Originally Posted by osirisboy View Post
I agree with things like museums that are showcasing national artifacts/exhibits that federal government owns. But what makes the nac national? And let's be honest the city is hugely benefitting from it.
It is very rare that lower levels of government contribute to higher level projects. You look at museums, as you mentioned, and the Queensway widening, all paid for by the province yet hugely beneficial to the City. The only case I can think of where the City, all cities, contribute to provincial projects are Convention Centres.

Then you look at places like Toronto and Vancouver who have to invest little or no money for transit lines (Go Transit (free for TO), the Crosstown (built by the province and to be handed over to the TTC for free), Skytrain (largely funded by the province).

As for private donations, their is very little chance to have any private partner investing in this. The only way it would happen is if we sold naming rights to the building or halls.
Reply With Quote
     
     
  #62  
Old Posted Jan 23, 2015, 5:55 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
NAC issues call for a contractor for renovation project

Peter Robb, Ottawa Citizen
Published on: January 23, 2015, Last Updated: January 23, 2015 12:29 PM EST


The National Arts Centre has taken the first step twoard the eventual renovation and enhancement of the construction of a new entrance to the capital major performing arts space.

The centre is looking for a firm that will lead the $80 million construction of a new glass facade that will wrap around the north face of the 45-year-old building that faces Parliament Hill and the National War Memorial.

The entire project is expected to cost about $110 million and is to open July 1, 2017, the 150th anniversary of Canada.

At the end of what is know as a call for Expressions of Interest, four firms will be asked to prepare proposals for the build. Out of that one firm will be chosen.

The project promises to be a unique one with virtually all of the facade constructed of glass.

The project, designed by Toronto’s Diamond and Schmitt Architects, will include “improved performance spaces, public areas for education and events, full accessibility for people with mobility challenges, and a magnificent glass atrium and entrance,” the NAC said in a media release. The project team also includes Crossey Engineering Ltd. for Mechanical and Electrical, and Fast + Epp for Structural.

The call for Expressions of Interest will be advertised nationally through MERX and the Ottawa Construction Association.

http://ottawacitizen.com/entertainment/l...-for-a-contractor-for-renovation-project
Reply With Quote
     
     
  #63  
Old Posted Feb 2, 2015, 9:30 PM
TheGoods TheGoods is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 309
Interestig article today from the Globe and Mail on the NAC retrofit called "Goodbye concrete shroud – hello dazzle fit for a capital":

http://www.theglobeandmail.com/report-on...azzle-fit-for-a-capital/article22748352/

Link to pictures / rendering of the retrofit (most of these have been already posted):
http://www.theglobeandmail.com/report-on...-makeover/article22748506/?from=22748352

Last edited by TheGoods; Feb 2, 2015 at 10:13 PM.
Reply With Quote
     
     
  #64  
Old Posted Feb 4, 2015, 8:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Thanks for posting.

Not super specific, but it seems they are planning on doing... something to improve/encourage people to use the roof top terrace.

Quote:
A new glass facade will drop over the terraces that extend north from the complex built in the Brutalist style, adding 36,000 square feet of indoor space to the existing 1.2 million.

These terraces, designed by original NAC architect Fred Lebensold, are considered part of the building’s official footprint – a grand promenade leading to the canal. But his team’s grand plan, of socialites canoodling on these terraces in tuxedos and ball gowns on their way to the symphony or ballet, never materialized.

The new extension is a scheme to reclaim that dream – sort of. The NAC’s team wants to dispel the notion that it’s reserved exclusively for people with closets full of gowns and coattails. “Even though I appreciate it from an architectural perspective,” says NAC Foundation chief executive officer Jayne Watson, the original design “doesn’t give a sense of welcome to the general public.”
http://www.theglobeandmail.com/report-on...azzle-fit-for-a-capital/article22748352/
Reply With Quote
     
     
  #65  
Old Posted Feb 21, 2015, 3:34 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
Re-Imagining the NAC

Please join Adrian Burns, Chair of the NAC’s Board of Trustees and NAC President and CEO Peter Herrndorf for a fascinating discussion about the architectural renewal of the National Arts Centre.

