  #3481  
Old Posted Nov 6, 2015, 9:21 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Go Suns!

Anyhow, the southwest tower crane is slated for dismantling on Nov 26th, and the northwest crane is to follow suit on Dec 14th.
Reply With Quote
     
     
  #3482  
Old Posted Nov 7, 2015, 12:09 AM
HomerSPC's Avatar
HomerSPC HomerSPC is offline
Registered User
 
Join Date: Apr 2014
Location: Regina, Sk
Posts: 459
Quote:
Originally Posted by SkydivePilot View Post
Go Suns!

Anyhow, the southwest tower crane is slated for dismantling on Nov 26th, and the northwest crane is to follow suit on Dec 14th.
That means that the concrete structure will be essentially complete by mid-December!?
Reply With Quote
     
     
  #3483  
Old Posted Nov 7, 2015, 12:18 AM
OOO AHH OGEMA OOO AHH OGEMA is offline
Registered User
 
Join Date: Sep 2013
Posts: 97
Quote:
Originally Posted by HomerSPC View Post
That means that the concrete structure will be essentially complete by mid-December!?
I can see that being the case. Also, the large portable crane that was lifting pre cast slabs into place appears to be gone.
Reply With Quote
     
     
  #3484  
Old Posted Nov 7, 2015, 1:09 AM
HomerSPC's Avatar
HomerSPC HomerSPC is offline
Registered User
 
Join Date: Apr 2014
Location: Regina, Sk
Posts: 459
Quote:
Originally Posted by OOO AHH OGEMA View Post
Also, the large portable crane that was lifting pre cast slabs into place appears to be gone.
I'm guessing it will reappear start of December. No sense having the crane sit idle with nothing to do.
Reply With Quote
     
     
  #3485  
Old Posted Nov 7, 2015, 2:56 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by HomerSPC View Post
I'm guessing it will reappear start of December. No sense having the crane sit idle with nothing to do.
I was informed that the big yellow crane is moving to the other side. As to now or later, I'm not sure.
Reply With Quote
     
     
  #3486  
Old Posted Nov 9, 2015, 3:56 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
I hear most of the major structure is complete along with the majority of the concrete slabs.

There are a number of ramps and risers left to be poured however.
Reply With Quote
     
     
  #3487  
Old Posted Nov 9, 2015, 5:45 PM
Nathan's Avatar
Nathan Nathan is offline
Hmm....
 
Join Date: Mar 2007
Location: Regina
Posts: 3,505
New overhead view as of Saturday:



Source: Twitter - @KentondeJong


There was also an update on progress and information on future stages released... From the Regina Revitalization website:

Quote:
Spectator Roof, LED Lighting & Seating Progress – Construction is 60 per cent Complete

Officials from the City of Regina and PCL Construction provided an update on the spectator roof, lighting and seating for the Regina Revitalization Initiative Stadium Project, which is approximately 60 per cent complete.

“These key features show just how different our new stadium will be compared to the current facility. Spectators, performers and athletes will enjoy these features and our beautiful new stadium for generations,” said Mayor Michael Fougere. “It’s exciting to see the progress that has been made by PCL and the City team since ground was broken over 500 days ago.”

“A spectator roof and improved lighting and seating are essential features of our new stadium,” said Brent Sjoberg, Deputy City Manager & COO, executive lead for the Regina Revitalization Initiative. “PCL has teamed-up with world-class suppliers to deliver a modern and iconic multi-purpose facility for our community that everyone can be proud of.”

Substantial completion of the stadium is scheduled for August 31, 2016 with the first Rider game taking place in the new stadium in June 2017.

-----

Spectator Roof – FabriTec (Dallas TX) – North America’s leading Design/Build tension fabric roof specialty contractor will begin installation of 130,800 square feet of Polytetrafluoroethylene (PTFE) fabric roofing in the spring of 2016. The material is translucent, which will allow maximum daylight into the stadium and also provides shading.

Other notable FabriTec tensile membrane roofs include BC Place in Vancouver and Omnilife Stadium in Guadalajara, Mexico and the London Olympic Stadium.

fabritecstructures.com

-----

LED Lighting – Ephesus Lighting (Syracuse NY) – Approximately 400 LED fixtures with wireless control will illuminate the new stadium and provide an improved experience for athletes, performers and spectators with an industry leading glare control system. The LED lighting system will also be turned on and off with the flick of a switch. Ephesus fixtures typically provide energy savings of 75 per cent compared to traditional sports lighting. Regina’s new stadium will be the first in the Canadian Football League with LED lighting.

Other notable Ephesus lighting projects include University of Phoenix Stadium and US Bank Stadium in Minnesota.
Installation of the lighting fixtures will begin this fall. The LED lights will be turned on for the first time in the spring of 2016.

ephesuslighting.com

-----

Seating – Irwin Seating (Grand Rapids MI) – The world’s leading manufacturer of public seating will be installing green Solara seats. Each seat will be rail-mounted with an armrest and drink-holder. General admission seats will be 20” wide. The average distance between rows is 33”. The majority of the seating will be installed in the spring of 2016.

