Quote:
Originally Posted by Urbana
Almono is something that I see being built out and evolving over the course of maybe 30 or 40 years. There is just not enough demand for that much industrial space/residential right now. Regardless, that is a really great looking plan for a place that could one day be an important part of the city.
|
My worry with Almono is there will be huge pressure to "get it built" which will lead to substandard choices. These include.
1. Having the office/commercial portion be too office-park and not hewing to proper urban design standards. Essentially the U.S. Steel building debacle on steroids.
2. Turning the residential portions into "mixed-income" housing. Don't get me wrong, there is a real need for affordable housing in the East End, and I hardly think it would make Hazelwood worse. But if Almono goes down the mixed-income route it basically precludes market-rate redevelopment of "old Hazelwood" from happening any time soon, which in turn means we're going to be left with a lot of vacant lots on Second Avenue for decades and decades to come.