Canadian architect, Donald Schmitt is our keynote, and will share his design with the public. His firm, Diamond and Schmitt Architects, has designed internationally acclaimed performing arts centres including La Maison Symphonique in Montreal, the Four Seasons Centre in Toronto and the recently opened Mariinsky II Theatre in St. Petersburg, Russia. Come and see the plans for the new NAC, which will open in 2017.

Refreshments will be served.


Annual General Meeting

Re-Imagining the NAC
February 26, 2015, 6:00pm
NAC Salon



http://nac-cna.ca/en/event/11147
Reply With Quote
     
     
  #66  
Old Posted Jun 26, 2015, 1:51 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
NCC gives preliminary approval for NAC rejuvenation

Patrick Smith, Ottawa Citizen
Published on: June 25, 2015 | Last Updated: June 25, 2015 5:29 PM EDT


The National Arts Centre is one step closer to a re-design that will give way to a more modern look.

The National Capital Commission gave preliminary approval on Thursday to the concept design of the rejuvenation project, first announced in December 2014, which will see the concrete building get dragged, kicking and screaming, into the 1990s. Final approval will come at a future board meeting.

The original design of the building faced the front door toward the Rideau Canal, with the expectation that a pathway would be built to make it highly visible and accessible. But those plans never materialized, resulting in an awkwardly placed main entrance that was more difficult to access.

The new design, which would open on July 1, 2017, according to the proposed timeline, would see the addition of an atrium opening directly out onto Elgin Street. The multi-storey glass-panelled area, which would help soften the blunt and aggressively angular aspects of the building, would also provide for expanded public and event spaces.

Meetings will be held with the advisory committee on planning, design and realty in August and October for informational purposes and to allow for comment. Under the current proposed timeline, the NCC board would give its final approval in January 2016, with the groundbreaking on the project next spring.

http://ottawacitizen.com/news/local-news/nac-gives-preliminary-approval-for-nac-rejuvenation
Reply With Quote
     
     
  #67  
Old Posted Jul 1, 2015, 5:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
First off, love this quote:

"The National Capital Commission gave preliminary approval on Thursday to the concept design of the rejuvenation project, first announced in December 2014, which will see the concrete building get dragged, kicking and screaming, into the 1990s. Final approval will come at a future board meeting."

Second issue, this is a ridiculously ambitious time frame in any circumstance: construction start in Spring of 2016, ready by July 1, 2017. Add in the possibility that they may very well find more human remains on that site, and it could very well be impossible to even have the frame up by Canada Day 2017.
Reply With Quote
     
     
  #68  
Old Posted Jul 2, 2015, 4:42 PM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 486
There were three presentations yesterday at the NAC that included a brief talk from Donald Schmitt (architect at Diamond Schmitt Architects who is doing the expansion).

http://nac-cna.ca/en/event/12205

He showed some images of the rejuvenation that have not yet been shown which were interesting. I was absolutely shocked that they are planning to do/complete construction in 13-14 months. It seems unlikely to me that this will be enough time to do the work properly and I feel like this building deserves better.
Reply With Quote
     
     
  #69  
Old Posted Nov 12, 2015, 6:31 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
NAC Stories
Re-imagining the NAC

Building Brilliance

October 6, 2015


On Canada Day in 2017, the National Arts Centre will be opening its dazzling new addition to the public as part of Canada’s 150th anniversary. The “new” National Arts Centre will include a glittering entrance on Elgin Street, facing Confederation Square with improved performance and public spaces that will enjoy one of the most magnificent views of the nation’s capital.

On December 10, 2014, the former Minister responsible for the National Capital region, the Honourable John Baird announced that $110.5 million would be invested into the architectural rejuvenation of the National Arts Centre.

The building will remain open throughout the construction period which is set to begin sometime during the first few months of 2016. Audience members will be invited to take part in our “theatre of construction” through monthly events, public talks, and site visits.

The NAC is working with one of Canada’s most celebrated architects, Donald Schmitt to design the new addition. PCL has won the construction management contract. Both firms are renowned for beautiful work and are committed to ensuring a grand opening for Canada Day in 2017.

For more information about the architectural renewal of the NAC please send us an email at: [email protected]


http://nac-cna.ca/en/stories/story/building-brilliance
Reply With Quote
     
     
  #70  
Old Posted Nov 24, 2015, 12:56 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
NAC's renewal to begin in December

Peter Robb, Ottawa Citizen
Published on: November 23, 2015 | Last Updated: November 23, 2015 4:13 PM EST




Renovation of the National Arts Centre will begin in December.