Notable facilities with Irwin seats include Lucas Oil Stadium in Indianapolis and Commonwealth Stadium in Edmonton.

irwinseating.com
There are also some more photos available on the Revitalization site.
Reply With Quote
     
     
  #3488  
Old Posted Nov 9, 2015, 6:18 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
It looks like this is the GA seat. Just add the cupholder option and pretend they are green. They are a different model than Commonwealth's, which are not on rails.


http://www.irwinseating.com/facility-type/arena-stadium-seating/outdoor-fixed/
Reply With Quote
     
     
  #3489  
Old Posted Nov 9, 2015, 6:25 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
Looking good Regina!

PS. Cup holders will likely be on the back of the seat in front of you.
Reply With Quote
     
     
  #3490  
Old Posted Nov 9, 2015, 9:33 PM
OOO AHH OGEMA OOO AHH OGEMA is offline
Registered User
 
Join Date: Sep 2013
Posts: 97
Quote:
Originally Posted by bomberjet View Post
Looking good Regina!

PS. Cup holders will likely be on the back of the seat in front of you.
Reply With Quote
     
     
  #3491  
Old Posted Nov 9, 2015, 9:41 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
Those look like the exact seats. Maybe Riders will get a lighter, brighter green. More in line with the uniform colour.

Is there an advantage to having the seats on a rail? Maintenance would be easier it seems. Is there a comfort factor?
Reply With Quote
     
     
  #3492  
Old Posted Nov 9, 2015, 9:50 PM
Dan0myte Dan0myte is offline
Registered User
 
Join Date: Jul 2009
Posts: 927
Quote:
Originally Posted by bomberjet View Post
Is there an advantage to having the seats on a rail? Maintenance would be easier it seems. Is there a comfort factor?
Very easy to remove and replace if broken
Reply With Quote
     
     
  #3493  
Old Posted Nov 9, 2015, 10:46 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
^No doubt.

TNSE in Winnipeg is tasked with raising approx. 6000 seats in the upper deck at MTS Centre by 2.5". They installed loge seating and handrails this past summer that created obstructed views. Solution, raise all the seats. Yikes.

Might have been easier if they were on rails. Instead they're putting in a piece of steel bar underneath every single seat support.
Reply With Quote
     
     
  #3494  
Old Posted Nov 9, 2015, 11:09 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by bomberjet View Post
Those look like the exact seats. Maybe Riders will get a lighter, brighter green. More in line with the uniform colour.

Is there an advantage to having the seats on a rail? Maintenance would be easier it seems. Is there a comfort factor?
I think they are cheaper and quicker to install (less drilling through concrete for each seat). Old Mosaic has them in the end zones. The one drawback is they are not as solid. When the big guy down the row sits down, he rocks your seat as well.
Reply With Quote
     
     
  #3495  
Old Posted Nov 9, 2015, 11:33 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
It looks like they had some samples in place today for the media. I hope they aren't that dark. That is not Rider Green.


CJME.com
Reply With Quote
     
     
  #3496  
Old Posted Nov 10, 2015, 12:25 AM
Nathan's Avatar
Nathan Nathan is offline
Hmm....
 
Join Date: Mar 2007
Location: Regina
Posts: 3,505
Quote:
Originally Posted by Stormer View Post
It looks like they had some samples in place today for the media. I hope they aren't that dark. That is not Rider Green.


CJME.com
That looks like the reverse of what Edmonton did (more Rider-ish green on the upper tier at Commonwealth).
Reply With Quote
     
     
  #3497  
Old Posted Nov 10, 2015, 1:03 AM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by Nathan View Post
That looks like the reverse of what Edmonton did (more Rider-ish green on the upper tier at Commonwealth).
The City guy said on the LP video that this is not the final colour
Reply With Quote
     
     
  #3498  
Old Posted Nov 10, 2015, 1:14 AM
HomerSPC's Avatar
HomerSPC HomerSPC is offline
Registered User
 
Join Date: Apr 2014
Location: Regina, Sk
Posts: 459
Quote:
Originally Posted by Stormer View Post
I hope they aren't that dark. That is not Rider Green.
Seeing as they look the exact same green as the previous picture posted, I'd assume that that is just a standard green seat and that the stadium will have specially colored ones.
Reply With Quote
     
     
  #3499  
Old Posted Nov 10, 2015, 2:40 AM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Yeah, the guy in the LP video said these seats are just samples, our stadium seats "will be a slightly different shade".
Also, I'm surprised that rail the seats are on is aluminum....I initially assumed it was galvanized metal.
Reply With Quote
     
     
  #3500  
Old Posted Nov 10, 2015, 3:40 AM
Nathan's Avatar
Nathan Nathan is offline
Hmm....
 
Join Date: Mar 2007
Location: Regina
Posts: 3,505
Quote:
Originally Posted by Stormer View Post
The City guy said on the LP video that this is not the final colour
Thank god!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:58 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.