Quote:
Originally Posted by lrt's friend
Where have I heard the bolded part before?
What possible justification is there for doing that after building ridership over a 20 year period on the south east transitway?
We all know the market for the Trillium Line and Southeast Transitway are completely different.
I went the Red Blacks game today. How was I to get there if it weren't for the Southeast Transitway? Or do you want me to go back to using my car to get to Lansdowne?
I thought we were supposed to spending our money to actually 'improve' transit.
We have just gone through this exercise with additional double tracking. And what did it buy us? We were able to move from 15 minute frequency to the less than expected 12 minute frequency, with little hope of improving on that.
So we double track other little sections and throw on even more trains. If we continue to do that, there will be diminishing returns. More disjointed double tracks just means more places for trains to have to slow down to wait for a passing train. And we end up with longer trip times and not much of an improvement in frequency. Furthermore, the limits of the track are determined by the longest stretch of single track. If the difficult parts remain from the Dow's Lake tunnel to near Gladstone Avenue and the Rideau River Bridge, then our service cannot be improved significantly beyond what we have today.
Let's face it, if we want 5 minute frequency (the original proposal from a decade ago), you need full double tracking. If you want to deliver fast and reliable service, you need full double tracking absolutely.
And the more we tinker with this line, the more money will be wasted, and the more service closures will have to happen.
The time for double tracking should be sooner than later, otherwise costs will escalate as we need to take more and more costly actions in order to keep the line open as much as possible or to provide an adequate alternative.
|
Removing the SE Transitway south of Heron Road would only be possible if the Bank Street subway was built, and then that operated parallel at least to Greenboro Station (whether it moves to the Transitway ROW, remains on Bank or somewhere else). There is no way it can be removed from Heron Road to Hurdman, as it carries too much traffic even among those not going downtown (i.e. from the east end to the hospitals, to Baseline Road, to Carleton, to Confederation Heights, etc.).
Yes, the cost would be enormous, but a Bank Street subway does have a few huge advantages:
1) MASSIVE capacity increases for Lansdowne events like football games - no more having to run so many extra buses. Just run peak period-level train service.
2) A direct route from the south to downtown on the fastest route possible, resulting in huge time savings for commuters going downtown. South Keys to downtown could probably be done in under 15 minutes, which is unthinkable today.
3) Possible connection with a Montreal Road route for easy access between south and east, and could be done concurrently.
4) Protects the Trillium Line for an extension across the Ottawa River.
5) Rapid transit service maintained to Billings Bridge, and introduced to Centretown, Glebe and Old Ottawa South - much faster than the current 1 and 7.