The start of work is earlier than originally proposed to ensure that the completion of a new Elgin Street atrium entrance by July 1, 2017. Work on the NAC’s main banquet space, the Panorama Room, will be finished by January 2018.

The $110 million project will see improvements to performance spaces, public areas for education and events, full accessibility for people with mobility challenges, and a sparkling glass shell that will encompass the side of the NAC facing Elgin Street and the National War Memorial.

The project is designed by the architectural firm Diamond Schmitt. The builder is PCL Constructors Inc. The NAC will stay open for business during the renovations.

“The decision to stay open wasn’t an easy one,” said Peter Herrndorf, CEO of the National Arts Centre, in a media release. “We were very aware that the work involved for a project of this scale would mean a good deal of inconvenience to our patrons. On the other hand, we knew that our audience depends on us to bring the best of the performing arts to the Nation’s Capital. In the end, and after careful consideration, we’ve decided to remain open during the 2015-2016 and 2016-17 artistic seasons.”

Here are some of the impacts of the construction.

On performances

Construction will occur outside performance hours on weekdays between midnight and 2 p.m. Evening and weekend shows will go ahead as planned. Because of daytime construction, some school matinées, daytime performances and rehearsals will be cancelled or moved within the NAC or to other venues across the city. The Fourth Stage will be closed starting in the spring of 2016 until July 2017, however many of the shows and community events presented here will be moved to other the Centre’s performance halls.

On Le café

Due to the daytime disruption caused by the renovation, le café will be closing for lunch from January 4, 2016 until June 26, 2017. Le café will remain open, however, for dinner in the evening. The NAC’s catering operations will be considerably reduced during the renovations.



On construction

The public will begin to see physical changes to the building between December and January, including hoarding that will be installed on Elgin Street and on the northeastern side of the terrace overlooking Confederation Square. PCL will also begin to remove concrete tiles on the north terrace in January. Inside the NAC, work will begin near the Fountain Room and in the space between the main reception desk and the Theatre lobby. Visitors may also see some work being done in the garages to strengthen some of the NAC’s supporting structure.

On washrooms

One of the first projects will be a new bank of washrooms on the second floor, near the Panorama and Fountain Rooms. Existing washrooms on the ground floor will remain in operation until the second phase of construction, which will begin in March-April 2016. By that time, the NAC says, the new washrooms will be ready.



On the box office

The area will be a busy construction zone so a temporary box office will be established near the NAC in the New Year. This will be a full-service welcome centre open from 9 a.m. to 5 p.m. The NAC’s main box office will be operational from 5 p.m. to 9 p.m.

On pedestrian access

The NAC will maintain four entrances to the building: from Elgin Street, Freiman Lane and Mackenzie King Bridge. The public will also be able to enter from the parking garage which will stay open throughout the construction.



On car access

A gate will be installed at the entrance of Freiman Lane this winter that will prevent car access to the NAC during construction from midnight to 2 p.m. The NAC parking garage will be accessible from the Elgin Street and Albert Street entrances.

More information is available at nac-cna.ca.

http://ottawacitizen.com/entertainment/local-arts/nacs-renewal-to-begin-in-december
Reply With Quote
     
     
  #71  
Old Posted Nov 26, 2015, 3:37 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
NAC's Herrndorf writing to patrons about the renovation road ahead

Peter Robb, Ottawa Citizen
Published on: November 25, 2015 | Last Updated: November 25, 2015 12:15 PM EST


Over the next few days, 32,000 subscribers to programming at the National Arts Centre will be getting a letter from Peter Herrndorf.

The savvy NAC CEO knows that if the centre is not open and up front about what will confront patrons, he risks a backlash.

And so, in an old school sort of way, he is putting a figurative pen to paper to get out ahead of the start of the $110-million renovation project that will be a part of the institution’s daily life for the next 18 months. The project will bring the largest change to the centre since it was built in 1969.

The centre was deliberately built with its back to Parliament facing the Rideau Canal because of a series of design plans that never materialized.

As a result, a major national institution had “its back to the national capital,” Herrndorf said.

So the current renovation has two main goals, he says.

