Chilliwack.
Reply With Quote
     
     
  #1702  
Old Posted Dec 9, 2015, 5:24 AM
city-dweller's Avatar
city-dweller city-dweller is offline
Registered User
 
Join Date: Jul 2008
Location: Vancouver
Posts: 357
Quote:
Originally Posted by The_Henry_Man View Post
I really hope they would leave enough room in the Cut to put in another railroad track (BSFR) in order to permit expanded and more efficient WCE service to Abbotsford and Chilliwack.
I was thinking the same thing. Would it be possible to fill the entire gap with the track bed and adjust the existing track to fit two?
Reply With Quote
     
     
  #1703  
Old Posted Dec 9, 2015, 6:00 AM
casper's Avatar
casper casper is offline
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 12,974
Quote:
Originally Posted by city-dweller View Post
I was thinking the same thing. Would it be possible to fill the entire gap with the track bed and adjust the existing track to fit two?
Looks like there might even be enough room for a centre platform between the two tracks. Perhaps in a few years a Broadway WestCoast Express station.
Reply With Quote
     
     
  #1704  
Old Posted Dec 9, 2015, 6:19 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by The_Henry_Man View Post
I really hope they would leave enough room in the Cut to put in another railroad track (BSFR) in order to permit expanded and more efficient WCE service to Abbotsford and Chilliwack.
There really isn't enough traffic that goes through the cut that another track is needed. Most of the rail traffic in that corridor leaves the line at Willingdon Junction where the line branches off through the Thornton tunnel to the CN bridge across Burrard Inlet. There are only a handfull of long-haul passenger trains per day and the occasional freight bound for the interchange to the CP downtown yard. I can't imagine that it would be much of a problem to schedule such a light traffic volume to move over the single track.
Reply With Quote
     
     
  #1705  
Old Posted Dec 9, 2015, 6:21 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
There's room for two sets of tracks. But I wish they would've managed the space better.

One day I'll post my fantasy maps on here. I could potentially see up to five commuter rail lines in the region in the far future. Three of them would serve the South of Fraser cities, and would terminate at Pacific Central Station via the Grandview Cut. That would definitely mean a station at Commercial-Broadway since it would enable easy access to Central Broadway, UBC, etc...

But realistically, a "Fraser Valley Express" line will surely happen one day, and if it travels through the cut, I'm sure we'll see a station here. It's a no brainer, methinks.
Reply With Quote
     
     
  #1706  
Old Posted Dec 10, 2015, 1:16 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by aberdeen5698 View Post
There really isn't enough traffic that goes through the cut that another track is needed. Most of the rail traffic in that corridor leaves the line at Willingdon Junction where the line branches off through the Thornton tunnel to the CN bridge across Burrard Inlet. There are only a handfull of long-haul passenger trains per day and the occasional freight bound for the interchange to the CP downtown yard. I can't imagine that it would be much of a problem to schedule such a light traffic volume to move over the single track.
True, but having twin tracks in that section of BSFR would allow for all day frequent WCE service to the Fraser Valley.
Reply With Quote
     
     
  #1707  
Old Posted Dec 10, 2015, 7:27 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by The_Henry_Man View Post
True, but having twin tracks in that section of BSFR would allow for all day frequent WCE service to the Fraser Valley.
I'm having a really hard time imagining all-day WCE service that needs to be more frequent than about 20-30 minutes outside of rush hours in the foreseeable future.
Reply With Quote
     
     
  #1708  
Old Posted Dec 10, 2015, 7:32 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
Doesn't the Port expect traffic to increase by quite a bit along that line? Hence the Powell Street overpass and upcoming Malkin Connector (and overpass), and other upgrades that jlousa alluded to a while back.
Reply With Quote
     
     
  #1709  
Old Posted Dec 10, 2015, 7:50 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Quote:
Originally Posted by urbancanadian View Post
Doesn't the Port expect traffic to increase by quite a bit along that line? Hence the Powell Street overpass and upcoming Malkin Connector (and overpass), and other upgrades that jlousa alluded to a while back.
Yup - that's why the redevelopment of the False Creek Flats (and removal of the railway tracks) is no longer in the cards.
Reply With Quote
     
     
  #1710  
Old Posted Dec 10, 2015, 6:01 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by aberdeen5698 View Post
I'm having a really hard time imagining all-day WCE service that needs to be more frequent than about 20-30 minutes outside of rush hours in the foreseeable future.
Half hour frequency towards DT in the morning with hourly frequency on the way out of Vancouver.

Hourly frequency in both directions non-peak.