“One of the goals of the whole architectural rejuvenation of the NAC, was the idea of turning the building on its axis so that it could not only face the national capital, but embrace the national capital.

“If you are going to have this kind of centre, it has to embrace the capital,” Herrndorf said in an interview.

“The second thing is the building is dark and a bit forbidding and so the goal was to make it full of natural light, make it transparent and accessible so that people would feel that not only is it their performing arts centre but that it is their community centre; a place that they felt was theirs.”

As a result of the improvements to the centre’s second floor, Herrndorf says there will be activities happening all day long from professional performers, to local choirs singing, to classes, to lectures. The centre will establish a new unit to lead the animation of the NAC’s public spaces, he says.

Timing was an important consideration for getting the renovation approved. The 150th birthday of the country was a natural hook, and the 50th anniversary of the opening of the NAC in 2019 added to the sense of appropriateness of the development, he said.

He says he feels that the project’s principal architect, Donald Schmitt of Toronto-based Diamond Schmitt, understands and respects the original “brutalist” architecture of the building created by Fred Lebensold.

When it is finished, the NAC renovation, which will feature a massive glass jewel box, will complete a ring of major national institutions that circle Parliament Hill, from the glassy National Art Gallery designed by Moshe Safdie to Douglas Cardinal’s undulating Canadian Museum of History and the Canadian War Museum of Raymond Moriyama. What’s next? Maybe the new Liberal government will resurrect the idea of a National Portrait Gallery.

“When Canadians come into the ceremonial heart of the country, we hope that they will be proud of this building. … It symbolizes the performing arts from coast to coast to coast,” Herrndorf said.

He is making himself available to the public in this process, he says, to ensure that the NAC gets the “tone” right when talking to the public about the project.

“If we got the tone wrong, it would really set us back,” he said. The renovation will definitely affect the patron experience at the NAC, which will stay open for business throughout construction. The centre is limiting work to off-performance hours — from midnight to 2 p.m. each weekday. Southam Hall, the Theatre and Studio will continue to operate throughout. The Fourth Stage will close next May and remain shuttered until July 2017, but other spaces are available for the kinds of events that took place there, such as concerts that are part of the Ottawa Jazz Festival.

“It was very important that we be very straightforward with the subscribers and with major ticket buyers, that we explain that this won’t be an easy process. There will be real inconvenience involved, but this is a journey that we want to go on together.”

The NAC needs patrons to keep coming to its performances and intends to make it as easy as possible, but there will be bumps on the road, he says.

Herrndorf will send five or six letters in all with the first going out this week and a second in late January or early February. Construction begins in December. Patrons will be able to reply to Herrndorf by a variety of means from text message to e-mail to snail mail. He and his staff will no doubt be occupied.

He says he expects a lot of communication in the early stages, some of which might even highlight things the centre has not thought of and make sense. The NAC is prepared to adapt, he added.

Of all the changes that will be wrought inside and outside the NAC, from expanded space for community use to a glass facade to more washrooms for patrons, Herrndorf says he wants the renovation to say to the public: “Please walk on the grass, please come in at any hour of the day.”

“When I came here 16 years ago what everybody told me is the audience of the NAC is extremely knowledgable and extremely proprietary … in a good way. We now hope the exntended audience will feel proprietary.”

The position of the NAC, close to the National War Memorial, means security is part of the renovation equation.

Herrndorf says the organization is realistic about the world “around us.” So the NAC will be involved in a balancing act between openness and security.

“The worst thing we could do is create the sense of a fortress. You want security that is effective but subtle.”

As the NAC renews itself, it is with a backdrop of struggling local arts institutions, chief among them being Opera Lyra, which is now in the hands of a bankruptcy trustee owing almost a million dollars to the NAC.

“I’m a citizen of the capital. That fact that our major opera company had to close is very disappointing. Having said that, my hope is that maybe next month or next year or two years from now, a group of people will come together and say it’s really important that we have (opera) here.

“I think there is so much about the capital that is flourishing. I think the National Gallery, led by Marc Meyer, is doing extremely well. I like very much what the Museum of History is doing and the War Museum and the other museums. The National Arts Centre has been on a roll for several years. So on balance, the picture is very good.”

Herrndorf is appointed by the NAC board and over the years he has had a number of extensions. He prefers shorter contracts. At 75, Herrndorf says he will be in his post into 2017. He will not say whether he will stick around for the 50th in 2019.

The renovation will not fix everything inside the centre. Other things need renewal, none more so than the main performance space, Southam Hall. Herrndorf says fixes are coming there too.

“It is the next step and I hope it is sooner rather than later. There are a bunch of changes we have to make to Southam Hall.”

This also includes a plan for the massive multi-coloured curtain that opened the centre in 1969.

“That curtain is a piece of art. It has become tricky as a curtain. We have been spending a lot of time looking at that.” He is expecting a new set of ideas for what to do with the curtain in the next few months.

Relations with the former Conservative government were beneficial to the NAC. Laureen Harper was very active with the NAC Foundation and former cabinet minister John Baird was instrumental in getting the funding for the renovation.

Herrndorf, who is an old hand at dealing with governments at many levels, called the relationship with the Tories a “very good professional relationship. I’m completely confident we will have a very good professional relationship with the current government.”

One of the ways forward for the NAC is a major emphasis on creation of new Canadian work.

He says the centre is very close to announcing a major program aimed at generating a lot of new work. He hopes the NAC will serve as a catalysing agent for new work across the country, from theatre to art music. While he refused to be specific, partnerships with performing arts groups across the country will no doubt be one part of this plan.

Hints of the coming effort have been showing up in an advertising campaign featuring talented Canadians such as the Edmonton composer John Estacio, the Newfoundland playwright Robert Chafe and the B.C. choreographer Crystal Pite, as artists who create new work and as such are important figures in Canada’s cultural scene, he says.

http://ottawacitizen.com/entertainment/l...-patrons-about-the-renovation-road-ahead
Reply With Quote
     
     
  #72  
Old Posted Nov 26, 2015, 3:59 AM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 415
Reply With Quote
     
     
  #73  
Old Posted Nov 26, 2015, 12:17 PM
m3i6's Avatar
m3i6 m3i6 is offline
Registered User
 
Join Date: Jul 2009
Posts: 83
Quote:
Originally Posted by RobOttawa View Post
..And please note that after the show; spectators will be involved in an entertaining, live game of Frogger as street lights have now been removed from Elgin.
Reply With Quote
     
     
  #74  
Old Posted Nov 26, 2015, 2:13 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,930
Quote:
Originally Posted by m3i6 View Post
..And please note that after the show; spectators will be involved in an entertaining, live game of Frogger as street lights have now been removed from Elgin.
But they've taken away a lane of traffic, so frogger will be easier.
Reply With Quote
     
     
  #75  
Old Posted Nov 26, 2015, 4:33 PM
Speedy Gonzales Speedy Gonzales is offline
BANNED
 
Join Date: Nov 2015
Posts: 23
The guy who designed this is about as creative as the guy who designed the Japanese flag.

Out
Reply With Quote
     
     
  #76  
Old Posted Nov 26, 2015, 8:12 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,680
I expect that everyone will be much happier seeing an image of a dancing girl on a blank wall instead of the current view of the Chateau Laurier.
Reply With Quote
     
     
  #77  
Old Posted Nov 26, 2015, 8:33 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Looking at those renderings, I'd love to see some sort of walk of fame outside the NAC, along both Elgin and Albert. You could make it very Ottawa and have it be for winners of the Governor General's Performing Arts Award to differentiate it from the walk of fame in Toronto.
Reply With Quote
     
     
  #78  
Old Posted Nov 26, 2015, 9:10 PM
jitterbug jitterbug is offline
Registered User
 
Join Date: Dec 2006
Posts: 259
Quote:
Originally Posted by Richard Eade View Post
I expect that everyone will be much happier seeing an image of a dancing girl on a blank wall instead of the current view of the Chateau Laurier.
True, the view of the Chateau is blocked in this image, though the reality is no one will actually have the vantage point being depicted (except the occasional bird).
Reply With Quote
     
     
  #79  
Old Posted Nov 27, 2015, 12:18 AM
Marshsparrow Marshsparrow is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,680
lipstick on a pig...
Reply With Quote
     
     
  #80  
Old Posted Nov 27, 2015, 2:08 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by Marshsparrow View Post
lipstick on a pig...
Yeah, but depending on the shade of lipstick it could be one — pig.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.