Half hour frequency out of DT in the evening with hourly frequency towards DT.
Reply With Quote
     
     
  #1711  
Old Posted Dec 10, 2015, 7:59 PM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Hi all

Not to mention, there is have a heavy rail/WCX Proposal discussion here.

http://forum.skyscraperpage.com/showthread.php?t=164316&page=41
Reply With Quote
     
     
  #1712  
Old Posted Dec 11, 2015, 10:35 PM
Katherine S Katherine S is offline
Registered User
 
Join Date: Oct 2015
Location: Surrey BC
Posts: 22
I don't know if this has already been discussed, but I thought I'd add it in case; Surrey has a proposal out now for the north end of the Surrey Central SkyTrain station. This has come out of their December planning reports

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0361-00.pdf
Reply With Quote
     
     
  #1713  
Old Posted Dec 11, 2015, 11:34 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by Katherine S View Post
I don't know if this has already been discussed, but I thought I'd add it in case; Surrey has a proposal out now for the north end of the Surrey Central SkyTrain station. This has come out of their December planning reports

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0361-00.pdf
A couple tidbits:
Quote:
The scope of work will include a 19-square metre (205 sq.ft.) platform expansion at the north, with a new station house 920 square metres (9,903 sq. ft.) in size. Within the new station house, a new CRU, 82.5 square metres (885 sq.ft.) in size, is proposed at the ground level.

The new 920-square metre (9,903 sq.ft.) station house has been designed as a 2-storey pavilion.

An 82.5-square metre (885 sq.ft.) commercial retail unit (CRU) is proposed adjacent the 103 Avenue entrance, encouraging activity along the street edge. It is has been strategically placed to provide views of the station's interior activities and be near the future bus pick-up bays along 103 Avenue.
Reply With Quote
     
     
  #1714  
Old Posted Dec 12, 2015, 7:20 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by Katherine S View Post
I don't know if this has already been discussed, but I thought I'd add it in case; Surrey has a proposal out now for the north end of the Surrey Central SkyTrain station. This has come out of their December planning reports

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0361-00.pdf
Thanks for posting and welcome to the forum!
Reply With Quote
     
     
  #1715  
Old Posted Dec 12, 2015, 9:54 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
According to the rendering, this will be the third station (after Scott Road and Burrard) to have separate fare paid zones for the elevator and the stairs / escalators. This is due to the fact that that they plan to have a public passageway in between to allow people to shortcut the corner.

My only nagging points are:
- Why are the widths of the two entrances different?
- I really hope that lime green isn't the shade of green that will be used in the final project...

Otherwise, I think this will be a cool addition to the Downtown Surrey area. Hopefully they will also reconstruct the southern entrances and deep-clean the station to its former glory as part of future phases.

Last edited by Millennium2002; Dec 12, 2015 at 10:06 AM.
Reply With Quote
     
     
  #1716  
Old Posted Dec 13, 2015, 4:43 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by Sheba View Post
A couple tidbits:
Some renders from the PDF





Reply With Quote
     
     
  #1717  
Old Posted Dec 14, 2015, 4:26 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
Thanks Katherine for the info!!

Some tidbits from quickly scanning the document:
- This is only the first phase. The whole station makeover is actually quite complex, and will likely require the North Surrey Arena to go before they can move on past this. The concrete walls on the west side will 🞵🞵🞵🞵 up against future development sites.
- This phase includes a new North station house, with a new elevator, and entries from the north (103rd) and the east (City Parkway).
- Future phase to include a new South station house.
- New CRU along 103 Avenue (likely a cafe).
- Surrounding paving will be similar to, and blend in with City Hall Plaza.
- Roof to be replaced in future phase.
- Once LRT is built, the sidewalk along City Parkway will expand by 3 metres.
- Translink wants to start work in May, 2016.

Here's another render from the document:

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0361-00.pdf
Reply With Quote
     
     
  #1718  
Old Posted Dec 14, 2015, 11:06 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Nice, thanks!
Reply With Quote
     
     
  #1719  
Old Posted Dec 15, 2015, 6:26 AM
Katherine S Katherine S is offline
Registered User
 
Join Date: Oct 2015
Location: Surrey BC
Posts: 22
Thanks for the welcome!

My main worry with the renovation planned in the report is the width of the sidewalk currently (that is, until the LRT gets built). With the 502 stop located not too far away, it is possible that it's going to get quite busy and crowded at that corner.
Reply With Quote
     
     
  #1720  
Old Posted Dec 19, 2015, 4:11 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,980
I was at Commercial/Broadway today and took these pics. The first two are looking from East 10th Ave, the 3rd - 5th are looking from Broadway, the last 3 are looking into the ravine.



Dec.18 '15, my pics





















Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:58 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.